| LAGOS STATE GOVERNMENT | |||||||
| STATE TENDERS BOARD | |||||||
| LIST OF CONTRACTS AWARDED | |||||||
| PERIOD :JANUARY-DECEMBER 2008 | |||||||
| S/N | PROJECT TITLE | MINISTRY/ AGENCY | CONTRACTOR | CONTRACT SUM | DATE OF AWARD | COMPLETION PERIOD | APPROVED DOWN PAYMENT |
| 1 | Rehabilitation of Ibeh Road , Oshodi-Isolo LGA | Office of Infrastructure | Combination One Limited | 189,894,693.78 | 05/12/2007 | 90 Days | 40% |
| 2 | Rehabilitation of Idimu Mobile Police Barracks Access Road, Off Egbeda/Idimu Carriageway , Alimosho L.G.A | Office of Infrastructure | Lava Greenland Integrated Ltd | 91,200,000.00 | 05/12/2007 | 60 Days | 40% |
| 3 | Security Command Centre, Alausa | Office of Works | Moreno Group | 283,065,939.60 | 17/01/08 | 8 Months | 60% |
| 4 | Construction of four storey 100 Bed Maternal and Child Complexes at Ikorodu, Isolo and Ifako Ijaiye General Hospitals | Ministry of Health | Deux Project Limited | 1,346,565,901.20 | 28/01/2008 | 12 Months | 70% |
| 5 | Design and Construction of the Improvement Drainage Channel between Mushin and Cele Bus Stop | Office of Drainage Services | Dully Dredging and Construction Co. Ltd. | 3,579,664,108.22 | 28/01/2008 | 50% | |
| 6 | Improvement of Traffic Gridlock Location on some Roads | Ministry of Transportation | a. Consteng Nig. Ltd. i. Former Toll Gate, ii. Descent of Anthony Bridge, iii. Mobolaji Bank Anthony Way and iv. Micheal Otedola Estate Road (under the bridge) | 244,803,603.60 | 01/02/2008 | 3 Months | 50% |
| 7 | Improvement of Traffic Gridlock Location on some Roads | Ministry of Transportation | b.Lopek Nig. Ltd. i. Falomo Bridge by Ozumba Mbadiwe, ii. Construction of Round About at Billingsway, Ikeja, iii.Improvement of Maryland under pass (odo-iyalaro) and iv. Expansion of Town Planning Way, Illupeju | 180,000,000.00 | 01/02/2008 | 10 Weeks | 50% |
| 8 | Rehabilitation of Ago Palace Way, Amuwo - Odofin Phase II | Office of Infrastructure | CCECC | 545,737,500.00 | 01/02/2008 | 4 Months | 50% |
| 9 | Infrastructural Improvement of Yaba (Jibowu) to Iddo - Mainland LGA Phase II | Office of Infrastructure | PW Nigeria Ltd. | 4,990,842,658.80 | 01/02/2008 | 10 Months | 50% |
| 10 | Upgrading/Rehabilitation of Apapa Central Business District (CBD), Apapa LGA Phase II | Office of Infrastructure | Julius Berger | 4,871,732,497.27 | 01/02/2008 | 9 Months | 50% |
| 11 | Construction of Okota - Itire Overhead Link Bridge and Road Works | Office of Infrastructure | CCECC | 6,957,111,425.00 | 01/02/2008 | 6 Months | 50% |
| 12 | Holistic Approach to Road Development in Lagos State Year 2007 - 2010 (Alimosho LGA) | Office of Infrastructure | Hitech Construction | 6,603,904,046.72 | 01/02/2008 | 10 Months | 50% |
| 13 | Rehabilitation of Comfort Oboh Street, Kirikiri, Amuwo - Odofin LGA | Office of Infrastructure | i. Breathlife Nigeria Ltd. | 236,583,500.42 | 01/02/2008 | 3 Months | 40% |
| 14 | Rehabilitation of Comfort Oboh Street, Kirikiri, Amuwo - Odofin LGA | Office of Infrastructure | ii. Strabic Company Ltd. | 65,245,068.00 | 01/02/2008 | 3 Months | 40% |
| 15 | Rehabilitation of Comfort Oboh Street, Kirikiri, Amuwo - Odofin LGA | Office of Infrastructure | iii. Lekton Nigeria Ltd. | 38,652,216.75 | 01/02/2008 | 3 Months | 40% |
| 16 | Construction of Ajiweh/Okun - Ajah/ Ogbombo Road in Eti - Osa LGA (Variation) | Office of Infrastructure | Aresco Limited | 287,803,088.86 | 01/02/2008 | 5 Months | N150M |
| 17 | Construction of Ajangbadi - Ilogbo Rd. Ojo | Office of Infrastructure | SEG MAHSEN | 855,802,642.86 | 01/02/2008 | 4 Months | 40% |
| 18 | Rehabilitation of Shodipo Str. Papa Ashafa. Agege | Office of Infrastructure | SIKTOBS NIGERIA | 143,692,931.81 | 01/02/2008 | 4 Months | 40% |
| 19 | Construction of Alasia Street. Ijanikin. Ojo. | Office of Infrastructure | PERRL Limited | 131,271,498.24 | 01/02/2008 | 4 Months | 40% |
| 20 | Construction of Fagbayi Network, Alimosho | Office of Infrastructure | FIRST AUGUST | 206,080,820.00 | 01/02/2008 | 4 Months | 40% |
| 21 | Rehabilitation of Balogun Str Phase I, Agege | Office of Infrastructure | MORIN INVESTMENT | 77,072,050.00 | 01/02/2008 | 4 Months | 40% |
| 22 | Rehabilitaion of Samuel Ekundayo Str. Badagry | Office of Infrastructure | R.C.F NIGERIA LIMITED | 135,738,065.35 | 01/02/2008 | 4 Months | 40% |
| 23 | Construction of Ajoke Sodamola Str. Fagba. Iju. | Office of Infrastructure | VIKKY ENT | 102,158,472.90 | 01/02/2008 | 4 Months | 40% |
| 24 | Rehabilitation of Odo Olowu Str. Ijesatedo | Office of Infrastructure | FASTAPPROACH KONSTRUCTION LTD | 151,876,575.13 | 01/02/2008 | 4 Months | 40% |
| 25 | Construction of Oremeji/Irepodun Str. Oko Oba. | Office of Infrastructure | DAD KONCEPT | 153,540,214.00 | 01/02/2008 | 4 Months | 40% |
| 26 | Construction of Rotimi Odusanya Str.Ikorodu | Office of Infrastructure | Keen-Bayo Ventures Ltd | 150,129,474.00 | 01/02/2008 | 4 Months | 40% |
| 27 | Construction of Mancity Olaniyi Rd. Ifako Ijaiye | Office of Infrastructure | Gabakar Nig. Ltd. | 322,280,690.00 | 01/02/2008 | 4 Months | 40% |
| 28 | Construction of Ijede - Egbin Road. Ikorodu | Office of Infrastructure | Wetland | 160,320,930.00 | 01/02/2008 | 4 Months | 40% |
| 29 | Rehabilitation of Satelite Rd. [ABC] Amuwo Odofin | Office of Infrastructure | Femogs & Sons Ltd. | 72,789,255.00 | 01/02/2008 | 4 Months | 40% |
| 30 | Rehabilitaion of Ondo Street (Rd Network. Ajegunle. Kosofe.) | Office of Infrastructure | Deux Projects Ltd. | 195,852,053.58 | 01/02/2008 | 4 Months | 40% |
| 31 | Construction of Adebayo Solanke Str. Ikeja. | Office of Infrastructure | Laralek Ultimate Nig. Ltd. | 65,894,249.40 | 01/02/2008 | 4 Months | 40% |
| 32 | Construction of Old Ota Ibari, Alagbado. | Office of Infrastructure | Deux Projects Ltd. | 866,430,290.00 | 01/02/2008 | 4 Months | 40% |
| 33 | Construction of Ropo Owolabi. Str. Ikeja. | Office of Infrastructure | Oshique Ventures | 602,684,712.00 | 01/02/2008 | 4 Months | 40% |
| 34 | Construction of Beckley Estate. Ifako Ijaiye | Office of Infrastructure | Barath | 148,974,987.50 | 01/02/2008 | 4 Months | 40% |
| 35 | Construction of Rd Network in Epe | Office of Infrastructure | R.C.F NIGERIA LIMITED | 289,843,785.00 | 01/02/2008 | 4 Months | 40% |
| 36 | Rehabilitation of Irefun,Kufisile Str. Alimosho | Office of Infrastructure | Gold Plan Limited | 122,424,163.32 | 01/02/2008 | 4 Months | 40% |
| 37 | Construction of Zawiyat Crescent, Ifako. | Office of Infrastructure | Bee & Gee Ventures | 98,553,759.50 | 01/02/2008 | 4 Months | 40% |
| 38 | Rehabilitation of 2 Nos. Burnt Courtrooms at Igbosere | Office of Works | Catrillion Investment Limited | 24,499,579.92 | 01/02/2008 | 18 Weeks | 40% |
| 39 | Procurement of New Waste Collector Trucks | Lagos State Waste Management Authority | Deux Projects | 2,425,000,000.00 | 02/02/2008 | 3 Months | 50% |
| 40 | Containerization of Municipal Solid Waste. | Lagos State Waste Management Authority | Kojol Engineering and Services | 381,106,014.00 | 02/02/2008 | 3 Months | 50% |
| 41 | Completion of 8 in 1 3-Bedroom Flat at Ojokoro Housing Estate- One Block(No. MM4.) | Ministry of Housing | Piko Enterprises | 27,289,014.87 | 02/02/2008 | 6 Months | 50% |
| 42 | Completion of 8 in 1 3-Bedroom Flats at Ojokoro Housing Estate-19 Blocks (Nos. MM1, MM2, MM3, MM5, MM6, MM7, MM8, MM9, MM10, MM15, MM17, MM18, MM31, MM32, MM33, MM34, MM35, MM36, & MM38) | Ministry of Housing | Kajo - Summit Construction Company Ltd. | 29,160,561.75 | 02/02/2008 | 6 Months | 50% |
| 43 | Construction of Oko - Oba Canal (Oladoje - Old Ota Road), Orile Agege, Agege LGA | Office of Drainage Services | Brotco Tech. Services Nig. Ltd. | 63,495,738.23 | 02/02/2008 | 8 Weeks | 50% |
| 44 | Cleaning of Sheetpile and Construction of MacGregor Trapezoidal Canal Ikoyi, Eti - Osa LGA | Office of Drainage Services | Mafinco Nigeria Limited | 206,579,718.90 | 02/02/2008 | 20 Weeks | 50% |
| 45 | Construction of Gbagada / Atunrase Trapezoidal Channel, Gbagada, Kosofe LGA | Office of Drainage Services | Edward Property Consult | 119,094,476.12 | 02/02/2008 | 28 Weeks | 50% |
| 46 | Construction of Ososa/ Ifelodun/ Arobadade Collector Drain, Shomolu LGA | Office of Drainage Services | ENG - BAN Nigeria Ltd. | 64,638,385.99 | 02/02/2008 | 12 Weeks | 50% |
| 47 | Dredging of Bale/ Okoya Channel, Ajeromi/Ifelodun LGA. | Office of Drainage Services | Efoba Construction & Engineering Services | 48,021,750.00 | 02/02/2008 | 10 Weeks | 50% |
| 48 | Landscaping and Beautification of Ijora Cause Way, Apapa LGA. | Office of Environmental Services | Tafskad Servicing Nig. Ltd. | 200,000,000.00 | 02/02/2008 | 6 Months | 50% |
| 49 | Landscaping and Beautification of Moboloji Bank Anthony Way. | Office of Environmental Services | Integral Landscaping | 380,000,000.00 | 02/02/2008 | 9 Months | 50% |
| 50 | Landscaping and Beautification of Isheri Oworonshoki Median via Toll Gate. | Office of Environmental Services | Arabella | 750,000,000.00 | 02/02/2008 | 6 Months | 50% |
| 51 | Landscaping and Beautification of the Triangular Lay Bye between Obanikoro and Palmgrove, Ikorodu Road. | Office of Environmental Services | Shodex Beautification and Landmark Ltd. | 110,000,000.00 | 02/02/2008 | 6 Months | 50% |
| 52 | Procurement of 20 Units of Mobile Intensive Care Unit(MICU) Ambulance-Upward Review from N29m to N35.6m for 10Units | Ministry of Health | Deux Projects Ltd | 359,960,000.00 | 11/02/2008 | 70% | |
| 53 | Provision of Pupils/Teachers Furniture in Public Primary Schools (Phases II and III) | SUBEB | Labif Ventures | 14,890,000.00 | 11/2/2008 | 8 Weeks | 70% |
| 54 | Provision of Pupils/Teachers Furniture in Public Primary Schools (Phases II and III) | SUBEB | Sobinton nig. Ltd. | 14,890,000.00 | 11/2/2008 | 8 Weeks | 70% |
| 55 | Provision of Pupils/Teachers Furniture in Public Primary Schools (Phases II and III) | SUBEB | MAK & Co. | 14,890,000.00 | 11/2/2008 | 8 Weeks | 70% |
| 56 | Provision of Pupils/Teachers Furniture in Public Primary Schools (Phases II and III) | SUBEB | Omins Links Int. Ltd. | 14,890,000.00 | 11/2/2008 | 8 Weeks | 70% |
| 57 | Provision of Pupils/Teachers Furniture in Public Primary Schools (Phases II and III) | SUBEB | Shebourne Ventures Ltd | 14,890,000.00 | 11/2/2008 | 8 Weeks | 70% |
| 58 | Provision of Pupils/Teachers Furniture in Public Primary Schools (Phases II and III) | SUBEB | Milestone Universal Reg. Ltd. | 14,890,000.00 | 11/2/2008 | 8 Weeks | 70% |
| 59 | Provision of Pupils/Teachers Furniture in Public Primary Schools (Phases II and III) | SUBEB | Faith Universal Ltd. | 14,890,000.00 | 11/2/2008 | 8 Weeks | 70% |
| 60 | Provision of Pupils/Teachers Furniture in Public Primary Schools (Phases II and III) | SUBEB | Bikafash Construction Company | 14,890,000.00 | 11/2/2008 | 8 Weeks | 70% |
| 61 | Provision of Pupils/Teachers Furniture in Public Primary Schools (Phases II and III) | SUBEB | Tun-Bio Chambers | 14,890,000.00 | 11/2/2008 | 8 Weeks | 70% |
| 62 | Provision of Pupils/Teachers Furniture in Public Primary Schools (Phases II and III) | SUBEB | Modern Home Makers Limited | 14,890,000.00 | 11/2/2008 | 8 Weeks | 70% |
| 63 | Geodetic ontrol, Signalisation and Acquisition of Aerial Photos (Module 1) | Surveyor General | Interspatial Technology | 510,692,500.00 | 11/02/2008 | 6 Months | 70% |
| 64 | Establishment of Geoids/Active GPS Station (Module 2) | Surveyor General | Lordsfield Limited | 70,000,000.00 | 11/02/2008 | 3 Months | 70% |
| 65 | Densification/DTM/Orthophoto Digital Mapping and Navigation System (Module 3) | Surveyor General | Interspatial Technology | 751,238,475.00 | 11/02/2008 | 18 Months | 70% |
| 66 | Database Creation/GIS Application and Enterprise GIS (Module 4) | Surveyor General | Interspatial Technology | 409,660,500.00 | 11/02/2008 | 15 Months | 70% |
| 67 | Bathymetry (Module 5) | Surveyor General | Unilag Consult Consortium | 187,836,000.00 | 11/02/2008 | 5 Months | 70% |
| 68 | Hard/Software Acquisition, Iformation Communication Technology, Training and Education(Module 6) | Surveyor General | AAC Consulting Ltd | 219,625,952.00 | 11/02/2008 | 12 Months | 70% |
| 69 | Lagos State GIS and Digital Mapping Project Management | Surveyor General | Jrapha Geometrics System Ltd. | 190,667,174.86 | 11/02/2008 | 24 Months | 30% |
| 70 | Restoration and Stabilsation of Lagos Bar Beach Shoreline (Phase II B) | Office of Infrastructure | Hitech Construction | 1,259,000,000.00 | 25/02/2008 | 8Months | 60% |
| 71 | Supply and Commissioning of Two (2) Mobile Medical and Two Mobile Dental Clinic | Ministry of Health | Deux Projects Ltd. | 152,950,000.00 | 25/2/2008 | 70% | |
| 72 | Rehabilitation of Existing Failed Culvert along Obafemi Awolowo Way, Ikorodu LGA | Office of Infrastructure | Seg Mahsen and Company (Nig.) Ltd. | 126,600,314.25 | 27/02/2008 | 3 Months | 50% |
| 73 | Provision of Additional Close Circuit Television Circuit Television and Gate Control at State House, Marina, Lagos | Office of Works | ASA Advance Technology | 21,400,000.00 | 27/02/2008 | 10 Weeks | 70% |
| 74 | Supply and Installation of UPS at Lagos House, Marina | Office of Works | Apice Power Support Solution | 97,692,456.47 | 27/02/2008 | 12 Weeks | 70% |
| 75 | Supply of Mobile Field Hospital | Ministry of Health | Deux Projects Ltd. | 325,000,000.00 | 03/3/2008 | 70% | |
| 76 | Rural Electrification scheme, Okegun-Odofin Community, Epe Local Government Area | Ministry of Rural Development | Iyasuna Power Engineers and Company | 52,988,898.00 | 03/3/2008 | 12 Weeks | 60% |
| 77 | Rural Electrification scheme, Idafa Community, Ikorodu Local Government Area | Ministry of Rural Development | Biseta Nigeria Ltd. | 15,000,000.00 | 03/3/2008 | 12 Weeks | 60% |
| 78 | Construction of Micro-Water Scheme, Apa, Badagry West Local Council Development Area | Ministry of Rural Development | Conswealth Multi-Services Ventures | 40,000,000.00 | 03/3/2008 | 12 Weeks | 60% |
| 79 | Construction of Micro-Water Scheme, New Era Foundation , Ibeju-Lekki Local Government Area | Ministry of Rural Development | Mikron Services Nig. Ltd. | 40,000,000.00 | 03/3/2008 | 12 Weeks | 60% |
| 80 | Construction of Micro-Water Scheme, Liadi Village, Ikorodu Local Government Area | Ministry of Rural Development | HGP Limited | 35,000,000.00 | 03/3/2008 | 12 Weeks | 60% |
| 81 | Construction of Micro-Water Scheme, Isawo, Ikorodu North Local Council Development Area | Ministry of Rural Development | Siriman Ventures Nig. Ltd | 45,000,000.00 | 03/3/2008 | 12 Weeks | 60% |
| 82 | Rehabilitation of Micro-Water Works, Ado, Langbasa, Eti-Osa Local Government | Ministry of Rural Development | Mokaniye Builders Nig. Ltd | 80,000,000.00 | 03/3/2008 | 12 Weeks | 60% |
| 83 | Upgrading of Dispensary Building to the level of Mini health Clinic , Ewu-Elepe Community, Ikorodu | Ministry of Rural Development | Home Talk Limited | 16,686,542.00 | 03/3/2008 | 12 Weeks | 60% |
| 84 | Upgrading of Dispensary Building to the level of Mini health Clinic , Imota Community, Ikorodu | Ministry of Rural Development | Toyaf Ventures | 16,686,542.00 | 03/3/2008 | 12 Weeks | 60% |
| 85 | Upgrading of Dispensary Building to the level of Mini health Clinic , Imota Community, Ikorodu | Ministry of Rural Development | Muk-Dap Nig. Ltd. | 18,180,962.00 | 03/3/2008 | 12 Weeks | 60% |
| 86 | Upgrading of Dispensary Building to the level of Mini health Clinic ,Ebuwawa, Ikorodu Local Government | Ministry of Rural Development | Fatty Glorious Nig. Ltd | 16,686,542.00 | 03/3/2008 | 12 Weeks | 60% |
| 87 | Upgrading of Dispensary Building to the level of Mini health Clinic ,Otunla Community, Ibeju Lekki Local Government | Ministry of Rural Development | Saydolly Ventures | 16,686,542.00 | 03/3/2008 | 12 Weeks | 60% |
| 88 | Upgrading of Dispensary Building to the level of Mini health Clinic ,Isefun Community, Alimosho Local Government | Ministry of Rural Development | Fayomi Simbo Flolasade Enterprises | 16,686,542.00 | 03/3/2008 | 12 Weeks | 60% |
| 89 | Upgrading of Dispensary Building to the level of Mini health Clinic ,Apata Community, Alimosho Local Government | Ministry of Rural Development | Nilly Willy International | 16,686,542.00 | 03/3/2008 | 12 Weeks | 60% |
| 90 | Upgrading of Dispensary Building to the level of Mini health Clinic ,Petepete Community, Badagry Local Government | Ministry of Rural Development | Adbaaf Nigeria Limited | 18,180,962.00 | 03/3/2008 | 12 Weeks | 60% |
| 91 | Upgrading of Dispensary Building to the level of Mini health Clinic ,Igbosu , Amuwo Odofin Local Government | Ministry of Rural Development | S.Amusa Enterprises Ltd. | 18,180,962.00 | 03/3/2008 | 12 Weeks | 60% |
| 92 | Rehabilitation of Hall at Noforija, Epe Local Government | Ministry of Rural Development | Costeng Nig. Ltd. | 21,030,000.00 | 03/3/2008 | 12 Weeks | 60% |
| 93 | Dualisation of Mobil-Boundary Road in Ajeromi Ifelodun Local Govt Area (Phase I) | Office of Infrastructure | Lopek Engineering & Construction Ltd. | 312,945,338.50 | 03/03/2008 | 50% | |
| 94 | Construction of Olumokun/Olayinka/Sanusi/Oduduwa Streets in Ajeromi Ifelodun Local Govt Area (Phase I) | Office of Infrastructure | Consteng Nigeia Ltd. | 824,194,451.90 | 03/03/2008 | 50% | |
| 95 | Construction of Wilmer Crescent / Akpiri Streets in Ajeromi Ifelodun Local Govt Area (Phase I) | Office of Infrastructure | Brecco Nigeria Ltd. | 836,037,232.90 | 03/03/2008 | 50% | |
| 96 | Construction of Judicial Service Commission Complex (Phase 1) | Judicial Commission | Barrows Construction Ltd. | 180,000,000.00 | 05/3/2008 | 6 Months | 60% |
| 97 | Installation of (Hi-Tech) Traffic Lights at Thirty (30) Locations within the Metropolis | Ministry of Transportation | Jpatel & Sons Ltd. | 622,500,000.00 | 05/3/2008 | 6 Months | 40% |
| 98 | Procurement of Mobile Baler Logger Car Crusher | Ministry of Transportation | Capital Consortium Ltd. | 134,055,000.00 | 05/3/2008 | 3 Months | 70% |
| 99 | Purchase of 10 Nos. 10,000 Litres Fire Water Tankers | Ministry of Home Affairs & Culture | Nig. Motors Industries Ltd. | 210,000,000.00 | 05/3/2008 | 4 Weeks | 70% |
| 100 | Completion of 12 in 1 2 Bedroom Flats Block Nos. L and Q in Ojokoro Housing Estate | Ministry of Housing | Salimariam International Ltd. | 16,423,127.25 | 05/3/2008 | 2 Months | 60% |
| 101 | Completion of 12 in 1 1Bedroom Flat for Block No. C1, D1, & F1 and Completion of 12 in 1 2Bedroom Flat for Block No. A,B,E,G,H,K,M,P,U,R,S,T and V in Ojokoro Housing Estate | Ministry of Housing | Piko Enterprises | 18,781,693.02 | 05/3/2008 | 2 Months | 60% |
| 102 | Replacement of the Court Room Woodworks and Furniture at Igbosere High Court (Variation). | Ministry of Justice | Numbers Nigeria Limited | 15,783,966.90 | 05/3/2008 | ||
| 103 | Procurement of 60 (sixty) Stenographic Court Recording Equipment and Establishment of the School of Stenography in Lagos State | Ministry of Justice | Equality Foundation | 238,364,040.60 | 05/3/2008 | 12 Months | 60% |
| 104 | Construction of Additional Home for the Aged in the Old People's Home, Yaba | Ministry of Youth, Sports & Social Development | Mafinco Nig. Ltd. | 55,000,000.00 | 05/3/2008 | 4 Weeks | 50% |
| 105 | Construction of Youth Centre at Popo - Oba, Epe | Ministry of Youth, Sports & Social Development | Aleyun Ventures Ltd. | 34,000,000.00 | 05/3/2008 | 4 Weeks | 50% |
| 106 | Expansion of Communication System for Lagos State Traffic Management Authority, Purchase of Repeater,Walkie Talkies | Ministry Transportation | Sifade Nig. Ltd. | 120,000,000.00 | 05/3/2008 | 3 Months | 60% |
| 107 | Construction of Ikosi Road in Iba Town | Office of Infrastructure | Rodabas Ltd. | 53,399,579.89 | 05/3/2008 | 8 Weeks | 40% |
| 108 | Construction of Fola Osibo Emmanuel Gole Road/ Hakem Dickson Street. | Office of Infrastructure | Aresco Limited | 418,333,407.25 | 05/3/2008 | 6 Months | 50% |
| 109 | Dredging of Oke-Afa-Mile 2, Badore-Osborne and Ikorodu-Osborne Navigational Corridors | Ministry of Transportation | Harris Dredging Ltd. | 3,004,650,000.00 | 10/3/2008 | 9 Months | 50% |
| 110 | Dredging of Porto Novo Estuary-Liverpool Bridge Navigational Corridors | Ministry of Transportation | FBM Marine Ltd | 241,000,000.00 | 10/3/2008 | 8 Months | 50% |
| 111 | Dredging of Tolu AjegunlePorto Novo Estuary(Tin-can Waterfront) Navigational Corridors | Ministry of Transportation | Rass International Limited | 241,000,000.00 | 10/3/2008 | 8 Months | 50% |
| 112 | Dredging of Mile 2-Marina Navigational Corridors | Ministry of Transportation | Numbers Nigeria Limited | 148,500,000.00 | 10/3/2008 | 4 Months | 50% |
| 113 | Rehabilitation of Funsho Williams Avenue Phase I (Commencing from Costain Roundabout to National Stadium) Surulere Local Government Area | Office of Infrastructure | Julius Berger Nigeria Plc. | 3,524,296,625.37 | 10/3/2008 | 12 Months | 40% |
| 114 | Construction of Jetties with Terminal Buildings at Osborne,Ikoyi | Office of Infrastructure | Hitech Construction Company Limited | 1,631,469,569.00 | 10/3/2008 | 9 Months | 40% |
| 115 | Supply, Installation and Commissioning of Hospital Equipment and Furniture for five (5) Maternal Health Centres in Ikorodu, Isolo, Ifako-Ijaiye, Ajeromi General Hospitals and Gbaja, Surulere | Ministry of Health | Deux Project Limited | 2,249,733,592.34 | 11/3/2008 | 70% | |
| 116 | Construction of Wall Fence at Ijeododo Grammar School. | Education | Habeeb Thoheeb Comm. | 10,560,000.00 | 12/03/2008 | Six Weeks | 70% |
| 117 | Construction of Education Resource Centre at Ojodu | Education | Tafeco Nigeria Ltd | 32,692,905.00 | 12/03/2008 | 12 Weeks | 50% |
| 118 | Procurement of 2Nos. Hiab (1 No.5 Tons & 1 No.10 Tons) | Ministry of Transportation | Tall Ways Ventures Limited | 62,522,694.70 | 12/03/2008 | 6 Months | 50% |
| 119 | Procurement of Operational Vehicles for Vehicle Inspection Unit | Ministry of Transportation | Metropolitan Motors Limited | 46,200,000.00 | 12/03/2008 | 70% | |
| 120 | Construction of Youth Centres and Provision of Recreational, Sporting and Vocational Equipments (Phases I & II) | Ministry of Youth, Sports and Social Development | i.Clafem Ventures Ltd | 25,659,826.63 | 12/3/2008 | 20 Weeks | 70% |
| 121 | Construction of Youth Centres and Provision of Recreational, Sporting and Vocational Equipments (Phases I & II) | Ministry of Youth, Sports and Social Development | ii.Al Rahman Optimum Nig.Ltd | 29,787,741.69 | 12/3/2008 | 20 Weeks | 70% |
| 122 | Construction of Youth Centres and Provision of Recreational, Sporting and Vocational Equipments (Phases I & II) | Ministry of Youth, Sports and Social Development | iii.Buena Fortuna Nig. Ltd | 25,659,826.63 | 12/3/2008 | 20 Weeks | 70% |
| 123 | Construction of Youth Centres and Provision of Recreational, Sporting and Vocational Equipments (Phases I & II) | Ministry of Youth, Sports and Social Development | iv.Nexca Project Ltd | 29,787,741.69 | 12/3/2008 | 20 Weeks | 70% |
| 124 | Construction of Youth Centres and Provision of Recreational, Sporting and Vocational Equipments (Phases I & II) | Ministry of Youth, Sports and Social Development | v.Multi trusts Ltd. | 25,659,826.63 | 12/3/2008 | 20 Weeks | 70% |
| 125 | Construction of Youth Centres and Provision of Recreational, Sporting and Vocational Equipments (Phases I & II) | Ministry of Youth, Sports and Social Development | vi.Fat-Anny Nig.Ltd | 29,787,741.69 | 12/3/2008 | 20 Weeks | 70% |
| 126 | Construction of Strategic Road in Alimosho Local Govt.Area.(Phase II) | Office of Infrastructure | Hitech Construction Company Ltd | 6,205,930,700.35 | 12/03/2008 | 15 Months | 50% |
| 127 | Construction of the Office of the Public Defender/Mediation Centre at Iyun Street, Surulere. | Ministry of Justice/Office of Works | Messrs Moreno PLC | 215,841,467.10 | 12/03/2008 | 30 Weeks | 50% |
| 128 | Rehabilitation of City Hall - Variation Works | Office of Works | Arab Contractors O.A.O. Nig. Ltd. | 2,982,449,711.18 | 12/03/2008 | 1 Year | 50% |
| 129 | LIST OF ABANDONED SCHOOLS 1No 17 + 1Classroom Block at Girls High School, Agege | SCRPS | Sog Ventures | 43,796,137.14 | 12/3/2008 | 20 Weeks | 50% |
| 130 | 1No 17 + 1Classroom Block at Oreyo Senior Grammar School, Igbogbo | SCRPS | Home Ideas Limited | 43,047,846.18 | 12/3/2008 | 20 Weeks | 50% |
| 131 | 1No 17 + 1 Classroom Block at Ilupeju Grammar School, Ilupeju | SCRPS | Amokeoja Nigeria Enterprises | 73,176,517.06 | 12/3/2008 | 20 Weeks | 50% |
| 132 | 1No 17 + 1 Classroom Block at Community Junior / Senior Grammar School, Surulere | SCRPS | Fabolams | 67,676,517.06 | 12/3/2008 | 20 Weeks | 50% |
| 133 | 1No 17 + 1 Classroom Block at Oregun Junior High School, Oregun | SCRPS | De-fas Enterprises Limited | 73,176,517.06 | 12/3/2008 | 20 Weeks | 50% |
| 134 | LIST OF SCHOOLS FOR REHABILITATION 1No 17 + 1 Classroom Block at Ijesha-Tedo Boys High School, Sanya Bus-Stop, Aguda | SCRPS | Gabakar Nigeria Limited | 24,586,261.90 | 12/3/2008 | 16 Weeks | 50% |
| 135 | 1No 17 + 1 Classroom Block at Iganmu Senior High School, Orile, Iganmu | SCRPS | Big-Daddy Nigeria Limited | 24,586,261.90 | 12/3/2008 | 16 Weeks | 50% |
| 136 | 1No 17 + 1 Classroom Block at Iganmu Junior High School, Orile, Iganmu | SCRPS | Delly George Ventures | 24,586,261.90 | 12/3/2008 | 16 Weeks | 50% |
| 137 | Conversion of 1No 6 Classroom Block + Toilet at Opebi Primary School, Allen Avenue | SCRPS | Teenteen Nigeria Limited | 12,834,002.68 | 12/3/2008 | 16 Weeks | 50% |
| 138 | Conversion of 6 Classroom Block at Ilupeju Grammar School, Ilupeju | SCRPS | Macmade Nigeria Limited | 12,554,252.00 | 12/3/2008 | 16 Weeks | 50% |
| 139 | 1No 17 + 1 Classroom Block at Ogba Junior Grammar School, Ogba | SCRPS | Andy Phillips Ventures Limited | 21,370,351.80 | 12/3/2008 | 16 Weeks | 50% |
| 140 | 1 No 17 + 1 Classroom Block Agbowa-Ikosi Community High School, Agbowa-Ikosi | SCRPS | Momtek Project Limited | 16,724,032.60 | 12/3/2008 | 16 Weeks | 50% |
| 141 | 1No 17 + 1 Classroom Block at Stadium High School, Barracks, Surulere | SCRPS | Adbaaf Nigeria Limited | 13,952,845.98 | 12/3/2008 | 16 Weeks | 50% |
| 142 | 1No 17 + 1 Classroom Block at Ajumoni Senior Secondary School, Okota | SCRPS | BNR Resources Limited | 20,129,210.52 | 12/3/2008 | 16 Weeks | 50% |
| 143 | 1 No 17+1 Classroom Block at Community Senior Grammar School, Surulere | SCRPS | Fair Deal Nigeria Limited | 12,514,184.51 | 12/3/2008 | 16 Weeks | 50% |
| 144 | 1No 17 + 1 Classroom Block at Shamusi - Deen Secondary School, Sabo, Ikorodu | SCRPS | Bolly Kamia Ventures Ltd | 17,960,800.00 | 12/3/2008 | 16 Weeks | 50% |
| 145 | 1No 17 + 1 Classroom Block at Ijesha-Tedo Grammar School, Ijesha-Tedo | SCRPS | OMTS Limited | 13,712,434.80 | 12/3/2008 | 16 Weeks | 50% |
| 146 | 1No 17 + 1 Classroom Block at Methodist Junior High School, Badagry | SCRPS | Arkisortium Limited | 28,015,697.45 | 12/3/2008 | 16 Weeks | 50% |
| 147 | 1No 17 + 1 Classroom Block at Methodist Senior High School, Badagry | SCRPS | Mesot Ventures | 24,053,254.75 | 12/3/2008 | 16 Weeks | 50% |
| 148 | 1No 17 + 1 Classroom Block at Methodist Senior High School, Badagry | SCRPS | Larlad (Nig) Enterprises | 24,053,254.75 | 12/3/2008 | 16 Weeks | 50% |
| 149 | 1No 17 + 1 Classroom Block at Oke-Odo High School, Alimosho | SCRPS | Biorem Nigeria Limited | 39,826,148.34 | 12/3/2008 | 16 Weeks | 50% |
| 150 | 1No 12 Classroom Block at Oriwu Model College, Igbobo | SCRPS | Authentic Contractors | 21,464,674.37 | 12/3/2008 | 14 Weeks | 50% |
| 151 | 1No 18 Classroom / Admin Block at Oriwu Model College, Igbobo | SCRPS | Nik-Folay Enterprises | 24,520,695.21 | 12/3/2008 | 16 Weeks | 50% |
| 152 | 1No 12 Classroom Block at Ikosi Senior High School, Ikosi, Ketu | SCRPS | F. Ola Oyewuwo & Sons | 13,072,809.60 | 12/3/2008 | 14 Weeks | 50% |
| 153 | 1No 36 Classroom Block at Community Junior / Senior High School, Tafawa Balewa Crescent, Surulere | SCRPS | Zanet Limited | 60,287,134.85 | 12/3/2008 | 20 Weeks | 50% |
| 154 | 1No Block of 14 Classrooms at Lagos State Model College, Kankan-Badagry | SCRPS | Joy Collins Eng. Limited | 10,750,800.00 | 12/3/2008 | 16 Weeks | 50% |
| 155 | CONSTRUCTION OF NEW CLASSROOM BUILDINGS 1No 17+1 Classroom Block at Surulere Community Junior Secondary School, Alagbado | SCRPS | Winning Quest Integrated Service Limited | 70,946,992.83 | 12/3/2008 | 24 Weeks | 50% |
| 156 | 1No 12 Classroom at Eletu Odigbo High School, Abule Oja | SCRPS | L. A. Lawal & Sons | 52,577,159.33 | 12/3/2008 | 18 Weeks | 50% |
| 157 | 1No 12 Classroom Block at Obele Junior High School, Surulere | SCRPS | Nimco Limited | 52,577,159.33 | 12/3/2008 | 18 Weeks | 50% |
| 158 | 1No 17+1 Classroom Block at Mafoluku Grammar School, Mafoluku, Oshodi | SCRPS | XC Wisdom Gate Limited | 70,946,992.83 | 12/3/2008 | 18 Weeks | 50% |
| 159 | 1No 17+1 Classroom Block at Oke-ira Grammar School, Oke-ira | SCRPS | Tsac Limited | 70,946,992.83 | 12/3/2008 | 24 Weeks | 50% |
| 160 | 1No 12 Classroom Block at Okemagba High School, Mojoda, Epe | SCRPS | De-Solidrest Works | 48,051,851.23 | 12/3/2008 | 18 Weeks | 50% |
| 161 | 1No 17+1 Classroom Block at Keme Balogun Junior College, Ibeshe | SCRPS | Tannaj Limited | 75,993,283.85 | 12/3/2008 | 24 Weeks | 50% |
| 162 | 1No 6 Classroom Block at R. C. M. Primary School, Orugbo, Epe | SCRPS | First Broad International Limited | 31,670,301.47 | 12/3/2008 | 12 Weeks | 50% |
| 163 | 1No 12 Classroom Block at Amuwo Senior Grammar School, Agboju-Amuwo | SCRPS | Dad Koncept | 52,577,159.33 | 12/3/2008 | 18 Weeks | 50% |
| 164 | 1No 12 Classroom Block at Kadara Junior High School, Ebute-Metta | SCRPS | Symbolic Engineering Ltd | 52,577,159.33 | 12/3/2008 | 18 Weeks | 50% |
| 165 | 1No 12 Classroom Block at Aiyedere Ajibola Secondary School, Ketu | SCRPS | Delfay & Sons | 52,577,159.33 | 12/3/2008 | 18 Weeks | 50% |
| 166 | 1No 12 Classroom Block at Majidun Junior Grammar School, Majidun, Ikorodu | SCRPS | Caybee Industrial Limited | 52,577,159.33 | 12/3/2008 | 18 Weeks | 50% |
| 167 | 1No 17+1 Classroom Block at Olorunfumi Junior Grammar School, Idimu, Alimosho | SCRPS | Siggy Nigeria Limited | 65,446,992.83 | 12/3/2008 | 24 Weeks | 50% |
| 168 | 1No 17+1 Classroom Block Olorunfumi Senior Grammar School, Idimu, Alimosho | SCRPS | David Soga (Nig) Enterprises | 68,848,191.83 | 12/3/2008 | 24 Weeks | 50% |
| 169 | Fencing and Drainage at Olorunfumi Senior Grammar School, Idimu, Alimosho | SCRPS | Transrapid Nigeria Limited | 11,222,777.86 | 12/3/2008 | 10 Weeks | 50% |
| 170 | Fencing and Drainage at Olorunfumi Senior Grammar School, Idimu, Alimosho | SCRPS | Catrilion Limited | 11,222,777.86 | 12/3/2008 | 10 Weeks | 50% |
| 171 | 1No 17+1 Classroom Block at Army Children Junior High School, Ikeja | SCRPS | Sageto Limited | 120,689,583.00 | 12/3/2008 | 24 Weeks | 50% |
| 172 | 1No 17+1 Classroom Block at Army Children Senior High School, Ikeja | SCRPS | Sageto Limited | 120,689,583.00 | 12/3/2008 | 24 Weeks | 50% |
| 173 | Fencing at Army Children Junior High School, Ikeja | SCRPS | Tripple Tee Investment | 20,917,856.00 | 12/3/2008 | 12 Weeks | 50% |
| 174 | Fencing at Army Children Junior High School, Ikeja | SCRPS | Print-Bright Company | 20,917,856.89 | 12/3/2008 | 12 Weeks | 50% |
| 175 | 1No 12 Classroom Block at Mobolaji Bank-Anthony School, Sabo | SCRPS | Arem Global Ventures | 47,059,359.33 | 12/3/2008 | 18 Weeks | 50% |
| 176 | 1No 12 Classroom Block at Mobolaji Bank-Anthony School, Sabo | SCRPS | Brickfoam Nigeria Limited | 50,498,159.33 | 12/3/2008 | 18 Weeks | 50% |
| 177 | 1No 17+1 Classroom Block at Dr. Lucas Junior/Senior Secondary School | SCRPS | Bashcaul Civil Engineering | 75,993,283.85 | 12/3/2008 | 24 Weeks | 50% |
| 178 | Fencing at Dr. Lucas Junior/Senior Secondary School | SCRPS | Goldplan Investment Nigeria Limited | 33,180,000.00 | 12/3/2008 | 12 Weeks | 50% |
| 179 | 1No 17+1 Classroom Block at Angus Memorial Senior High School, Igbobi, Yaba | SCRPS | 7Series Ideas Concepts | 70,946,992.83 | 12/3/2008 | 24 Weeks | 50% |
| 180 | 1No 12 Classroom Block at Owutu/Isaowo Community Junior High School, Owutu/Isaowo Road, Ikorodu | SCRPS | Doublewell Ventures | 52,577,159.33 | 12/3/2008 | 18 Weeks | 50% |
| 181 | 1No. 6 Classroom Block at Osolu Senior Grammar School, Osolu | SCRPS | Tafeco International Limited | 34,412,250.62 | 12/3/2008 | 12 Weeks | 50% |
| 182 | 1No. 12 Classroom Block at Agboju Junior Secondary School, Ojo | SCRPS | Sholfad Enterprises | 52,577,159.33 | 12/3/2008 | 18 Weeks | 50% |
| 183 | 1No. 17+1 Classroom Block at Onike Girls Junior High School, Yaba | SCRPS | Debain Ventures Nig. Limited | 75,993,283.85 | 12/3/2008 | 24 Weeks | 50% |
| 184 | 1No. 17+1 Classroom Block + Fence and Drainage at Ijero Girls High School, Ijero, Ebute-Metta | SCRPS | Amec Consult Limited | 84,033,283.85 | 12/3/2008 | 24 Weeks | 50% |
| 185 | 1No. 17+1 Classroom Block at Igando Junior High School, Igando | SCRPS | Nordstar Engineering Ltd | 70,946,992.83 | 12/3/2008 | 24 Weeks | 50% |
| 186 | 1No. 17+1 Classroom Block at Isolo Senior High School, Isolo | SCRPS | Jalamor Concepts | 70,946,992.83 | 12/3/2008 | 24 Weeks | 50% |
| 187 | 1No. 6 Classroom Block at Opebi Primary School, Allen Avenue, Ikeja | SCRPS | Detty & Sons | 27,619,703.86 | 12/3/2008 | 14 Weeks | 50% |
| 188 | 1No. 17+1 Classroom Block at Ojodu Junior Grammar School, Ikeja | SCRPS | Timfat Ventures | 68,848,192.83 | 12/3/2008 | 24 Weeks | 50% |
| 189 | 1No. 17+1 Classroom Block at Ojodu Junior Grammar School, Ikeja | SCRPS | Goldcard Properties | 68,046,992.83 | 12/3/2008 | 24 Weeks | 50% |
| 190 | 1No. 17+1 Classroom Block at Tomia Community Secondary School, Alagbado | SCRPS | Plycon Limited | 70,946,992.83 | 12/3/2008 | 24 Weeks | 50% |
| 191 | 1No. 17+1 Classroom Block at Baptist Primary School, Apapa | SCRPS | Cp-Tech Construction Co. Ltd | 75,993,283.85 | 12/3/2008 | 24 Weeks | 50% |
| 192 | 1No. 17+1 Classroom Block at Iloro Junior Grammar School, Agege | SCRPS | Multiplan Concepts Ltd | 65,446,992.83 | 12/3/2008 | 24 Weeks | 50% |
| 193 | 1No 12 Classroom Block at Lafiagi Senior High School, Lagos-Island | SCRPS | Hadruc Limited | 52,577,159.33 | 12/3/2008 | 18 Weeks | 50% |
| 194 | 1No. 17+1 Classroom Block at Oko-Oba / Ladoje Nursery and Primary School, Agege | SCRPS | Heabond Nigeria Limited | 68,848,192.83 | 12/3/2008 | 24 Weeks | 50% |
| 195 | 1No. 17+1 Classroom Block at Oko-Oba / Ladoje Nursery and Primary School, Agege | SCRPS | Leedayk International Nigeria Limited | 65,446,992.83 | 12/3/2008 | 24 Weeks | 50% |
| 196 | 1No 17+1 Classroom Block at Cardoso Secondary School, Cardoso, Badiya | SCRPS | Gaywod Nigeria Limited | 75,993,283.85 | 12/3/2008 | 24 Weeks | 50% |
| 197 | 1No 12 Classroom Block at Oto-Awori Secondary School, Oto-Awori, Ojo | SCRPS | Premium Heights Limited | 52,577,159.33 | 12/3/2008 | 18 Weeks | 50% |
| 198 | 1No 17+1 Classroom Block at Ipaja Community Junior Secondary School, Ipaja | SCRPS | Abiodun Sunmola concrete Works | 70,946,992.83 | 12/3/2008 | 24 Weeks | 50% |
| 199 | 1No 12 Classroom Block at Sari Secondary School, Sari Iganmu | SCRPS | Eloin Multi Ventures | 52,577,159.33 | 12/3/2008 | 18 Weeks | 50% |
| 200 | Production and installation of longspan aluminium roofing sheets | SCRPS | Idrezat Nigeria Limited | 158,479,207.20 | 12/3/2008 | 18 Weeks | 70% |
| 201 | Metalworks | SCRPS | Akibix Wood & Metal Works | 291,928,893.20 | 12/3/2008 | 30 Weeks | 70% |
| 202 | Laboratory Furniture and Fittings | SCRPS | Irene-Davies Ventures | 250,558,977.50 | 12/3/2008 | 30 Weeks | 70% |
| 203 | PVC Plastic tongue and grooved ceiling | SCRPS | LLBS Limited | 127,465,682.00 | 12/3/2008 | 30 Weeks | 70% |
| 204 | Production and application of paints | SCRPS | Ad-Olmasol Ventures | 147,997,776.58 | 12/3/2008 | 30 Weeks | 70% |
| 205 | Procurement of Science Equipment for Senior Secondary School | SCRPS | Tunnex Laboratory | 487,200,000.00 | 12/3/2008 | ||
| 206 | Procurement of Intro-Tech / Integrated Science Equipment for Junior Secondary Schools | SCRPS | Tunnex Laboratory | 92,800,004.00 | 12/3/2008 | ||
| 207 | Production and Delivery of Wooden School Desks and Chairs | SCRPS | Fawehinmi Furniture Factory Ltd | 301,600,000.00 | 12/3/2008 | ||
| 208 | Production and Deliery of Teachers Furniture | SCRPS | Fawehinmi Furniture Factory Ltd | 56,700,000.00 | 12/3/2008 | ||
| 209 | Production and Delivery of Principal Furniture | SCRPS | Fawehinmi Furniture Factory Ltd | 11,700,000.00 | 12/3/2008 | ||
| 210 | Construction of New Magistrate Courts in Badagry and Ikeja. | Ministry of Justice/Office of Works | Messrs Sageto Ltd for Badagry and Ikeja Magistrate Courts | 693,963,594.24 | 12/03/2008 | 24 Weeks | 50% |
| 211 | Construction of New Magistrate Courts in Epe | Ministry of Justice/Office of Works | Messrs Moreno PLC for Epe Magistrate Court | 326,381,868.12 | 12/03/2008 | 24 Weeks | 50% |
| 212 | Construction of Collapsed Wall Fence at Community Secondary School, Bayeku, Ikorodu | Ministry of Education | Ade-Solade Enterprises | 32,600,000.00 | 26/3/2008 | 5 Weeks | 70% |
| 213 | Construction of Lagos Record and Archives Building at PSSDC Magodo-(Phase I) | Ministry of Information and Strategy | Bat-Richy Nig. Ltd. | 227,614,910.00 | 26/3/2008 | 48 Weeks | 50% |
| 214 | Construction of Service Roads Adjoining the Expansion of Lekki-Epe Expressway (a.Access Road-Mobil Section and b. Access Road-Lekki Phase I) | Office of Infrastructure | Hitech Construction Company Limited | 2,297,441,640.43 | 26/3/2008 | 6 Months | 40% |
| 215 | Construction of Ariyo-Ira-Muwo-Tedi-Abule Oshun Road with Bridge in Ojo Local Government Area(Phase I- Bridge Works) | Office of Infrastructure | Moreno-Marinas Lagoon Plc. | 2,500,000,000.00 | 26/3/2008 | 15 Months | 50% |
| 216 | Construction of Unity Road, Off Ajah-Badore in Eti-Osa Local Government Area | Office of Infrastructure | P.W. Nigeria Limited | 542,463,394.00 | 26/3/2008 | 16 Weeks | 50% |
| 217 | Construction of Alleyway Street, Victoria Island | Office of Infrastructure | Koya Construction Ltd. | 25,290,892.00 | 26/3/2008 | 2 Months | 40% |
| 218 | Clearing of Blocked Drains and Repair of damaged section of Agege Motor Road (Idi-Oro to Ilupeju Bye Pass) | Office of Infrastructure | Julius Berger PLC | 92,557,641.97 | 26/3/2008 | 8 Weeks | 50% |
| 219 | Construction of Ogunnaike, Oworonshoki. Somolu. | Office of Infrastructure | Julius Akinlabi Nig. Ltd | 65,280,864.00 | 26/3/2008 | 4 Months | 30% |
| 220 | Construction of Sule Abore Str. Ojodu. Ikeja. | Office of Infrastructure | Pee Dee Golden | 41,587,029.00 | 26/3/2008 | 4 Months | 30% |
| 221 | Construction of Debo Bashorun, Okota .Isolo. | Office of Infrastructure | Astromatic | 94,658,949.00 | 26/3/2008 | 4 Months | 30% |
| 222 | Construction of Oladun Ajisafe Rd. Alimosho | Office of Infrastructure | Seg Mahsen | 638,292,227.76 | 26/3/2008 | 4 Months | 30% |
| 223 | Rehabilitation of Modupe Ayoade St. Alimosho | Office of Infrastructure | S. Modinat | 88,529,542.76 | 26/3/2008 | 4 Months | 30% |
| 224 | Construction of Baale Str. Ojodu. Ikeja | Office of Infrastructure | Andre Ventures | 47,039,065.70 | 26/3/2008 | 4 Months | 30% |
| 225 | Construction of Lowa Str. Ikorodu | Office of Infrastructure | Cragsam | 62,423,210.30 | 26/3/2008 | 4 Months | 30% |
| 226 | Construction of Olasinbo Str.Oregun. Ikeja | Office of Infrastructure | A-Bramm Ltd | 49,119,961.00 | 26/3/2008 | 4 Months | 30% |
| 227 | Construction of Idado/ Lekki Rd. Eti Osa | Office of Infrastructure | Birak Ltd | 136,893,011.78 | 26/3/2008 | 4 Months | 30% |
| 228 | Construction of Humuani Adetona Street, Agege | Office of Infrastructure | Royal Trends international | 155,793,814.00 | 26/3/2008 | 4 Months | 30% |
| 229 | Provision of Maintenance and Facility Management Services at State House, Marina, Lagos | Office of Works | Julius Berger PLC | 87,858,413.68 | 26/3/2008 | 24 Months | 50% of N43,929,206.84 half yearly |
| 230 | Supply and Installation of three (3) Lifts in Blocks 2,3 and 5 in the Secretariat Complex, Alausa at N13,285,750.00each | Office of Works | Ron Arch Consult | 39,857,250.00 | 26/3/2008 | 6 Months | 50% |
| 231 | Reactivation of Street Lights :a. Awolowo Road ,Ikoyi | Office of Works/LASAA | Private Networks Nigeria Limited | 37,634,150.40 | 26/3/2008 | 6 Weeks | 70% |
| 232 | Reactivation of Street Lights b.Tejuosho-Itire Road and | Office of Works/LASAA | Private Networks Nigeria Limited | 55,534,188.00 | 26/3/2008 | 6 Weeks | 70% |
| 233 | Reactivation of Street Lights c. Agege Motor Road | Office of Works/LASAA | Private Networks Nigeria Limited | 100,462,350.42 | 26/3/2008 | 6 Weeks | 70% |
| 234 | Construction of Ado Kekere /Baale Road via Interlocking Blocks in Eti-Osa LGA | Ministry of Rural Development | Seyge Trading Investment Company | 75,275,515.25 | 7/04/2008 | 4 Months | 60% |
| 235 | Construction of Ladegboye Road via AsphalticConcrete Finish in LGA | Ministry of Rural Development | Benchmark Nig. Ltd. | 71,065,987.69 | 7/04/2008 | 6 Months | 60% |
| 236 | Construction of Link Road Between Isaac Ogunlolu and Oronna via Earth filling , construction of Transition slabs, discharge drains, slope protection and Asphaltic finish | Ministry of Rural Development | Alliedways Nig. Ltd. | 74,471,538.31 | 7/04/2008 | 6 Months | 60% |
| 237 | Construction of Secondary Drains on Akinola Road in Igando-Ikotun LCDA/Alimosho LGA | Ministry of Rural Development | Tunjobi Ent. Ltd. | 47,860,806.40 | 7/04/2008 | 6 Months | 60% |
| 238 | Construction of Kajola Lasisi close at Badore via the provision of drains & interlocking blocks finish in Eti-Osa LGA | Ministry of Rural Development | R.A. Harby Enterprises Ltd. | 20,743,448.00 | 7/04/2008 | 4 Months | 60% |
| 239 | Construction of Reinforced Concrete Jetty at Irewe in Ojo LGA | Ministry of Rural Development | Reprotraim | 34,715,000.00 | 7/04/2008 | 4 Months | 60% |
| 240 | Construction of Reinforced Concrete Jetty at Topo Island in Badagry LGA | Ministry of Rural Development | Biseta Nigeria Ltd. | 34,715,000.00 | 7/04/2008 | 4 Months | 60% |
| 241 | Construction of Reinforced Concrete Jetty (Off-Shore) at Tekunle in Epe LGA | Ministry of Rural Development | Paving Drains and Road Nig. Ltd. | 50,179,714.00 | 7/04/2008 | 4 Months | 60% |
| 242 | Construction of Reinforced Concrete Jetty (On-Shore) at Igbo-Ologun in Ibeju-Lekki LGA | Ministry of Rural Development | Searaq Nigeria Ltd. | 47,241,731.25 | 7/04/2008 | 4 Months | 60% |
| 243 | Construction of Reinforced Concrete Jetty (On-Shore) at Ibeshe in Ikorodu LGA | Ministry of Rural Development | L.Olly Joe Ltd. | 47,241,731.25 | 7/04/2008 | 4 Months | 60% |
| 244 | Construction of Reinforced Concrete Jetty (On-Shore) at Iworo-Ajido in Badagry LGA | Ministry of Rural Development | Nordstar Nig. Ltd. | 47,241,731.25 | 7/04/2008 | 4 Months | 60% |
| 245 | Procurement of Recycling Banks for the School Environmental Advocacy Programme | Office of Environmental Services | Kalaf Nigeria Limited | 170,000,000.00 | 10/04/2008 | 12 Weeks | 70% |
| 246 | Construction of Odogunyan/Odonla Link Road | Office of Infrastructure | Neesram Ventures Nigeria Limited | 640,000,000.00 | 10/04/2008 | 6 Months | 50% |
| 247 | Installation of Street Lights along Mobolaji Bank Anthony Way, Ikeja | Office of Works/LASAA | Lilleker Brothers (Nig.) Limited | 231,370,114.22 | 10/04/2008 | 4 Months | 60% |
| 248 | Installation of High Mast and Rehabilitation of street Lights along Eko Bridge- Marina Flyover | Office of Works/LASAA | Lilleker Brothers (Nig.) Limited | 876,041,112.56 | 10/04/2008 | 6 Months | 60% |
| 249 | Conversion of 1 No.6 Classrooms Block at Muslim Primary School, Araromi, Ajeromi/Ifelodun | SUBEB | Dalimo Nigeria Limited | 12,051,158.02 | 10/04/2008 | 8 Weeks | 70% |
| 250 | Conversion of 1 No. 6 Classrooms Block at Christ Assembly Primary School, Araromi, Ajeromi/Ifelodun | SUBEB | Eyiwuawi Nigeria Limited | 12,051,158.02 | 10/04/2008 | 8 Weeks | 70% |
| 251 | Conversion of 1 No. 6 Classrooms Block at Akowonjo Primary School, Akowonjo, Alimosho | SUBEB | Building Prefect Ventures | 12,051,158.02 | 10/04/2008 | 8 Weeks | 70% |
| 252 | Conversion of 1 No. 6 Classrooms Block at Ikotun Community Primary School, Ikotun, Alimosho | SUBEB | Epha Construction | 12,051,158.02 | 10/04/2008 | 8 Weeks | 70% |
| 253 | Conversion of 1 No. 6 Classrooms Block at Oluwole Primary School, Ilare, Amuwo Odofin | SUBEB | Inter-Bemek Nig. Com.Ltd. | 12,051,158.02 | 10/04/2008 | 8 Weeks | 70% |
| 254 | Conversion of 1 No. 6 Classrooms Block at C & S Primary School, Igbo Ayo, Amuwo Odofin | SUBEB | Lard-Bod & Company | 12,051,158.02 | 10/04/2008 | 8 Weeks | 70% |
| 255 | Conversion of 1 No. 6 Classrooms Block at L.A. Primary School, Odon Iyagbe, Amuwo Odofin | SUBEB | Fabolams Nigeria Ltd. | 12,051,158.02 | 10/04/2008 | 8 Weeks | 70% |
| 256 | Conversion of 1 No. 6 Classrooms Block at L.A. Primary School, Ikere Irede, Amuwo Odofin | SUBEB | Momtek Project Limited | 12,051,158.02 | 10/04/2008 | 8 Weeks | 70% |
| 257 | Conversion of 1 No. 6 Classrooms Block at Metropolitan Primary School, Apapa | SUBEB | Fais Associates | 12,051,158.02 | 10/04/2008 | 8 Weeks | 70% |
| 258 | Conversion of 1 No. 6 Classrooms Block atA.U.D. Primary School, Badagry | SUBEB | Tafeco International Limited | 12,051,158.02 | 10/04/2008 | 8 Weeks | 70% |
| 259 | Conversion of 1 No. 6 Classrooms Block at L.G. Primary School, Imosan, Epe | SUBEB | Tadam Engineering Services | 12,051,158.02 | 10/04/2008 | 8 Weeks | 70% |
| 260 | Conversion of 1 No. 6 Classrooms Block at Itedo Primary School, Moba, Itedo, Eti-Osa | SUBEB | Kas Mansur Nig. Ltd. | 12,051,158.02 | 10/04/2008 | 8 Weeks | 70% |
| 261 | Conversion of 1 No. 6 Classrooms Block at Community Primary School, Okegun, Ibeju-Lekki | SUBEB | Amec Consult Ltd. | 12,051,158.02 | 10/04/2008 | 8 Weeks | 70% |
| 262 | Conversion of 1 No. 6 Classrooms Block at Saints Primary School, Iju Garage, Ifako-Ijaiye | SUBEB | Hamdalat Enterprises Nig. Ltd. | 12,051,158.02 | 10/04/2008 | 8 Weeks | 70% |
| 263 | Conversion of 1 No. 6 Classrooms Block at Fred Williams Primary School, Iju , Ifako-Ijaiye | SUBEB | Defas Enterprises Ltd. | 12,051,158.02 | 10/04/2008 | 8 Weeks | 70% |
| 264 | Conversion of 1 No. 6 Classrooms Block at Holy Trinity Primary School, Iju , Ifako-Ijaiye | SUBEB | Hea-Bond Nigeria Ltd. | 12,051,158.02 | 10/04/2008 | 8 Weeks | 70% |
| 265 | Construction of 1 No. 6 Classrooms Block with Office at Irewe Primary School, Irewe, Amuwo Odofin | SUBEB | Gold Card Investment & Properties Ltd. | 12,051,158.02 | 10/04/2008 | 8 Weeks | 70% |
| 266 | Construction of 1 No. 6 Classrooms Block with Office at Olumole Primary School, College Road, Oluti, Amuwo Odofin | SUBEB | Lawy International Company | 12,051,158.02 | 10/04/2008 | 8 Weeks | 70% |
| 267 | Conversion of 1 No. 6 Classrooms Block at State Primary School, Ikeja | SUBEB | Yinac Konsult | 12,051,158.02 | 10/04/2008 | 8 Weeks | 70% |
| 268 | Conversion of 1 No. 6 Classrooms Block at UNA Primary School, Ikorodu | SUBEB | Jalamor Consult Ltd. | 12,051,158.02 | 10/04/2008 | 8 Weeks | 70% |
| 269 | Conversion of 1 No. 6 Classrooms Block at Irepodun Primary School, Alapere, Kosofe | SUBEB | Coseng Engineering Consult | 12,051,158.02 | 10/04/2008 | 8 Weeks | 70% |
| 270 | Conversion of 1 No. 6 Classrooms Block at Army Demonstration Primary School, Ojo | SUBEB | Flory Struc-Tech Ltd. | 12,051,158.02 | 10/04/2008 | 8 Weeks | 70% |
| 271 | Conversion of 1 No. 6 Classrooms Block at L.G. Primary School, Shogunle, Oshodi/Isolo | SUBEB | Gaywod Nigeria Company Ltd. | 12,051,158.02 | 10/04/2008 | 8 Weeks | 70% |
| 272 | Conversion of 1 No. 6 Classrooms Block at Jehovah Jireh UNA Primary School, Somolu | SUBEB | Bolf Limited | 12,051,158.02 | 10/04/2008 | 8 Weeks | 70% |
| 273 | Conversion of 1 No. 6 Classrooms Block at Jehovah Jireh UNA Primary School, Surulere | SUBEB | Topydeen Ventures | 12,051,158.02 | 10/04/2008 | 8 Weeks | 70% |
| 274 | Production and Installation of Longspan Aluminum Roofing Sheets | SUBEB | Idrezat Nigeria Enterprise | 88,353,016.20 | 10/04/2008 | 8 Weeks | 70% |
| 275 | Metalworks | SUBEB | Akbix Woods and Metal | 37,690,999.00 | 10/04/2008 | 8 Weeks | 70% |
| 276 | Production and Application of Paints | SUBEB | Ad-Olmasol Ventures | 21,629,915.80 | 10/04/2008 | 8 Weeks | 70% |
| 277 | Installation of PVC Plastic Tongue and Groove Ceiling | SUBEB | LBBS Limited | 42,950,000.00 | 10/04/2008 | 8 Weeks | 70% |
| 278 | Procurement of Textbooks for Pupils/Students in Lagos State Public Schools | Education | Evans Brothers (Nigeria Publishers) Limited | 580,211,887.25 | 11/4/2008 | 9 Weeks | 70% |
| 279 | Procurement of Textbooks for Pupils/Students in Lagos State Public Schools | Education | Longman Nigeria PLC | 1,552,767,744.09 | 11/4/2008 | 9 Weeks | 70% |
| 280 | Procurement of Textbooks for Pupils/Students in Lagos State Public Schools | Education | Macmillan Nigeria Publishers Limited | 382,837,697.50 | 11/4/2008 | 9 Weeks | 70% |
| 281 | Procurement of Textbooks for Pupils/Students in Lagos State Public Schools | Education | University Press PLC | 147,774,028.63 | 11/4/2008 | 9 Weeks | 70% |
| 282 | Procurement of Textbooks for Pupils/Students in Lagos State Public Schools | Education | Tonad Publishers Ltd | 173,799,067.50 | 11/4/2008 | 9 Weeks | 70% |
| 283 | Construction of Mini Water Works in Ikate, Surulere | Lagos Water Corporation | HFP Engineering Nig. Ltd | 506,537,882.38 | 14/4/2008 | 6 Months | 50% |
| 284 | Construction of Mini Water Works in Lagos Road, Ikorodu | Lagos Water Corporation | Seg Mahsen Nig. Ltd | 457,363,149.50 | 14/4/2008 | 6 Months | 50% |
| 285 | Construction of Mini Water Works in Badore, Eti-Osa LG | Lagos Water Corporation | Seg Mahsen Nig. Ltd | 506,537,882.38 | 14/4/2008 | 6 Months | 50% |
| 286 | Construction of Mini Water Works in Magodo, Ikosi-Ketu | Lagos Water Corporation | Naston Engineering Nig. Ltd | 457,363,149.50 | 14/4/2008 | 6 Months | 50% |
| 287 | Construction of Mini Water Works in Imeke Iworo, Badagry LG | Lagos Water Corporation | Mikron Services Nig. Ltd | 506,537,882.38 | 14/4/2008 | 6 Months | 50% |
| 288 | Construction of Mini Water Works in Mende, Kosofe LG | Lagos Water Corporation | Kaolins Nig. Ltd | 457,363,149.50 | 14/4/2008 | 6 Months | 50% |
| 289 | Construction of Mini Water Works in Ojokoro, Ifako-Ijaiye LG | Lagos Water Corporation | Divine Gate Ltd/Eauxwell Nig. Ltd. | 457,363,149.50 | 14/4/2008 | 6 Months | 50% |
| 290 | Construction of Mini Water Works in Epe/Agric, Epe LG | Lagos Water Corporation | Naston Engineering Nig. Ltd | 457,363,149.50 | 14/4/2008 | 6 Months | 50% |
| 291 | Construction of Mini Water Works in Ajangbadi, Ojo LG | Lagos Water Corporation | Naston Engineering Nig. Ltd | 506,537,882.38 | 14/4/2008 | 6 Months | 50% |
| 292 | Construction of Mini Water Works in Meiran, Alimosho LG | Lagos Water Corporation | HFP Engineering Nig. Ltd | 457,363,149.50 | 14/4/2008 | 6 Months | 50% |
| 293 | Construction of Mini Water Works in Isheri Oshun, Alimosho LG | Lagos Water Corporation | Naston Engineering Nig. Ltd | 506,537,882.38 | 14/4/2008 | 6 Months | 50% |
| 294 | Construction of Mini Water Works in Ajegunle, Ajeromi-Ifelodun LG | Lagos Water Corporation | Seg Mahsen Nig. Ltd | 506,537,882.38 | 14/4/2008 | 6 Months | 50% |
| 295 | Dredging of Ayeke Achapo Channel,Ajegunle, Ajeromi Ifelodun LGA | Office of Drainage Services | Bam-Darley Nigeria Limited | 100,408,437.50 | 18/04/2008 | 16 weeks | 50% |
| 296 | Dredging of Apena - Alaka Channel, Olodi Apapa Ajeromi Ifelodun LGA | Office of Drainage Services | Bam-Darley Nigeria Limited | 13,467,750.00 | 18/04/2008 | 8 weeks | 50% |
| 297 | Dredging of Ado Soba - FESTAC Channel,Ado Soba, Amuwo Odofin LGA | Office of Drainage Services | Bashball Squad Ventures | 27,933,400.00 | 18/04/2008 | 8 weeks | 50% |
| 298 | Dredging of Satellite Town Main Channel,Satellite Town, Amuwo Odofin LGA | Office of Drainage Services | Bashball Squad Ventures | 10,408,000.00 | 18/04/2008 | 8 weeks | 50% |
| 299 | Dredging of Lagos Badagry Expressway Channel,Ojo, Ojo LGA | Office of Drainage Services | Bashball Squad Ventures | 80,809,000.00 | 18/04/2008 | 16 weeks | 50% |
| 300 | Dredging of Abacha Estate Channel,Dolphin/Osborne, Eti Osa LGA | Office of Drainage Services | Foundry Indstrial Company | 13,672,750.00 | 18/04/2008 | 8 weeks | 50% |
| 301 | Dredging of Yaya Abatan - Oyemekun Channel, Ifako Ijaiye,Ogba, Ifako Ijaiye LGA | Office of Drainage Services | Gtoj Construction & Plants Limited | 76,028,750.00 | 18/04/2008 | 12 weeks | 50% |
| 302 | Dredging of Adetola Canal, Ijaiye Ojokoro,Ijaiye Ojokoro, Alimosho LGA | Office of Drainage Services | Alma Essence Limited | 65,167,500.00 | 18/04/2008 | 12 weeks | 50% |
| 303 | Dredging of CMD - Omole - Agiliti Channel ,Kosofe LGA | Office of Drainage Services | Lukam Nigeria Limited | 60,965,000.00 | 18/04/2008 | 16 weeks | 50% |
| 304 | Dredging of CMD - Omole - Agiliti Channel II,Kosofe LGA | Office of Drainage Services | Lukam Nigeria Limited | 42,675,500.00 | 18/04/2008 | 12 weeks | 50% |
| 305 | Dredging of Otto Creek,Otto, Mainland LGA | Office of Drainage Services | P.W. Nigeria Limited | 168,686,250.00 | 18/04/2008 | 20 weeks | 50% |
| 306 | Dredging of Mafoluku - Ajao Estate - Airport Outlet Channel,Oshodi Isolo LGA | Office of Drainage Services | Folad Construction & Engineers Limited | 46,760,250.00 | 18/04/2008 | 12 weeks | 50% |
| 307 | Dredging of Badagry Channel,Badagry LGA | Office of Drainage Services | Doakdot Enterprises | 19,330,000.00 | 18/04/2008 | 8 weeks | 50% |
| 308 | Dredging of Irede - Ira Channel, Agric - Ojo, Ojo LGA | Office of Drainage Services | Karitome Ventures | 35,530,500.00 | 18/04/2008 | 10 weeks | 50% |
| 309 | Dredging of Olubori - Alaba Rago - Alaba Inter. Channel, Ojo LGA | Office of Drainage Services | Karitome Ventures | 29,608,750.00 | 18/04/2008 | 10 weeks | 50% |
| 310 | Dredging of Kemberi Rd - Afromedia Rd Channel,Okokomaiko, Ojo LGA | Office of Drainage Services | Fair Deal Nigeria Enterprises | 35,387,200.00 | 18/04/2008 | 12 weeks | 50% |
| 311 | Dredging of Alaka Iponri National Theartre,Iponri, Surulere LGA,Iponri, Surulere LGA | Office of Drainage Services | Donys Global Concept Limited | 23,232,587.50 | 18/04/2008 | 10 weeks | 50% |
| 312 | Dredging of Sanya - Coker Aguda Channel,Surulere LGA | Office of Drainage Services | Tisros Nigeria Limited | 30,521,277.00 | 18/04/2008 | 10 weeks | 50% |
| 313 | Construction of Collector along Abeokuta Exp. From Ikeja to Idi Mangoro,Agege LGA | Office of Drainage Services | Waste Control Nigeria Limited | 159,905,123.83 | 18/04/2008 | 24 weeks | 50% |
| 314 | Construction of Old Ewu Road Collector Drain, Ewu Tuntun,Oshodi Isolo LGA | Office of Drainage Services | Shengil Global Constrction Nigeria Limited | 79,094,888.91 | 18/04/2008 | 20 weeks | 50% |
| 315 | Construction of Falana / Kolawole Sebili Interceptor | Office of Drainage Services | Shengil Global Constrction Nigeria Limited | 56,109,041.89 | 18/04/2008 | 16 weeks | 50% |
| 316 | Construction of Odunukan / Ariyo and Fatai Kadiri Streets Collector Drain,Fola Agoro, Shomolu LGA | Office of Drainage Services | Tolubash Enterprises Limited | 45,475,507.34 | 18/04/2008 | 16 weeks | 50% |
| 317 | Construction of Omodunni Outfall Collector Drain,Itire Ikate, Surulere LGA | Office of Drainage Services | Solad Venture | 63,212,066.11 | 18/04/2008 | 20 weeks | 50% |
| 318 | Construction of Oladunjoye Collector Drain II, Orile Agege,Oko Oba, Agege LGA. | Office of Drainage Services | Andy Phillip Ventures Limited | 70,550,820.26 | 18/04/2008 | 16 weeks | 50% |
| 319 | Construction of Balogun Ilawe Collector Drain, Dopemu, Agege | Office of Drainage Services | Andy Phillip Ventures Limited | 18,703,013.96 | 18/04/2008 | 10 weeks | 50% |
| 320 | Construction of Powerline - Old Otta Road Collector Drain, Agege | Office of Drainage Services | Dew International Limited | 50,107,125.58 | 18/04/2008 | 20 weeks | 50% |
| 321 | Construction of Orile Road Ipaja Road Collector drain Agege | Office of Drainage Services | Dew International Limited | 15,585,844.97 | 18/04/2008 | 8 weeks | 50% |
| 322 | Construction of Ajara / Iluda Collector Drain,Badagry, Badagry LGA | Office of Drainage Services | Tage Engineering Resources Limited | 31,171,689.94 | 18/04/2008 | 18 weeks | 50% |
| 323 | Construction of Abia Channel Decks on Pile and Dredging of Channel,Badagry, Badagry LGA | Office of Drainage Services | Tage Engineering Resources Limited | 50,000,000.00 | 18/04/2008 | 18 weeks | 50% |
| 324 | Construction of Mainland Collector Drains,Ebute Metta, Lagos Mainland LGA | Office of Drainage Services | P. W. Nigeria Limited | 600,000,000.00 | 18/04/2008 | 30 weeks | 50% |
| 325 | Construction of Adeoyo / Igbo Owu / Sunplast Collector Drain,Ilasamaja, Mushin | Office of Drainage Services | Keen-Bayo Ventures Limited | 64,382,448.85 | 18/04/2008 | 20 weeks | 50% |
| 326 | Construction of Adeoyo Ilasa Collector ,Ilasamaja,Mushin LGA | Office of Drainage Services | Keen-Bayo Ventures Limited | 63,517,879.61 | 18/04/2008 | 20 weeks | 50% |
| 327 | Infrastructural Improvement of Yaba to Iddo-Variation on Phase I (Landscaping and Beautification of Median from Oyingbo to Iddo) | Office of Infrastructure | P. W. Nigeria Limited | 107,855,452.63 | 18/04/2008 | ||
| 328 | Construction of Ojokoro / Bajomo Community,Agege Local Government | Office of Drainage Services | Primal Ventures | 47,934,790.87 | 30/04/2008 | 50% | |
| 329 | Construction of Omhantan / Ojoku / Tolu MaIn Collector Phase 1,Agege Local Government | Office of Drainage Services | Basiru Kola Abanikanda & Sons | 71,088,044.60 | 30/04/2008 | 50% | |
| 330 | LOTAD / Ogunji / Isheri / Conduit,Agege Local Government | Office of Drainage Services | Basiru Kola Abanikanda & Sons | 47,169,001.21 | 30/04/2008 | 50% | |
| 331 | Construction of ROSELLA Collector Drain, Idimu,Alimosho Local Government | Office of Drainage Services | Hogg Engineering Limited | 52,342,674.25 | 30/04/2008 | 50% | |
| 332 | Construction of Ahmed Oghere / LASU Road Collector,Alimosho Local Government | Office of Drainage Services | Arkisortium Limited | 37,387,624.47 | 30/04/2008 | 50% | |
| 333 | Construction of Igando Estate Collector Conduit,Alimosho Local Government | Office of Drainage Services | Teekom Global Ventures | 82,543,619.25 | 30/04/2008 | 50% | |
| 334 | Construction of NPF / NTI Collector Drain, Ijegun, Satelite Town,Amuwo Odofin Local Government | Office of Drainage Services | ABUOTO Investment & Marketing Co. Ltd. | 54,425,770.63 | 30/04/2008 | 50% | |
| 335 | Lining of Majeobaje Collector Drain, Ojokoro,Ifako Ijaiye Local Government | Office of Drainage Services | ZARPEX Construction Limited | 17,101,620.37 | 30/04/2008 | 50% | |
| 336 | Construction of Brigth Street Collector Drain, Jibowu, Abule Egba,Ifako Ijaiye Local Government | Office of Drainage Services | ZARPEX Construction Limited | 11,216,287.35 | 30/04/2008 | 50% | |
| 337 | Construction of Adeniji Street Drain, Alakuko,Ifako Ijaiye Local Government | Office of Drainage Services | ZARPEX Construction Limited | 27,212,885.31 | 30/04/2008 | 50% | |
| 338 | Construction of Bajomo Collector Drain, Ojokoro,Ifako Ijaiye Local Government | Office of Drainage Services | ZARPEX Construction Limited | 28,757,619.37 | 30/04/2008 | 50% | |
| 339 | Construction of Ganiyu Lamina Collector Drain,Ifako Ijaiye Local Government | Office of Drainage Services | ZARPEX Construction Limited | 43,136,429.07 | 30/04/2008 | 50% | |
| 340 | Construction of Sola Martins Collector Drain,Ifako Ijaiye Local Government | Office of Drainage Services | ZARPEX Construction Limited | 56,452,235.57 | 30/04/2008 | 50% | |
| 341 | Construction of Adeniji Street Drain, Alakuko,Ifako Ijaiye Local Government | Office of Drainage Services | ZARPEX Construction Limited | 9,070,961.77 | 30/04/2008 | 50% | |
| 342 | African Church Grammar School Collector Drain,Ifako Ijaiye Local Government | Office of Drainage Services | ZARPEX Construction Limited | 30,236,539.24 | 30/04/2008 | 50% | |
| 343 | Ope-Ewe / Al-Maroof / Lilian / Magaret / Odusanya Close Jankara Collector Drain,Ifako Ijaiye Local Government | Office of Drainage Services | ZARPEX Construction Limited | 67,524,240.76 | 30/04/2008 | 50% | |
| 344 | Construction of Beckley Estate Collector Drain,Ifako Ijaiye Local Government | Office of Drainage Services | ZARPEX Construction Limited | 37,387,624.47 | 30/04/2008 | 50% | |
| 345 | Construction of Oja Bus Stop, Council, Isawo Road,Ikorodu Local Government,Ikorodu Local Government | Office of Drainage Services | MOCELET Nig. Ltd. | 29,910,099.57 | 30/04/2008 | 50% | |
| 346 | Construction of Oke Oyinbo Downstream Collector, Ijede,Ikorodu Local Government | Office of Drainage Services | MOCELET Nig. Ltd. | 11,216,287.35 | 30/04/2008 | 50% | |
| 347 | Construction of Odonla / Odongunyan Collector Drain, ,Ikorodu Local Government | Office of Drainage Services | MOCELET Nig. Ltd. | 22,432,574.68 | 30/04/2008 | 50% | |
| 348 | Construction of Amoke Shoderu Collector Drain,Ikorodu Local Government | Office of Drainage Services | MOCELET Nig. Ltd. | 12,094,615.70 | 30/04/2008 | 50% | |
| 349 | Construction of Oke Oyinbo Downstream Collector, Ijede,Ikorodu Local Government | Office of Drainage Services | MOCELET Nig. Ltd. | 22,432,574.68 | 30/04/2008 | 50% | |
| 350 | Construction of Ori Okuta Collector Drain,Ikorodu Local Government | Office of Drainage Services | MOCELET Nig. Ltd. | 60,473,078.48 | 30/04/2008 | 50% | |
| 351 | Construction of Alogba Lowa Collector Drain,Ikorodu Local Government | Office of Drainage Services | MOCELET Nig. Ltd. | 56,081,436.71 | 30/04/2008 | 50% | |
| 352 | Construction of Bello Adigun Collector Drain, Magodo,Kosofe Local Government | Office of Drainage Services | Abiodun Sunmola Concrete Works | 24,569,344.56 | 30/04/2008 | 50% | |
| 353 | Construction of Ogundele Arowojobe Collector Drain,Kosofe Local Government | Office of Drainage Services | Abiodun Sunmola Concrete Works | 42,331,154.93 | 30/04/2008 | 50% | |
| 354 | Construction of Ilasamaja / Expressway / Outfall Collector Drain,Mushin Local Government | Office of Drainage Services | Joyfases Nig. Ltd. | 60,473,078.48 | 30/04/2008 | 50% | |
| 355 | Rehabilitation of Abayomi Owulade/Olayeni/Adetoro Street in Magodo, Kosofe L.G.A | Office of Infrastructure | Lespray Engineering Limited | 195,609,786.47 | 30/04/2008 | 8 Weeks | 50% |
| 356 | Rehabilitation of Tokunbo Macaulay/Tunde Abimbola Street in Magodo, Kosofe L.G.A | Office of Infrastructure | SKS Construction Limited | 119,574,692.80 | 30/04/2008 | 8 Weeks | 50% |
| 357 | Rehabilitation of Aigbokhai Drive/Nwahere Road/Onuoha Close/Olumuyiwa Oduwole Street in Magodo, Kosofe L.G.A | Office of Infrastructure | Nalex General Services Company | 47,500,000.00 | 30/04/2008 | 10 Weeks | 50% |
| 358 | Construction of Jetty and Terminal Buildings at Badore and Ipakodo (Upward Review ) | Office of Infrastructure | PW Nigeria Limited | 6,000,000,000.00 | 30/04/2008 | ||
| 359 | Construction of four storey 100 Bed Maternal and Child Complexes at Ajeromi General Hospital and Gbaja, Surulere | Ministry of Health | Deux Project Limited | 1,153,231,539.12 | 2/5/2008 | 70% | |
| 360 | Implementation of Health Information Management Systems Software "e-Health" in Ten (10) General Hospitals ,Phase II | Ministry of Science Technology | Digitronics Limited | 160,000,000.00 | 08/05/2008 | 3 Months | 70% |
| 361 | Procurement of 120G Sensitised Toner Logo and Embedded Water Mark Security Paper | Ministry of Science Technology | Techgate Nigeria Limited | 641,138,000.00 | 08/05/2008 | 70% | |
| 362 | Extension , Installation and Configuration of Livelink ansd Direc Input of 3D Bar Code on the State Certificate of Occupancy | Ministry of Science Technology | Officetron Nigeria Limited | 71,781,295.00 | 08/05/2008 | 70% | |
| 363 | Construction of Youth Centre at Ibeju | Ministry of Youth, Sports and Social Development | Adaksa Nigeria Limited | 25,659,826.63 | 14/05/2008 | 12 Weeks | 70% |
| 364 | Construction of Youth Centre at Agbowa, Epe | Ministry of Youth, Sports and Social Development | Adrolak & Associates | 25,659,826.63 | 14/05/2008 | 12 Weeks | 70% |
| 365 | Construction of Youth Centre at Imota, Ikorodu | Ministry of Youth, Sports and Social Development | Radian International Services Limited | 25,659,826.63 | 14/05/2008 | 12 Weeks | 70% |
| 366 | Construction of Road no. 90D (Part of), Lekki Phase I | New Towns Devt Authority | Olawale Bakare Comm. Ent | 81,886,858.35 | 14/05/2008 | 12 weeks | 30% |
| 367 | Construction of Road no. 27B, Lekki Phase I | New Towns Devt Authority | Fairdeal Ventures Nig. Ltd. | 49,334,366.40 | 14/05/2008 | 12 weeks | 30% |
| 368 | Construction of road no. 30 (Part of), Lekki Phase I | New Towns Devt Authority | Labus and Sons Enterprises | 81,886,858.35 | 14/05/2008 | 12 weeks | 30% |
| 369 | Construction of road no. 32, Lekki Phase I | New Towns Devt Authority | Kudwin Investment Limited | 33,817,245.00 | 14/05/2008 | 10 weeks | 30% |
| 370 | Construction of road nos. 38 & 56, Lekki Phase I | New Towns Devt Authority | Deux Project Limited | 163,513,595.30 | 14/05/2008 | 20 weeks | 30% |
| 371 | Construction of Road no. 39, Lekki Phase I | New Towns Devt Authority | Deux Project Limited | 147,480,599.20 | 14/05/2008 | 18 weeks | 30% |
| 372 | Construction of Road no. 53A (Part of), Lekki Phase I | New Towns Devt Authority | Wet-Land Construction Nigeria Limited | 99,496,331.00 | 14/05/2008 | 14 weeks | 30% |
| 373 | Construction of Road no. 55 (Part of), Lekki Phase I | New Towns Devt Authority | Manal Nigeria Limited | 66,971,270.30 | 14/05/2008 | 10 weeks | 30% |
| 374 | Construction of Road no. 55A, Lekki Phase I | New Towns Devt Authority | Manal Nigeria Limited | 156,422,570.15 | 14/05/2008 | 20 weeks | 30% |
| 375 | Construction of Road no. 60C & 3nos Box Culvert on Drainage Channel, Lekki Phase I | New Towns Devt Authority | Alybak Commercial Enterprises | 89,873,452.68 | 14/05/2008 | 14 weeks | 30% |
| 376 | Construction of Road no. 65, Lekki Phase I | New Towns Devt Authority | Ayeola Construction Company | 183,631,935.30 | 14/05/2008 | 20 weeks | 30% |
| 377 | Construction of Road no. 69/71, Lekki Phase I | New Towns Devt Authority | Bless Wyde Ventures | 31,650,176.25 | 14/05/2008 | 10 weeks | 30% |
| 378 | Construction of Road no. 98, Lekki Phase I | New Towns Devt Authority | Yob Nigeria Company | 283,617,974.20 | 14/05/2008 | 24 weeks | 30% |
| 379 | Construction of Olufere-Ebinpejo Collector Drain,Shomolu Local Government | Office of Drainage Services | Kazcar Ventures Nigeria Limited | 49,238,447.15 | 14/05/2008 | 12 Weeks | 50% |
| 380 | Construction of Bariga Primary School-Oduguwa Street Collector Drain, Bariga,Shomolu Local Government | Office of Drainage Services | RAJAF Construction Nigeria Limited | 15,316,547.36 | 14/05/2008 | 8 Weeks | 50% |
| 381 | Construction of Omodunni Outfall Collector Drain,Surulere Local Government | Office of Drainage Services | AREM Global Ventures | 63,212,066.11 | 14/05/2008 | 20 Weeks | 50% |
| 382 | Construction of Corporation Road Collector Drain,Amuwo Odofin Local Government | Office of Drainage Services | GOLDPLAN Nigeria Limited | 53,961,519.85 | 14/05/2008 | 17 Weeks | 50% |
| 383 | Dredging of Abeokuta - Anjorin (Idimu / Ejigbo)Drainage Channel,Alimosho Local Government | Office of Drainage Services | FUMTEC Ventures | 43,445,000.00 | 14/05/2008 | 18 Weeks | 50% |
| 384 | Dredging of Ekoro Drainage Channel,Alimosho Local Government | Office of Drainage Services | FUMTEC Ventures | 17,229,875.00 | 14/05/2008 | 9 Weeks | 50% |
| 385 | Dredging of Erelu - Aboru Command Drainage Channel,Alimosho Local Government | Office of Drainage Services | HARACO Ltd | 23,856,750.00 | 14/05/2008 | 10 Weeks | 50% |
| 386 | Dredging of Awolumate - Catholic Mission - Ijegun Outfall Channel,Alimosho Local Government | Office of Drainage Services | FUMTEC Ventures | 32,583,750.00 | 14/05/2008 | 14Weeks | 50% |
| 387 | Dredging of Joseph Dosu Road Drainage Channel,Badagry Local Government | Office of Drainage Services | MALEVICMA INT. Co Ltd | 61,527,375.00 | 14/05/2008 | 28Weeks | 50% |
| 388 | Dredging of Local Government Secretariat - Express Road Drainage Channel, Badagry,Badagry Local Government | Office of Drainage Services | Laibola Link International Company | 28,101,600.00 | 14/05/2008 | 10Weeks | 50% |
| 389 | Dredging of Ebinpejo - Arowojobe Drainage Channel,Kosofe Local Government | Office of Drainage Services | Folad Construction & Engineering Limited | 61,578,750.00 | 14/05/2008 | 28Weeks | 50% |
| 390 | Dredging of Ajegunle Bus Stop Drainage Channel, Owode Ajegunle,Kosofe Local Government | Office of Drainage Services | FUMTEC Ventures | 32,583,750.00 | 14/05/2008 | 15Weeks | 50% |
| 391 | Dredging of Ile Epo Bus Stop Drainage Channel Reach, Owode Ajegunle,Kosofe Local Government | Office of Drainage Services | FUMTEC Ventures | 28,239,250.00 | 14/05/2008 | 12Weeks | 50% |
| 392 | Construction of Orile Road, Ipaja Road Collector Drain, Agege,Agege Local Government | Office of Drainage Services | D. QUARTET SERVICES LTD | 15,585,844.97 | 14/05/2008 | 7Weeks | 50% |
| 393 | Construction of Wilmer / Alakoto Drainage Channel, Olodi Apapa - Wilmer ,Ajegunle,Ajeromi / Ifelodun Local Government | Office of Drainage Services | AQUA SOLAS Company Ltd. | 14,441,900.46 | 14/05/2008 | 7Weeks | 50% |
| 394 | Construction of Adeshina / Gbolahan Collector Drain, Alimosho,Alimosho Local Government | Office of Drainage Services | Macloy Limited | 38,543,942.75 | 14/05/2008 | 16Weeks | 50% |
| 395 | Construction of Karimu Laka - Bameke Collector Drain, Alimosho,Alimosho Local Government | Office of Drainage Services | Macloy Limited | 30,835,154.20 | 14/05/2008 | 12Weeks | 50% |
| 396 | Construction of Ibikunle Collector Drain, Ekoro, Abule Egba,Alimosho Local Government | Office of Drainage Services | Macloy Limited | 50,107,125.58 | 14/05/2008 | 22Weeks | 50% |
| 397 | Construction Adeshina / Gbolahan Collector Drain, Igando,Alimosho Local Government | Office of Drainage Services | Macloy Limited | 26,980,759.93 | 14/05/2008 | 11Weeks | 50% |
| 398 | Construction of Ishaga / Imulokanle Collector Drain, Agbelekale, Abule Egba,Alimosho Local Government | Office of Drainage Services | Macloy Limited | 38,543,942.75 | 14/05/2008 | 16Weeks | 50% |
| 399 | Construction of Suberu Oje Collector Drain, Abule Egba,Alimosho Local Government | Office of Drainage Services | Macloy Limited | 53,961,519.58 | 14/05/2008 | 24Weeks | 50% |
| 400 | Construction of Pipeline Road Collector Drain, Idimu,Alimosho Local Government | Office of Drainage Services | Macloy Limited | 46,842,151.18 | 14/05/2008 | 20Weeks | 50% |
| 401 | Construction of Tolu Aluko Collector Drain,Alimosho Local Government | Office of Drainage Services | Macloy Limited | 56,329,357.54 | 14/05/2008 | 26Weeks | 50% |
| 402 | Construction of Yisa Olusesi Collector Drain, Alagbado,Alimosho Local Government | Office of Drainage Services | Macloy Limited | 11,588,387.96 | 14/05/2008 | 6Weeks | 50% |
| 403 | Construction of Akin Lawanson / Osoba Avenue Collector Drain, Oluwaga, Ipaja,Alimosho Local Government | Office of Drainage Services | Macloy Limited | 33,458,679.42 | 14/05/2008 | 16Weeks | 50% |
| 404 | Rehabilitation of Crystal Estate / Durbar Hotel Channel, Amuwo Collector Drain to the outfall,Amuwo Odofin Local Government | Office of Drainage Services | NIGERLOYD Nig. Ltd | 20,075,207.65 | 14/05/2008 | 12Weeks | 50% |
| 405 | Rehabilitation of Apapa Oworonshoki Expressway- Mile 2,Amuwo Odofin Local Government | Office of Drainage Services | DABEF Enterprises Ltd | 15,417,577.10 | 14/05/2008 | 7Weeks | 50% |
| 406 | Rehabilitation of Festac Extension, Eko Akete Collector Drain, Amuwo Odofin,Amuwo Odofin Local Government | Office of Drainage Services | RAHAQ Ventures Ltd | 15,417,577.10 | 14/05/2008 | 7Weeks | 50% |
| 407 | Construction of 7th Avenue ouitfall Channel,Amuwo Odofin Local Government | Office of Drainage Services | River Oaks Ventures | 46,252,731.30 | 14/05/2008 | 20Weeks | 50% |
| 408 | Construction of Gbagada / Atunrase Trapezoidal Drain, Phase 1,Kosofe Local Government | Office of Drainage Services | Edward Properties Consult | 132,327,195.69 | 14/05/2008 | 16Weeks | 50% |
| 409 | Construction of Omole Jubilee Estate Drainage Network,Kosofe Local Government | Office of Drainage Services | Glow Ventures | 41,040,061.21 | 14/05/2008 | 18Weeks | 50% |
| 410 | Construction of Cathedral Church Collector Drain,Lagos Island Local Government | Office of Drainage Services | GENERATION TWENTY ONE LIMITED | 25,496,446.04 | 14/05/2008 | 13Weeks | 50% |
| 411 | Construction of Ejigbo / Idimu Drain Extension,Oshodi / Isolo Local Government | Office of Drainage Services | Mafinco Company Limited | 36,616,745.61 | 14/05/2008 | 15Weeks | 50% |
| 412 | Rehabilitation of Johnson Osonwa Drainage Network & Culvert,Oshodi / Isolo Local Government | Office of Drainage Services | Mafinco Company Limited | 19,271,971.38 | 14/05/2008 | 11Weeks | 50% |
| 413 | Construction of Alhaja Agbeke Outfall Collector Drain Extension,Oshodi / Isolo Local Government | Office of Drainage Services | Mafinco Company Limited | 49,874,703.90 | 14/05/2008 | 21Weeks | 50% |
| 414 | Construction of JEMTOK / KINOSHI Collector Drain,Oshodi / Isolo Local Government | Office of Drainage Services | Mafinco Company Limited | 41,688,860.98 | 14/05/2008 | 18Weeks | 50% |
| 415 | Construction of Ilufunmi Drain Extension,Oshodi / Isolo Local Government | Office of Drainage Services | Mafinco Company Limited | 15,585,844.97 | 14/05/2008 | 7Weeks | 50% |
| 416 | Construction of Relief Drain along Alafia Street to deflood Itire-Lawanson Road including desilting of Itire-Lawanson Road, Surulere(Review of Contract ) | Office of Infrastructure | Seratto Ventures Limited | 117,047,995.55 | 14/05/2008 | 14 Weeks | 50% |
| 417 | Construction of Iba-Goriola Oseni Avenue- Abanishe- Ishasi Road with Bridge | Office of Infrastructure | CCECC Nigeria Limited | 2,682,729,808.00 | 14/05/2008 | 12 Months | 50% |
| 418 | Construction of Agboroko-Igbo Elerin Road, Ojo LGA | Office of Infrastructure | CCECC Nigeria Limited | 2,797,924,500.00 | 14/05/2008 | 12 Months | 50% |
| 419 | Decongestion of Traffic at Agric Bus-Stop in Ikorodu Local Government Area | Office of Infrastructure | Jallis Nigeria Limited | 217,778,065.31 | 14/05/2008 | 20 Weeks | 50% |
| 420 | Rehabilitation of Afric Road in Lagos Mainland Local Government Area | Office of Infrastructure | Laranod Ventures Limited | 39,413,636.13 | 14/05/2008 | 12 Weeks | 50% |
| 421 | Construction of Additional Facilities for the Football Pitch, Flood and Garden Lights at Lagos House, Ikeja | Office of Works | Arab Contractors O.A.O Nig. Limited | 130,000,000.00 | 14/05/2008 | 6 Weeks | 50% |
| 422 | Repair and Improvement of Landing and Jetties a). Ojo (LASU): Marina via Ijegun Egba and Mile 2 Route (Lot 1). | Lagos Metropolitan Transport Authority | Lopek Engineering & Construction Limited | 1,113,488,293.00 | 04/06/08 | 8 Months | 50% |
| 423 | Repair and Improvement of Landing and Jetties b). Oworonshoki - Osborne Route (Lot 2). | Lagos Metropolitan Transport Authority | RCF Nigeria Limited | 796,050,306.00 | 04/06/08 | 10 Months | 50% |
| 424 | Construction of 1 no block of 8 in-1, 3 bedroom flats, Ojokoro II Housing Scheme (Block A). | Ministry of Housing | Tobi Projects Ltd. | 71,390,825.19 | 04/06/08 | 6 Months | 25% |
| 425 | Construction of 1 no block of 8 in-1, 3 bedroom flats, Ojokoro II Housing Scheme (Block B). | Ministry of Housing | H. A Funlayo & Sons | 71,390,825.19 | 04/06/08 | 6 Months | 25% |
| 426 | Construction of 1 no block of 8 in-1, 3 bedroom flats, Ojokoro II Housing Scheme (Block C). | Ministry of Housing | Wale Oniloko Nigeria Limited | 71,390,825.19 | 04/06/08 | 6 Months | 25% |
| 427 | Construction of 1 no block of 8 in-1, 3 bedroom flats, Ojokoro II Housing Scheme (Block D). | Ministry of Housing | Bid Resources Nigeria Limited | 71,390,825.19 | 04/06/08 | 6 Months | 25% |
| 428 | Construction of 1 no block of 8 in-1, 3 bedroom flats, Ojokoro II Housing Scheme (Block E). | Ministry of Housing | Pleasant Land Resources Ltd. | 71,390,825.19 | 04/06/08 | 6 Months | 25% |
| 429 | Construction of 1 no block of 8 in-1, 3 bedroom flats, Ojokoro II Housing Scheme (Block F). | Ministry of Housing | DY Adesina & Co. | 71,390,825.19 | 04/06/08 | 6 Months | 25% |
| 430 | Construction of 1 no block of 8 in-1, 3 bedroom flats, Ojokoro II Housing Scheme (Block G). | Ministry of Housing | Oak Builders | 71,390,825.19 | 04/06/08 | 6 Months | 25% |
| 431 | Construction of 1 no block of 8 in-1, 3 bedroom flats, Ojokoro II Housing Scheme (Block H). | Ministry of Housing | FabolamsNigeria Ltd. | 71,390,825.19 | 04/06/08 | 6 Months | 25% |
| 432 | Construction of 1 no block of 8 in-1, 3 bedroom flats, Ojokoro II Housing Scheme (Block I). | Ministry of Housing | Bucks Ventures | 71,390,825.19 | 04/06/08 | 6 Months | 25% |
| 433 | Construction of 1 no block of 8 in-1, 3 bedroom flats, Ojokoro II Housing Scheme (Block J). | Ministry of Housing | Kots Integrated Services Nigeria Ltd. | 71,390,825.19 | 04/06/08 | 6 Months | 25% |
| 434 | Construction of Roads and Car Park Ojokoro II Housing Scheme | Ministry of Housing | Laralek Nigeria Ltd. | 166,254,442.21 | 04/06/08 | 6 Months | 25% |
| 435 | Provision of Water Supply and Reticulation (Ojokoro II & Iloro) | Ministry of Housing | KLMN Holding Ltd. | 107,958,296.40 | 04/06/08 | 6 Months | 25% |
| 436 | Provision of External Electrification in Ojokoro II Housing Scheme | Ministry of Housing | Daten & Emcon Ltd. | 23,857,062.80 | 04/06/08 | 6 Months | 25% |
| 437 | Construction of Perimeter fence, façade & gate house at Ojokoro II Housing Scheme | Ministry of Housing | Saaiko Nigeria Ltd. | 27,232,744.00 | 04/06/08 | 2 Months | 25% |
| 438 | Horticulture/landscaping of Estate, Ojokoro II Housing Scheme | Ministry of Housing | Bolf Limited | 43,925,622.21 | 04/06/08 | 2 Months | 25% |
| 439 | Construction of 1 no block of 8-in-1, 3 Bedroom flats, Iloro Housing Scheme (Block B) | Ministry of Housing | Molake Enterprises | 71,390,825.19 | 04/06/08 | 6 Months | 25% |
| 440 | Construction of 1 no block of 8-in-1, 3 Bedroom flats, Iloro Housing Scheme (Block C) | Ministry of Housing | Timfat Ventures | 71,390,825.19 | 04/06/08 | 6 Months | 25% |
| 441 | Construction of 1 no block of 8-in-1, 3 Bedroom flats, Iloro Housing Scheme (Block D) | Ministry of Housing | Tripple Hay Co. Nigeria Ltd. | 71,390,825.19 | 04/06/08 | 6 Months | 25% |
| 442 | Construction of Car Park and External Collector Drains at Iloro Housing Scheme | Ministry of Housing | Ato Properties Limited | 32,570,240.39 | 04/06/08 | 4 Months | 25% |
| 443 | Provision of External Electrification in Iloro Housing Scheme | Ministry of Housing | Daten & Emcon Ltd. | 15,936,131.29 | 04/06/08 | 4 Months | 25% |
| 444 | Construction of Perimeter Fence, Façade & Gate House at Iloro Housing Scheme | Ministry of Housing | Salfatex Company | 13,128,133.15 | 04/06/08 | 6 Weeks | 25% |
| 445 | Horticulture/Landscaping of Estate at Iloro Housing Scheme | Ministry of Housing | Taison Horticulture Ventures | 16,024,700.78 | 04/06/08 | 2 Months | 25% |
| 446 | Construction of 1 no. block of 8-in-1, 3 Bedroom flats to include External Work, Concrete Pavement, Water Supply, External Electrification, Perimeter Fence, Façade & Gatehouse and Horticulture/ Landscaping at Igbogb III Housing Scheme. | Ministry of Housing | Gaywod Nigeria Limited | 92,129,596.89 | 04/06/08 | 6 Months | 25% |
| 447 | Renovation of Rowe Park Sport Complex. | Ministry of Youth, Sports and Social Development | TDA Consulting Limited | 88,000,000.00 | 04/06/08 | 5 Months | 50% |
| 448 | Construction of Crystal Estate/ Durbar Hotel Channel, Amuwo Collector to the Outfall. Amuwo Odofin LGA. | Office of Drainage Services | Rabboni Builder | 12,714,298.00 | 04/06/08 | 12 Weeks | 50% |
| 449 | Construction of Afizman/ Anifowoshe Collector Drain. Ikeja LGA. | Office of Drainage Services | Engban Nigeria Limited | 80,283,641.00 | 04/06/08 | 35 Weeks | 50% |
| 450 | Construction of Jubril Liadi Collector Drain I, Ikosi. Kosofe LGA. | Office of Drainage Services | Arkol Nigera Limited | 20,729,173.00 | 04/06/08 | 8 Weeks | 50% |
| 451 | Construction of Jubril Liadi Collector Drain II, Ikosi. Kosofe LGA. | Office of Drainage Services | Rotsham Enterprises | 29,613,105.00 | 04/06/08 | 12 Weeks | 50% |
| 452 | Construction of Bello Adigun Collector Drain, Magodo. Kosofe LGA. | Office of Drainage Services | Nuclead Enterprises | 34,375,371.00 | 04/06/08 | 12 Weeks | 50% |
| 453 | Construction of Orimogunje / Atanda Olu Collector Drain, Isheri. Kosofe LGA. | Office of Drainage Services | Batiments Techniques Limited | 21,970,047.00 | 04/06/08 | 10 Weeks | 50% |
| 454 | Concrete Lining of Owoseni Street Canal. Surulere LGA. | Office of Drainage Services | Norbicon Limited | 24,815,782.00 | 04/06/08 | 18 Weeks | 50% |
| 455 | Construction of Amuwo / Coker (Germini) Badagry. Surulere LGA. | Office of Drainage Services | Quints Nigeria Limited | 65,910,142.00 | 04/06/08 | 34 Weeks | 50% |
| 456 | Dredging of ChinaTown / Lucaster Channel. Kosofe LGA. | Office of Drainage Services | |||||