| LAGOS STATE GOVERNMENT | |||||||
| STATE TENDERS BOARD | |||||||
| LIST OF PROJECTS AWARDED BETWEEN JANUARY AND DECEMBER, 2009 | |||||||
| S/N | PROJECT TITLE | MINISTRY/ AGENCY | CONTRACTORS | CONTRACT SUM(S) | DATE OF AWARD | DOWN PAYMENT (%) | COMPLETION/ DELIVERY PERIOD |
| 1 | Replacement of Iron Barrier, Stairwells and Hand Railings of Pedestrian Walkways on Carter Bridge and from Idumota to Iddo | Central Business District | Abicon Engineering Limited | 57,000,000.00 | 01/08/2009 | 60% | 4 Months |
| 2 | Supply of 10,000 units of furniture for Public Primary School at N15,000 | Education | Vono Product Plc | 150,000,000.00 | 19/10/2009 | 65% | 12 Weeks |
| 3 | Supply of 10,000 units of furniture for Public Primary School at N15,000 | Education | Olufemia Nig. Ltd | 150,000,000.00 | 19/10/2009 | 65% | 12 Weeks |
| 4 | Supply of 10,000 units of furniture for Public Primary School at N15,000 | Education | Omo Olofin Nig. Ltd | 150,000,000.00 | 19/10/2009 | 65% | 12 Weeks |
| 5 | Supply of 10,000 units of furniture for Public Primary School at N15,000 | Education | Bolters Nig. Ltd | 150,000,000.00 | 19/10/2009 | 65% | 12 Weeks |
| 6 | Supply of 10,000 units of furniture for Public Primary School at N15,000 | Education | Bayfor Ventures | 150,000,000.00 | 19/10/2009 | 65% | 12 Weeks |
| 7 | Supply of 10,000 units of furniture for Public Primary School at N15,000 | Education | Hurlag Tech. Ltd | 99,990,000.00 | 19/10/2009 | 65% | 12 Weeks |
| 8 | Supply of 6,666 units of furniture for Public Primary School at N15,000 | Education | Doma Industries Ltd | 99,990,000.00 | 19/10/2009 | 65% | 12 Weeks |
| 9 | Supply of 6,666 units of furniture for Public Primary School at N15,000 | Education | Amacuff Ltd | 99,990,000.00 | 19/10/2009 | 65% | 12 Weeks |
| 10 | Supply of 6,666 units of furniture for Public Primary School at N15,000 | Education | Eton House Nig. Ltd | 99,990,000.00 | 19/10/2009 | 65% | 12 Weeks |
| 11 | Supply of 6,666 units of furniture for Public Primary School at N15,000 | Education | Akit Technologies Ltd | 99,990,000.00 | 19/10/2009 | 65% | 12 Weeks |
| 12 | Supply of 6,666 units of furniture for Public Primary School at N15,000 | Education | Fosmos Nig. Ltd | 99,990,000.00 | 19/10/2009 | 65% | 12 Weeks |
| 13 | Supply of 6,666 units of furniture for Public Primary School at N15,000 | Education | Integrated Projects Ltd | 99,990,000.00 | 19/10/2009 | 65% | 12 Weeks |
| 14 | Supply of 2,365 units of furniture for Public Primary School at N15,000 and 3,072 units of furniture for Public Junior (JS I - III) and Senior secondary (SS I - II) dual desks at N21,000 | Education | Universal Furniture Ltd | 99,987,000.00 | 19/10/2009 | 65% | 12 Weeks |
| 15 | Supply of 4,760 units of furniture for Public Junior (JS I - III) and Senior secondary (SS I - II) dual desks at N21,000 | Education | Nig. Engineering Works | 99,960,000.00 | 19/10/2009 | 65% | 12 Weeks |
| 16 | Supply of 2,380 units of furniture for Public Junior (JS I - III) and Senior secondary (SS I - II) dual desks at N21,000 | Education | Dalimo Nig. Ltd | 49,980,000.00 | 19/10/2009 | 65% | 12 Weeks |
| 17 | Supply of 2,380 units of furniture for Public Junior (JS I - III) and Senior secondary (SS I - II) dual desks at N21,000 | Education | Oloyemarun Works Ltd | 49,980,000.00 | 19/10/2009 | 65% | 12 Weeks |
| 18 | Supply of 2,380 units of furniture for Public Junior (JS I - III) and Senior secondary (SS I - II) dual desks at N21,000 | Education | Home & You Ltd | 49,980,000.00 | 19/10/2009 | 65% | 12 Weeks |
| 19 | Supply of 2,380 units of furniture for Public Junior (JS I - III) and Senior secondary (SS I - II) dual desks at N21,000 | Education | Grey Modules Ltd | 49,980,000.00 | 19/10/2009 | 65% | 12 Weeks |
| 20 | Supply of 2,380 units of furniture for Public Junior (JS I - III) and Senior secondary (SS I - II) dual desks at N21,000 | Education | Kolan Logistics Ltd | 49,980,000.00 | 19/10/2009 | 65% | 12 Weeks |
| 21 | Supply of 2,380 units of furniture for Public Junior (JS I - III) and Senior secondary (SS I - II) dual desks at N21,000 | Education | Mustanig Ventures | 49,980,000.00 | 19/10/2009 | 65% | 12 Weeks |
| 22 | Supply of 2,380 units of furniture for Public Junior (JS I - III) and Senior secondary (SS I - II) dual desks at N21,000 | Education | Winsor Engineering Ltd | 49,980,000.00 | 19/10/2009 | 65% | 12 Weeks |
| 23 | Supply of 2,380 units of furniture for Public Junior (JS I - III) and Senior secondary (SS I - II) dual desks at N21,000 | Education | The Grandfather Stores | 49,980,000.00 | 19/10/2009 | 65% | 12 Weeks |
| 24 | Supply of 2,380 units of furniture for Public Junior (JS I - III) and Senior secondary (SS I - II) dual desks at N21,000 | Education | Agofe Nig. Ent. | 49,980,000.00 | 19/10/2009 | 65% | 12 Weeks |
| 25 | Supply of 2,380 units of furniture for Public Junior (JS I - III) and Senior secondary (SS I - II) dual desks at N21,000 | Education | Schoemaeka Nig | 49,980,000.00 | 19/10/2009 | 65% | 12 Weeks |
| 26 | Supply of 2,380 units of furniture for Public Junior (JS I - III) and Senior secondary (SS I - II) dual desks at N21,000 | Education | Macdonald Scientific Emporium | 49,980,000.00 | 19/10/2009 | 65% | 12 Weeks |
| 27 | Supply of 2,380 units of furniture for Public Junior (JS I - III) and Senior secondary (SS I - II) dual desks at N21,000 | Education | Hollex Industry Nig. Ltd | 49,980,000.00 | 19/10/2009 | 65% | 12 Weeks |
| 28 | Supply of 2,380 units of furniture for Public Junior (JS I - III) and Senior secondary (SS I - II) dual desks at N21,000 | Education | Mak & Co. Nig. Ltd | 49,980,000.00 | 19/10/2009 | 65% | 12 Weeks |
| 29 | Supply of 1,190 units of furniture for Public Junior (JS I - III) and Senior secondary (SS I - II) dual desks at N21,000 | Education | Binary Support Services | 24,990,000.00 | 19/10/2009 | 65% | 12 Weeks |
| 30 | Supply of 1,190 units of furniture for Public Junior (JS I - III) and Senior secondary (SS I - II) dual desks at N21,000 | Education | Nawaco Construction Nig. Ltd | 24,990,000.00 | 19/10/2009 | 65% | 12 Weeks |
| 31 | Supply of 1,190 units of furniture for Public Junior (JS I - III) and Senior secondary (SS I - II) dual desks at N21,000 | Education | Fawehinmi Furniture Factory Ltd | 24,990,000.00 | 19/10/2009 | 65% | 12 Weeks |
| 32 | Supply of 1,190 units of furniture for Public Junior (JS I - III) and Senior secondary (SS I - II) dual desks at N21,000 | Education | Almarie Nig. Ltd | 24,990,000.00 | 19/10/2009 | 65% | 12 Weeks |
| 33 | Supply of 1,190 units of furniture for Public Junior (JS I - III) and Senior secondary (SS I - II) dual desks at N21,000 | Education | Kuyore Nig. Ltd | 24,990,000.00 | 19/10/2009 | 65% | 12 Weeks |
| 34 | Supply of 1,190 units of furniture for Public Junior (JS I - III) and Senior secondary (SS I - II) dual desks at N21,000 | Education | Honeyspring Nig. Ltd | 24,990,000.00 | 19/10/2009 | 65% | 12 Weeks |
| 35 | Supply of 1,190 units of furniture for Public Junior (JS I - III) and Senior secondary (SS I - II) dual desks at N21,000 | Education | Shoday Nigeria Limited | 24,990,000.00 | 19/10/2009 | 65% | 12 Weeks |
| 36 | Management and Administration of Court Automated Information System (CAIS) | Judicial Service Commission | Pineware Innovation | 20,000,000.00 | 24/06/2009 | 70% | 12 Months |
| 37 | Management and Administration of Court Automated Information System (CAIS) | Judicial Service Commission | Movenow Limited | 20,000,000.00 | 24/06/2009 | 70% | 12 Months |
| 38 | Construction of Headquarters of the Lagos State Drivers Institute at Oshodi | Lagos State Drivers' Institute | MOL Consult | 93,000,000.00 | 22-23/05/2009 | 50% | 32 Weeks |
| 39 | Construction of a New Gate House with Adjoining Offices at the Lagos State House of Assembly | Lagos State House of Assembly | SIB Nigeria Limited | 11,800,000.00 | 31/07/2009 | 8 Weeks | |
| 40 | Construction of Judicial Service Commission Complex (Phase I-Additional Works) | Lagos State Judicial Service Commission | Barrows Construction Limited | 41,433,758.81 | 24/11/2009 | 75% | 3 Months |
| 41 | Construction of Judicial Service Commission Complex (Phase II) | Lagos State Judicial Service Commission | Barrows Construction Limited | 30,667,716.84 | 24/11/2009 | 75% | 3 Months |
| 42 | Construction of Lagos State Physical Planning and Development Authority Headquarters (Upward Review) | Lagos State Physical Planning and Development Authority | Aron Nigeria Limited | 18,290,090.00 | 22-23/05/2009 | 50% | |
| 43 | Construction of Classroom Block at Lagos State University Staff School, Ojo | Lagos State University | CCECC Nigeria Limited | 232,263,934.21 | 7/05/2009 | 50% | 3 Months |
| 44 | Purchase of Two (2) Units of Armoured Patrol Boats with Echo Sounding System | Lagos State Waterways Authority | Proforce Defence Technologies Ltd. | 154,500,000.00 | 30/10/2009 | 70% | 38 Weeks |
| 45 | Dredging of Ikorodu - Badore Ferry Route (Additional Works) | Lagos State Waterways Authority | CGGC Global Projects Limited | 262,765,800.00 | 24/11/2009 | 50% | 3 Months |
| 46 | Construction of 2MGD Mini Waterworks at Mosan Okunola in Alimosho Local Government | Lagos Water Corporation | Eldorado Nigeria Limited | 457,363,149.50 | 7/05/2009 | 50% | 8 Months |
| 47 | Construction of 2MGD Mini Waterworks at Epe, Agric (Variation claims on Piling Substructure) | Lagos Water Corporation | Naston Engineering Nigeria Limited | 49,174,732.88 | 7/05/2009 | ||
| 48 | Construction of 2MGD Mini Waterworks at Oke - Odo, Abule Egba, in Alimosho LGA | Lagos Water Corporation | Nur & Company Nigeria Limited | 452,000,000.00 | 22-23/05/2009 | 50% | 9 Months |
| 49 | Construction of 2 MGD Mini Waterworks at Oshodi, in Oshodi / Isolo LGA | Lagos Water Corporation | Seg Mahsen & Company Nigeria Limited | 457,363,149.50 | 22-23/05/2009 | 50% | 9 Months |
| 50 | Construction of Mini Waterworks at Otto-Awori (Variation Claims on Substructure of Overhead and Surface Tanks) | Lagos Water Corporation | Naston Engineering Nigeria Limited | 18,310,304.86 | 22-23/05/2009 | ||
| 51 | Construction of 50,000 Gallon Steel Overhead Tank at Ikorodu Mini Waterworks | Lagos Water Corporation | Plaschem Nigeria Limited | 30,000,000.00 | 22-23/05/2009 | 50% | |
| 52 | Renovation of Lagos Water Corporation Headquarters Building at Ijora | Lagos Water Corporation | G. Cappa Plc. | 210,000,000.00 | 01/08/2009 | 60% | 6 Months |
| 53 | Construction of 50,000 Gallon Steel Overhead Tank at Agege Mini Water Works | Lagos Water Corporation | Naston Engineering Nigeria Limited | 30,070,233.90 | 30/10/2009 | 60% | 2 Months |
| 54 | Rehabilitation of Ologun Agbaje, Eletu Ogabi, Agoro Odiyan and Ogalade Close | LAMATA | Hitech Construction Company Limited | 1,346,948,220.29 | 3/2/2009 | 50% | 12 months |
| 55 | Maintenance and Management of BRT Commissioned Street Lightings along Ikorodu Road (Mile 12 - CMS) | LAMATA | Frank's Comet Limited | 200,000,000.00 | 6-7/03/2009 | 60% | 12 Months |
| 56 | Design and Construction of the Blue line Between Okokomaiko and Marina under the Lagos Rail Mass Transit Project (Phase I) | LAMATA | CCECC Group | 11,500,000,000.00 | 7/05/2009 | 70% | 12 Months |
| 57 | Procurement of Specialized Equipment for Disaster Management - (Downward Review of the Scope of the Project) | LASEMA | Royal Trends International | 30/10/2009 | |||
| 58 | Construction of Emergency Relief/ Resettlement Centre at Oko-Afo, Badagry | LASEMA | Neesarm Ventures Nigeria Limited | 305,000,000.00 | 30/10/2009 | 50% | 6 Months |
| 59 | Provision of Furniture and Equipment for Trauma and Burns Centre at LASUTH Annex, Gbagada | LASEMA and Ministry of Health | Deux Project Limited | 660,233,675.00 | 30/10/2009 | 70% | 8 Weeks |
| 60 | Renovation of Lagos State Traffic Management Authority Headquarters and Annexes, Oshodi | LASTMA | Bat - Richy Nigeria Limited | 60,000,000.00 | 6-7/03/2009 | 60% | 4 Months |
| 61 | Construction of Animal House for Lagos State University College of Medicine | LASUCOM | Deux Projects Limited | 35,000,000.00 | 22-23/05/2009 | 50% | 3 Months |
| 62 | Facility Management for Lagos State University College of Medicine | LASUCOM | Deux Project Limited | 525,000,000.00 | 04/06/2009 | 12 Months | |
| 63 | Supply, Installation and Accessories of Shredding Hydroclave and Sterilization Equipment for Medical/ Infectious Waste Management | LAWMA | Tanit Medical Engineering Limited | 131,826,000.00 | 6-7/03/2009 | 60% | 4 Months |
| 64 | Construction of Sanitary Landfill Site in Badagry | LAWMA | Cetco Contracting Services | 120,000,000.00 | 04/06/2009 | 20% | 18 Months |
| 65 | Facility Management of the Sanitary Landfill Site in Badagry for a period of Two (2)Years | LAWMA | Cetco Contracting Services | 1,575,000,000.00 | 04/06/2009 | 24 Months | |
| 66 | Supply and Installation of Two (2) Elevators at the Lagos State Liaison Office Complex, Abuja | Liaison Office | Ron Arch Consult | 21,000,000.00 | 01/08/2009 | 70% | 6 Months |
| 67 | Furnishing of Auditorium at Liaison Office Complex, Abuja | Liaison Office | Pearl Concept Limited | 22,000,000.00 | 01/08/2009 | 50% | 4 Weeks |
| 68 | Renovation of Liaison Office Complex, Abuja | Liaison Office | Pearl Concept Limited | 55,000,000.00 | 01/08/2009 | 50% | 6 Weeks |
| 69 | Construction of Primary Health Centre at Nanti Village, Apapa Local Government Area | Ministry of Economic Planning & Budget | Geo Planners | 18,281,139.89 | 31/07/2009 | 50% | 12 weeks |
| 70 | Construction of Primary Health Centre at Marine Beach (Ward F), Apapa Iganmu Local Council Development Area | Ministry of Economic Planning & Budget | Climax Construction Ltd. | 17,859,943.00 | 31/07/2009 | 50% | 12 weeks |
| 71 | Construction of Primary Health Centre at Ajeabo/Igbeyin Adu Primary School Complex, Mushin Local Government Area | Ministry of Economic Planning & Budget | Sobak Nig. Ltd. | 13,736,639.00 | 31/07/2009 | 50% | 12 weeks |
| 72 | Construction of Primary Health Centre at Esther Oshiyemi Street Near Ilupeju Police Station, Odi-Olowo Local Council Development Area | Ministry of Economic Planning & Budget | Multiple Kay Ltd. | 15,199,867.00 | 31/07/2009 | 50% | 12 weeks |
| 73 | Construction of Primary Health Centre at Local Government Secretariat Complex, Oshodi Local Government Area | Ministry of Economic Planning & Budget | Andre Ventures | 18,991,611.50 | 31/07/2009 | 50% | 12 weeks |
| 74 | Construction of Primary Health Centre at Ire Akari Estate (Ward F3) Ejigbo Local Council Development Area | Ministry of Economic Planning & Budget | Strabic Const. Ltd. | 16,910,000.00 | 31/07/2009 | 50% | 12 weeks |
| 75 | Construction of Primary Health Centre at Ire Akari Estate (Ward F4), Isolo LCDA | Ministry of Economic Planning & Budget | Bishmur Ltd. | 14,056,052.75 | 31/07/2009 | 50% | 12 weeks |
| 76 | Construction of Primary Health Centre (Osa Community), Eti-Osa LG | Ministry of Economic Planning & Budget | Sonad Ltd. | 18,709,132.80 | 31/07/2009 | 50% | 12 weeks |
| 77 | Construction of Primary Health Centre at Takwabay, Iru-Victoria Island LCDA | Ministry of Economic Planning & Budget | Civarc Ltd | 16,324,705.00 | 31/07/2009 | 50% | 12 weeks |
| 78 | Construction of Primary Health Centre (Ward H1), Eti-Osa (W) | Ministry of Economic Planning & Budget | Conswealth Nig Ltd | 16,340,000.00 | 31/07/2009 | 50% | 12 weeks |
| 79 | Renovation of Primary Health Centre (LCDC Glover Road, Ikoyi), Ikoyi Obalende LCDA | Ministry of Economic Planning & Budget | Int. Alpha Ltd. | 17,860,000.00 | 31/07/2009 | 50% | 12 weeks |
| 80 | Construction of Primary Health Centre at Ebute Afuye, Epe LG | Ministry of Economic Planning & Budget | Allison Kadiri | 15,559,102.90 | 31/07/2009 | 50% | 12 weeks |
| 81 | Construction of Primary Health Centre at Odomola, Eredo LCDA | Ministry of Economic Planning & Budget | Owolomoshe Nig. Ltd. | 15,470,275.00 | 31/07/2009 | 50% | 12 weeks |
| 82 | Construction of Primary Health Centre at Agbowa Ikosi (Ward E2), Ikosi Ejinrin LCDA | Ministry of Economic Planning & Budget | Alliedways Nig. Ltd. | 18,896,193.50 | 31/07/2009 | 50% | 12 weeks |
| 83 | Construction of Primary Health Centre at Our Lady of Lourdes Pri. Sch Clegg, Surulere LG | Ministry of Economic Planning & Budget | Fedap Const. Nig. Ltd. | 19,912,931.95 | 31/07/2009 | 50% | 12 weeks |
| 84 | Conversion of NRC Building to Primary Health Centre at Coker Village, Coker-Aguda LCDA | Ministry of Economic Planning & Budget | Gafral Ltd. | 13,965,000.00 | 31/07/2009 | 50% | 12 weeks |
| 85 | Upgrading of Primary Health Centre at Anjorin Lawanson , Baruwa Ward, Itire-Ikate LCDA | Ministry of Economic Planning & Budget | Afolabi Olalekan Ventures | 18,336,045.00 | 31/07/2009 | 50% | 12 weeks |
| 86 | Extension and Rehabilitation of Primary Health Centre at Isele (Ward 3), Ikorodu LG | Ministry of Economic Planning & Budget | Kadula Global Res. | 12,053,457.50 | 31/07/2009 | 50% | 12 weeks |
| 87 | Construction of Primary Health Centre (Ward E), Ikorodu West LCDA | Ministry of Economic Planning & Budget | Koya Const. Nig. Ltd | 18,896,193.50 | 31/07/2009 | 50% | 12 weeks |
| 88 | Construction of Primary Health Centre (Km 5, Rock Estate, Parafa, Ward E), Ikorodu North LCDA | Ministry of Economic Planning & Budget | M.A. Allison & Sons | 16,413,509.10 | 31/07/2009 | 50% | 12 weeks |
| 89 | Construction of Primary Health Centre, (Ori-Okuta, Ward B), Imota LCDA | Ministry of Economic Planning & Budget | Secon Nig. Ltd. | 16,089,322.55 | 31/07/2009 | 50% | 12 weeks |
| 90 | Construction of Primary Health Centre (Ijede Ward), Ijede LCDA | Ministry of Economic Planning & Budget | Motak Inv. Nig. Ltd. | 15,233,083.75 | 31/07/2009 | 50% | 12 weeks |
| 91 | Construction of Primary Health Centre at Owode Ibeshe, Igbogbo-Bayeiku LCDA | Ministry of Economic Planning & Budget | Kontiki Const. Nig Ltd. | 18,733,840.40 | 31/07/2009 | 50% | 12 weeks |
| 92 | Construction of Primary Health Centre at Ado Town, Amuwo-Odofin LG | Ministry of Economic Planning & Budget | Binary Support Ltd | 15,470,283.55 | 31/07/2009 | 50% | 12 weeks |
| 93 | Construction of Primary Health Centre at Oriade LCDA | Ministry of Economic Planning & Budget | Tynedale Inv. Ltd. | 15,255,223.12 | 31/07/2009 | 50% | 12 weeks |
| 94 | Construction of Primary Health Centre at Adekunle Village, Ikeja LG | Ministry of Economic Planning & Budget | Kabwas Nig. Ltd. | 16,116,084.34 | 31/07/2009 | 50% | 12 weeks |
| 95 | Construction of Primary Health Centre at Ojodu Millenium Primary School, Ojodu LCDA | Ministry of Economic Planning & Budget | First Broad Int. Ltd. | 15,531,878.70 | 31/07/2009 | 50% | 12 weeks |
| 96 | Construction of Primary Health Centre at Local Government Education Authority ,Ikeja Compound, Onigbongbo LCDA | Ministry of Economic Planning & Budget | J. Hot Nig. Ltd. | 17,425,761.67 | 31/07/2009 | 50% | 12 weeks |
| 97 | Rehabilitation of Primary Health Centre at Irewe Ward, Ojo LG | Ministry of Economic Planning & Budget | Cohort Nig. Ltd. | 12,833,184.25 | 31/07/2009 | 50% | 12 weeks |
| 98 | Construction of Primary Health Centres (Area Ward), Oto-Awori LCDA | Ministry of Economic Planning & Budget | Dreamline Ass. Ltd | 17,931,411.50 | 31/07/2009 | 50% | 12 weeks |
| 99 | Construction of Primary Health Centre (Headquarters), Iba LCDA | Ministry of Economic Planning & Budget | Visible Const. Ltd. | 17,521,570.10 | 31/07/2009 | 50% | 12 weeks |
| 100 | Construction of Primary Health Centre (Area Ward), Agege LG | Ministry of Economic Planning & Budget | Jadfem Nig. Ltd. | 18,719,056.50 | 31/07/2009 | 50% | 12 weeks |
| 101 | Construction of Primary Health Centre (Papa Ashafa Ward E), Orile Agege LCDA | Ministry of Economic Planning & Budget | Jalamor Concept Limited | 18,817,391.00 | 31/07/2009 | 50% | 12 weeks |
| 102 | Construction of Primary Health Centre (Isalu Town, Ajara), Badagry LG | Ministry of Economic Planning & Budget | Dart Engineering Limited | 18,833,690.15 | 31/07/2009 | 50% | 12 weeks |
| 103 | Construction of Primary Health Centre (Sito/Gbethrome), Badagry West LCDA | Ministry of Economic Planning & Budget | Dart Engineering Limited | 14,385,346.50 | 31/07/2009 | 50% | 12 weeks |
| 104 | Construction of Primary Health Centre at Ibereko, Olorunda LCDA | Ministry of Economic Planning & Budget | Icon Tech Limited | 14,668,102.60 | 31/07/2009 | 50% | 12 weeks |
| 105 | Construction of Primary Health Centre (Ward F.), Ifako-Ijaiye LG | Ministry of Economic Planning & Budget | Vikky Enterprises | 15,469,939.80 | 31/07/2009 | 50% | 12 weeks |
| 106 | Construction of Primary Health Centre at Adesola Street,Gbinrinmi, Ojokoro LCDA | Ministry of Economic Planning & Budget | Oluwabusore Gen. Constr. Serv. | 13,793,439.50 | 31/07/2009 | 50% | 12 weeks |
| 107 | Construction of Primary Health Centre at Eputu Town, Ibeju LG | Ministry of Economic Planning & Budget | Barminster Prop. Serv. | 16,340,000.00 | 31/07/2009 | 50% | 12 weeks |
| 108 | Rehabilitation of Primary Health Centre (Igbolomi and Folu), Lekki LCDA | Ministry of Economic Planning & Budget | Lord Yemmy Ass. Ltd | 15,625,706.45 | 31/07/2009 | 50% | 12 weeks |
| 109 | Construction of Primary Health Centre at Orisunibare, Shasha, Alimosho LG | Ministry of Economic Planning & Budget | Nezzery Nig. Ltd. | 19,714,799.00 | 31/07/2009 | 50% | 12 weeks |
| 110 | Construction of Primary Health Centre at Idimu, Egbe-Idimu LCDA | Ministry of Economic Planning & Budget | E.A.I. Nig. Ltd. | 18,518,440.25 | 31/07/2009 | 50% | 12 weeks |
| 111 | Construction of Primary Health Centre at Isheri-Oshun (Ward C), Igando-Ikotun LCDA | Ministry of Economic Planning & Budget | Laralek Utimate Ltd. | 18,456,423.30 | 31/07/2009 | 50% | 12 weeks |
| 112 | Upgrading and Extension of Primary Health Centre (Aborun Ward C), Agbado Oke-odo LCDA | Ministry of Economic Planning & Budget | Arc. Rhythm Ltd | 15,670,250.00 | 31/07/2009 | 50% | 12 weeks |
| 113 | Construction of Primary Health Centre (Ward B), Ayobo-Ipaja LCDA | Ministry of Economic Planning & Budget | Femisco Nig Ltd | 14,005,588.75 | 31/07/2009 | 50% | 12 weeks |
| 114 | Construction of Primary Health Centre at Gowon Estate, Mosan-Okunola LCDA | Ministry of Economic Planning & Budget | Capital Lay Nig Ltd | 19,074,157.00 | 31/07/2009 | 50% | 12 weeks |
| 115 | Construction of Primary Health Centre (Ward B), Lagos Mainland LG | Ministry of Economic Planning & Budget | Molisco Nig. Ltd. | 18,963,898.42 | 31/07/2009 | 50% | 12 weeks |
| 116 | Construction of Primary Health Centre at Abule Ijesha, Yaba LCDA | Ministry of Economic Planning & Budget | Nationwide Eng. & Building | 19,357,198.10 | 31/07/2009 | 50% | 12 weeks |
| 117 | Construction of Primary Health Centre at Wright Memorial School Comp. Shomolu, Shomolu LG | Ministry of Economic Planning & Budget | Primstembokel Nig Ltd | 18,006,770.58 | 31/07/2009 | 50% | 12 weeks |
| 118 | Construction of Primary Health Centre at Obanikoro, Bariga LCDA | Ministry of Economic Planning & Budget | Momtek Proj. Ltd. | 17,482,509.95 | 31/07/2009 | 50% | 12 weeks |
| 119 | Construction of Primary Health Centre at Agiliti Area, Mile 12, Ikosi Isheri LCDA | Ministry of Economic Planning & Budget | Solad Ventures | 17,514,561.95 | 31/07/2009 | 50% | 12 weeks |
| 120 | Construction of Primary Health Centre at Akanimodo Community, Agboyi Ketu LCDA | Ministry of Economic Planning & Budget | Mota Nig Co. Ltd | 16,304,104.25 | 31/07/2009 | 50% | 12 weeks |
| 121 | Construction of Primary Health Centre at Isale Eko, Lagos Island LG (W) | Ministry of Economic Planning & Budget | Laranod Vent. Ltd. | 19,093,173.15 | 31/07/2009 | 50% | 12 weeks |
| 122 | Construction of Primary Health Centre (Jakande Low Cost Housing Estate, Lagos Island ( E) LCDA | Ministry of Economic Planning & Budget | All View Designs | 18,534,658.89 | 31/07/2009 | 50% | 12 weeks |
| 123 | Construction of Primary Health Centre (Wright Memorial Sch. Ward H, Ibafon, Ajeromi Ifelodun LG | Ministry of Economic Planning & Budget | Talabi Onilegbale | 16,339,020.55 | 31/07/2009 | 50% | 12 weeks |
| 124 | Construction of Primary Health Centre (Balogun Street Alaba Oro.), Ifelodun LCDA | Ministry of Economic Planning & Budget | Portland Construction Company | 18,870,705.00 | 31/07/2009 | 50% | 12 weeks |
| 125 | Construction of Multi-Lingual Resource Centre Headquarters, Maryland | Ministry of Education | Rass International Ltd. | 45,000,000.00 | 15/10/2008 | 50% | 36 Weeks |
| 126 | Construction of Wall Fence at Community High School, Akodo - Orofun. | Ministry of Education | I.O.Ogundipe Builders Co. Ltd. | 26,000,000.00 | 15/10/2008 | 50% | 8 Weeks |
| 127 | Rehabilitation of Former Office of Schools Administration Division, Old Secretariat (Relocation of Curriculum Services Department) | Ministry of Education | Trevedi Ventures Ltd. | 12,000,000.00 | 15/10/2008 | 50% | 8 Weeks |
| 128 | Construction of Drainage, Carpark/Driveway for Education District I | Ministry of Education | Abgalan Nig. Ltd. | 17,924,782.40 | 15/10/2008 | 40% | 6 Weeks |
| 129 | Construction of Office Complex for Education District II | Ministry of Education | Rass International Ltd. | 55,467,972.85 | 15/10/2008 | 40% | 8 Weeks |
| 130 | Completion of Block of Offices/Canteen including External Works for Education District III | Ministry of Education | LABIF Ventures | 24,850,972.19 | 15/10/2008 | 40% | 6 Weeks |
| 131 | Construction of Office Complex for Education District V | Ministry of Education | Kuyore Nig. Ltd. | 61,097,604.37 | 15/10/2008 | 40% | 8 Weeks |
| 132 | Construction of Fence and Paving of Driveway for Education District V | Ministry of Education | Adbaff Nig. Ltd. | 27,486,252.63 | 15/10/2008 | 40% | 8 Weeks |
| 133 | Construction of Office Block/Canteen for Education District I | Ministry of Education | BODEZIL Investment | 25,574,272.36 | 15/10/2008 | 40% | 8 Weeks |
| 134 | Construction of Office Block/Canteen for Education District VI | Ministry of Education | Kuyore Nig. Ltd. | 28,902,380.76 | 15/10/2008 | 40% | 8 Weeks |
| 135 | Supply of 5,500 Units of Wooden Student Furniture | Ministry of Education | Amacuff Limited | 82,500,000.00 | 15/10/2008 | 40% | 8 Weeks |
| 136 | Supply of 2,750 Units of Wooden Student Furniture | Ministry of Education | Bobka Nig. Ltd. | 41,250,000.00 | 15/10/2008 | 40% | 8 Weeks |
| 137 | Supply of 2,750 Units of Wooden Student Furniture | Ministry of Education | Kuyore Nig. Ltd. | 41,250,000.00 | 15/10/2008 | 40% | 8 Weeks |
| 138 | Supply of 726 Units of Teachers Furniture | Ministry of Education | Amacuff Limited | 18,150,000.00 | 15/10/2008 | 40% | 8 Weeks |
| 139 | Renovation of Storey Block of 12 Classrooms at Lagos Baptist Senior Secondary School 1, Agege | Ministry of Education | Komplete Consult | 17,904,879.09 | 22-23/05/2009 | 50% | 12 Weeks |
| 140 | Renovation of Block of 12 Classrooms at Lagos Baptist Senior Secondary School II, Agege | Ministry of Education | Komplete Consult | 17,971,235.10 | 22-23/05/2009 | 50% | 12 Weeks |
| 141 | Renovation of a Prototype 17 + 1 Classrooms Block at Yewa Senior Grammar School, Ikorodu | Ministry of Education | Dalimo Nigeria Limited | 21,802,898.00 | 22-23/05/2009 | 50% | 12 Weeks |
| 142 | Renovation of a Prototype 17 + 1 Classrooms Block at Ojo Senior High School, Ojo | Ministry of Education | Jay Kay Building Contractor Company Limited | 21,700,802.50 | 22-23/05/2009 | 50% | 16 Weeks |
| 143 | Renovation of a Prototype 17 + 1 Classrooms Block at Ojo Junior High School, Ojo | Ministry of Education | Jay Kay Building Contractor Company Limited | 21,700,802.50 | 22-23/05/2009 | 50% | 8 Weeks |
| 144 | Renovation of a Prototype 17 + 1 Classrooms Block at Community Junior High School, Ojo | Ministry of Education | Samrot Enterprises | 21,700,802.50 | 22-23/05/2009 | 50% | 8 Weeks |
| 145 | Renovation of a Prototype 17 + 1 Classrooms Block at Lagos State Senior Model College, Ojo | Ministry of Education | Samrot Enterprises | 21,700,802.50 | 22-23/05/2009 | 50% | 8 Weeks |
| 146 | Renovation of a Prototype 17 + 1 Classrooms Block at Amuwo Odofin Junior High School,Mile 2 | Ministry of Education | Mopelola Arinola Enterprises | 21,320,896.50 | 22-23/05/2009 | 50% | 14 Weeks |
| 147 | Renovation of a Prototype 17 + 1 Classrooms Block at Lagos State Junior Model College, Ojo | Ministry of Education | SAS Progressive Ventures | 21,320,896.50 | 22-23/05/2009 | 50% | 8 Weeks |
| 148 | Renovation of a Prototype 17 + 1 Classrooms Block at Army Cantonment Boys Secondary School, Ojo | Ministry of Education | MC Wadebak Limited | 21,320,896.50 | 22-23/05/2009 | 50% | 12 Weeks |
| 149 | Renovation of a Prototype 17 + 1 Classrooms Block at Ijeshatedo Junior Grammar School, Okota | Ministry of Education | Omo Olofin Nigeria Limited | 21,887,252.50 | 22-23/05/2009 | 50% | 14 Weeks |
| 150 | Renovation of a Prototype 17 + 1 Classrooms Block at Ire Akari Senior Grammar School, Okota | Ministry of Education | Habosa Nigeria Limited | 21,700,802.50 | 22-23/05/2009 | 50% | 12 Weeks |
| 151 | Renovation of a Prototype 17 + 1 A Classrooms Block at Odofin Secondary School Mile 2 Complex | Ministry of Education | Musby Nigeria Company | 21,320,896.50 | 22-23/05/2009 | 50% | 12 Weeks |
| 152 | Renovation of a Prototype 17 + 1 B Classrooms Block at Odofin Secondary School Mile 2 Complex | Ministry of Education | Neeranet Limited | 21,320,896.50 | 22-23/05/2009 | 50% | 12 Weeks |
| 153 | Renovation of a Prototype 17 + 1 C Classrooms Block at Odofin Secondary School Mile 2 Complex | Ministry of Education | Neeranet Limited | 21,320,896.50 | 22-23/05/2009 | 50% | 12 Weeks |
| 154 | Renovation of a Prototype 17 + 1 A Classrooms Block at Amuwo Odofin Secondary School Mile 2 Complex | Ministry of Education | Neeranet Limited | 21,320,896.50 | 22-23/05/2009 | 50% | 14 Weeks |
| 155 | Renovation of a Prototype 17 + 1 B Classrooms Block at Amuwo Odofin Secondary School Mile 2 Complex | Ministry of Education | Titotex Building Construction | 21,320,896.50 | 22-23/05/2009 | 50% | 12 Weeks |
| 156 | Renovation of a Prototype 17 + 1 C Classrooms Block at Amuwo Odofin Secondary School Mile 2 Complex | Ministry of Education | Titotex Building Construction | 21,320,896.50 | 22-23/05/2009 | 50% | 12 Weeks |
| 157 | Renovation of a Prototype 17 + 1A Classroom Block at Immaculate Heart Senior High School I, Maryland | Ministry of Education | Semiso Nig. Enterprises | 22,428,476.97 | 01/08/2009 | 70% | 12 Weeks |
| 158 | Renovation of a Prototype 17 + 1B Classroom Block at Immaculate Heart Senior High School II, Maryland | Ministry of Education | Havila Construction Ltd | 22,767,101.97 | 01/08/2009 | 70% | 12 Weeks |
| 159 | Renovation of a Prototype 17 + 1A Classroom Block at Immaculate Heart Junior High School I, Maryland | Ministry of Education | Flotel Ventures | 22,428,476.97 | 01/08/2009 | 70% | 12 Weeks |
| 160 | Renovation of a Prototype 17 + 1B Classroom Block at Immaculate Heart Junior High School II, Maryland | Ministry of Education | Royal Kristam Invest. Ltd | 22,428,476.97 | 01/08/2009 | 70% | 16 Weeks |
| 161 | Renovation of a Prototype 17 + 1 Classroom Block at Army Cantonment Boys Secondary School, Ikeja | Ministry of Education | Quesome Ltd | 22,326,889.46 | 01/08/2009 | 70% | 8 Weeks |
| 162 | Renovation of a Prototype 17 + 1 Classroom Block at Kosofe Senior College, Kosofe | Ministry of Education | Mustag Ventures Nig. Ltd | 21,367,451.97 | 01/08/2009 | 70% | 8 Weeks |
| 163 | Renovation of a Prototype 17 + 1 Classroom Block at Yewa Junior High School, Agege | Ministry of Education | Akerele Enterprises | 22,428,476.97 | 01/08/2009 | 70% | 8 Weeks |
| 164 | Renovation of a Prototype 17 + 1 Classroom Block at Government College, Ketu - Epe | Ministry of Education | Akerele Enterprises | 19,531,822.28 | 01/08/2009 | 70% | 14 Weeks |
| 165 | Renovation of a Prototype 17 + 1A Classroom Block at Ogunmodede Senior College (A) Papa Epe | Ministry of Education | Loli - Losien Nig. Enterprises | 22,428,476.97 | 01/08/2009 | 70% | 8 Weeks |
| 166 | Renovation of a Prototype 17 + 1B Classroom Block at Ogunmodede Senior College (B) Papa Epe | Ministry of Education | Loli - Losien Nig. Enterprises | 22,428,476.97 | 01/08/2009 | 70% | 12 weeks |
| 167 | Renovation of a Prototype 17 + 1 Classroom Block at Ogunmodede Junior College, Papa Epe | Ministry of Education | Kolan Logistic Ltd | 21,638,351.97 | 01/08/2009 | 70% | 14 Weeks |
| 168 | Renovation of a Prototype 17 + 1 Classroom Block at Eko Girls Senior Grammar School, Okota | Ministry of Education | Obanla Construction Ltd | 20,669,466.83 | 01/08/2009 | 70% | 12 weeks |
| 169 | Renovation of a Prototype 17 + 1A Classroom Block at Okota Junior High School | Ministry of Education | Obanla Construction Ltd | 20,669,466.83 | 01/08/2009 | 70% | 12 weeks |
| 170 | Renovation of a Prototype 17 + 1A Classroom Block at Okota Senior High School (A) | Ministry of Education | Tot - Lob (West Africa) Ltd | 20,352,796.02 | 01/08/2009 | 70% | 12 weeks |
| 171 | Renovation of a Prototype 17 + 1B Classroom Block at Okota Senior High School (B) | Ministry of Education | Tot - Lob (West Africa) Ltd | 20,669,466.83 | 01/08/2009 | 70% | 12 weeks |
| 172 | Renovation of a Prototype 17 + 1 Classroom Block at Okota Junior Secondary School | Ministry of Education | Troy Construction & Services Nig. Ltd | 20,669,466.83 | 01/08/2009 | 70% | 12 weeks |
| 173 | Renovation of a Prototype 17 + 1A Classroom Block at Okota Senior Secondary School (A) | Ministry of Education | Jenmtek Tech Concept Ltd | 20,669,466.83 | 01/08/2009 | 70% | 12 weeks |
| 174 | Renovation of a Prototype 17 + 1B Classroom Block at Okota Senior Secondary School (B) | Ministry of Education | Euromarque Ltd | 20,669,466.83 | 01/08/2009 | 70% | 12 weeks |
| 175 | Renovation of a Prototype 17 + 1 Classroom Block at Topo Senior Grammar School, Badagry | Ministry of Education | Dolomite Vareen Ventures | 20,251,016.63 | 01/08/2009 | 70% | 12 weeks |
| 176 | Renovation of a Prototype 17 + 1 Classroom Block at Topo Junior Grammar School, Badagry | Ministry of Education | Jopam Agencies Ltd | 20,669,466.83 | 01/08/2009 | 70% | 12 weeks |
| 177 | Renovation of a Prototype 17 + 1A Classroom Block at Iponri Estate Senior High School (A) | Ministry of Education | Mobola Ventures | 20,669,466.83 | 01/08/2009 | 70% | 12 weeks |
| 178 | Renovation of a Prototype 17 + 1B Classroom Block at Iponri Estate Senior High School (B) | Ministry of Education | Alof Ventures | 20,669,466.83 | 01/08/2009 | 70% | 12 weeks |
| 179 | Renovation of a Prototype 17 + 1 Classroom Block at Iponri Estate Junior High School | Ministry of Education | A - Titilola Enterprises | 20,669,466.83 | 01/08/2009 | 70% | 12 weeks |
| 180 | Renovation of a Prototype 17 + 1 Classroom Block at Ansar -Ud-Deen Senior Grammar School, Badagry | Ministry of Education | Loli - Losien Nig. Enterprises | 20,669,466.83 | 01/08/2009 | 70% | 12 weeks |
| 181 | Renovation of a Prototype 17 + 1 Classroom Block at Ansar -Ud-Deen Junior Grammar School, Badagry | Ministry of Education | Windsor Engineering Nig. Ltd | 20,669,466.83 | 01/08/2009 | 70% | 12 weeks |
| 182 | Renovation of a Prototype 17 + 1 Classroom Block at United Christian High School | Ministry of Education | Deteye Concept | 18,784,237.58 | 01/08/2009 | 70% | 12 weeks |
| 183 | Construction of Education Resource Centre, Ojodu Upward Review | Ministry of Education | Tafeco Nigeria Limited | 11,244,284.63 | 01/08/2009 | ||
| 184 | Construction of a Block of 12 Classrooms, 346m Wall Fence, 1 (One) Gate House and a Gate at Maiyegun Community Senior High School - (Review of scope of works) | Ministry of Education | Ade Solade Enterprises | 01/08/2009 | |||
| 185 | Construction of a Block of 12 Classrooms, 204m Wall Fence, 1 (One) Gate, Production of 400 Students Furniture and Supply of 35 Teachers Furniture at Maiyegun Community Junior High School - (Review of scope of works) | Ministry of Education | Ade Solade Enterprises | 01/08/2009 | |||
| 186 | Construction of a Block of 12 Classrooms, 150m Wall Fence, 1 (One) Gate House, 1 (One) Gate and Supply of 300 Students Furniture and Basic Science Laboratory at Olomu Ajah Community Senior High School - (Review of scope of works) | Ministry of Education | Zorad Associates Limited | 01/08/2009 | |||
| 187 | Rehabilitation and upgrading of facilities at the Lagos State Public Service Staff Development Centre (PSSDC), Magodo | Ministry of Establishment & Training | Alek Associates | 286,717,285.00 | 26/2/2009 | 50% | 18 months |
| 188 | Construction of a Three (3) Floor L- Shaped Building Extension at Harvey Road Health Centre | Ministry of Health | Inchscape Architects | 134,114,384.65 | 23/2/2009 | 70% | 12 months |
| 189 | Construction of Highway Accident and Emergency Centre, Lagos - Ibadan Expressway. | Ministry of Health | Deux Projects Limited | 195,000,000.00 | 15/10/2008 | 50% | 8 Months |
| 190 | Rehabilitation of X-Ray Sites at Ten (10) General Hospitals. | Ministry of Health | Deux Projects Limited | 58,000,000.00 | 15/10/2008 | 50% | 12 Months |
| 191 | Supply of Two (2) Anaesthetic Machines and Two (2) Anaesthetic Gas Monitors for the Lagos State University Teaching Hospital (LASUTH). | Ministry of Health | Deux Projects Limited | 37,000,000.00 | 15/10/2008 | 70% | 6 Weeks |
| 192 | Rehabilitation Works at the Lagos State College of Health Technology, Yaba | Ministry of Health | OMTS Limited | 48,000,000.00 | 6-7/03/2009 | 50% | 3 Months |
| 193 | Supply of Ophthalmic Equipment for Seven (7) Designated Secondary Eye Centres (Lagos, Gbagada, Ikorodu, Ajeromi, Epe, Isolo, Orile Agege General Hospitals) and Lagos State University Teaching Hospital (LASUTH) | Ministry of Health | Opetoyemi Medical Supplies Limited | 28,702,000.00 | 6-7/03/2009 | 70% | 5 Weeks |
| 194 | Supply of Laboratory Equipment for Mushin, Alimosho, Ikorodu, Epe, Somolu and Mainland General Hospitals | Ministry of Health | Femisco Global Venture | 58,147,000.00 | 6-7/03/2009 | 70% | 3 Weeks |
| 195 | Supply and Installation of Endoscopy Equipment for Lagos State University Teaching Hospital (LASUTH) | Ministry of Health | Tanit Medical Engineering Limited | 59,076,390.00 | 6-7/03/2009 | 70% | 6 Weeks |
| 196 | Supply of Theatre Equipment for Mushin, Alimosho, Ikorodu, Epe, Somolu and Mainland General Hospital | Ministry of Health | Femisco Global Venture | 37,564,000.00 | 6-7/03/2009 | 70% | 5 Weeks |
| 197 | Supply of Ten (10) Units Penion SP 102 Anaesthetic Machines for Mushin, Alimosho, Epe, Apapa, Somolu, Surulere, Ifako Ijaiye, Badagry and Mainland General Hospitals, Harvey Road Health Centre | Ministry of Health | Prime Technology Medical Venture | 57,576,470.00 | 6-7/03/2009 | 70% | 8 Weeks |
| 198 | Supply of Cardiology Equipment for Lagos State University Teaching Hospital (LASUTH) | Ministry of Health | Kanchis Nigeria Enterprises | 12,004,000.00 | 6-7/03/2009 | 70% | 4 Weeks |
| 199 | Supply and Installation of Ten (10) Units of Sluice Room Equipment and Accessories for LASUTH, Ikorodu, Badagry, Mainland, Apapa, Ajeromi, Lagos Somolu and Mushin General Hospitals and Harvey Road Health Centre | Ministry of Health | Mogbonju Nigeria Limited | 19,500,000.00 | 6-7/03/2009 | 70% | 4 Weeks |
| 200 | Supply and Installation of a 1000KVA Soundproof Caterpillar Generator and 350KVA Generator at the Lagos State University Teaching Hospital (LASUTH) | Ministry of Health | Deux Projects Limited | 85,508,140.85 | 22-23/05/2009 | ||
| 201 | Facility and Technical Management of the Bola Tinubu Health and Diagnostic Centre, LASUTH, Ikeja. | Ministry of Health | Deux Project Limited | 514,128,006.24 | 25/05/2009 | 12 Months | |
| 202 | Rehabilitation of the Lagos State University Teaching Hospital (LASUTH) Facilities and Supply/ Installation of Equipment - Phase I (Upward Review) | Ministry of Health | Deux Project Limited | 772,190,386.04 | 24/06/2009 | ||
| 203 | Construction of Roads, Internal Drainage Network and Parking Facilities at Lagos State University Teaching Hospital (LASUTH) Annex, Gbagada | Ministry of Health | Deux Project Limited | 1,800,000,000.00 | 24/06/2009 | 40% | 12 Months |
| 204 | Supply,Installation and Commissioning of Hospital Equipment (Medical Equipment and Furniture) for the Combined Clinics and Wards at the Lagos State University Teaching Hospital Annex, Gbagada | Ministry of Health | Deux Project Limited | 325,014,912.00 | 06/07/2009 | 70% | |
| 205 | Supply, Installation and Commissioning of Medical Equipment and Furniture for 20 - Bed Highway Emergency Centre at the Toll Gate, Lagos Ibadan Expressway | Ministry of Health | Deux Project Limited | 181,500,000.00 | 6-7/03/2009 | 70% | 6 Weeks |
| 206 | Procurement of Equipment for the Critical Care Unit and Ayinke House, Lagos State University Teaching Hospital (LASUTH) - Upward Review | Ministry of Health | Lordus Medical & Surgical Supplies | 17,017,178.59 | 31/07/2009 | ||
| 207 | Supply of Ten (10) Units of Penion SP 102 Anaesthetic Machines for Mushin, Alimosho, Epe, Apapa, Somolu, Surulere, Ifako-Ijaiye, Badagry and Mainland General Hospitals as well as Harvey Road Health Centre - Upward Review | Ministry of Health | Prime Technologies Medical Ventures Limited | 12,494,093.99 | 31/07/2009 | 70% | 8 weeks |
| 208 | Dismantling of Existing Lifts, Purchase, Installation and Commissioning of Two Bed Lifts for Lagos Island Maternity Hospital | Ministry of Health | Horivac Company Limited | 47,922,938.00 | 30/10/2009 | 60% | 3 Months |
| 209 | Construction of four(4) Storey 110-Bed Maternal and Child Health Complex at Alimosho General Hospital,Alimosho | Ministry of Health | Deux Projects Limited | 637,744,656.03 | 18/11/2009 | 70% | 12 Months |
| 210 | Construction of Lagos State School of Nursing Building at Alimosho General Hospital,Alimosho | Ministry of Health | Deux Projects Limited | 688,041,016.81 | 2/12/2009 | 70% | 12 Months |
| 211 | Construction of four(4) Storey 110-Bed Maternal and Child Health Complex at Eti-Osa General Hospital,Lekki | Ministry of Health | Deux Projects Limited | 761,731,933.44 | 2/12/2009 | 70% | 12 Months |
| 212 | Supply, Installation and Commissioning of Hospital Equipment and Furniture for the Maternal and Child Health Centres in Eti-Osa and Alimosho General Hospitals | Ministry of Health | Deux Projects Limited | 1,183,054,167.00 | 2/12/2009 | 70% | 12 Months |
| 213 | Construction of Industrial Boreholes for Eleven (11) Fire Stations | Ministry of Home Affairs & Culture | Valebs Nigeria Limited | 49,500,000.00 | 6-7/03/2009 | 60% | 90 Days |
| 214 | Supply of ten (10) units of Fire Water Tankers | Ministry of Home Affairs & Culture | Nigeria Motors Industries Limited | 263,847,969.00 | 27/07/2009 | 70% | 8 Weeks |
| 215 | Renovation of Ikeja Fire Service Station | Ministry of Home Affairs & Culture | Timparc Interational Limited | 43,000,000.00 | 01/08/2009 | 40% | 14 Weeks |
| 216 | Renovation of Agege Fire Service Station | Ministry of Home Affairs & Culture | Timparc Interational Limited | 26,000,000.00 | 01/08/2009 | 40% | 14 Weeks |
| 217 | Renovation of Isolo Fire Service Station | Ministry of Home Affairs & Culture | Macdal Ventures Limited | 27,000,000.00 | 01/08/2009 | 40% | 8 Weeks |
| 218 | Renovation of Alausa Fire Service Station | Ministry of Home Affairs & Culture | I. O. Ogundipe Builders Limited | 25,000,000.00 | 01/08/2009 | 40% | 8 Weeks |
| 219 | Provision of Radio Communication Equipment Network for Newly Acquired Green Goddess Fire Fighting Trucks | Ministry of Home Affairs and Culture | Meredith Communications Limited | 18,900,000.00 | 30/10/2009 | 60% | 2 Months |
| 220 | Completion of Igbobo II A Housing Scheme (Fluctuation Claims) | Ministry of Housing | Various Contractors | 87,557,575.00 | 15/10/2008 | ||
| 221 | Provision of Water Treatment Plant at Igbogbo II A Housing Scheme (Variation) | Ministry of Housing | KLMN Nig. Ltd. | 40,443,200.44 | 15/10/2008 | 60% | 3 Months |
| 222 | Landscaping and Beautification of Igbogbo IIA Housing Scheme | Ministry of Housing | Tripple Hay Company Nig. Ltd. | 58,197,458.00 | 15/10/2008 | 60% | 6 Months |
| 223 | Completion of a Block of 8-in-1 Four Bedroom Maisonett at Gbagada IIA Housing Scheme (Block C - MIII-1) (Upward Review) | Ministry of Housing | Montai Nig. Limited | 64,975,124.38 | 24/04/2009 | 40% | 52 Weeks |
| 224 | Completion of a Block of 8-in-1 Four Bedroom Maisonett at Gbagada IIA Housing Scheme (BlockF - MIII-2) (Upward Review) | Ministry of Housing | Architrave Nig. Limited | 74,627,845.75 | 24/04/2009 | 40% | 52 Weeks |
| 225 | Completion of a Block of 8-in-1 Four Bedroom Maisonett at Gbagada IIA Housing Scheme (Block H - MIII-3) (Upward Review) | Ministry of Housing | Lovip Nig. Limited | 97,411,110.18 | 24/04/2009 | 40% | 52 Weeks |
| 226 | Completion of a Block of 8-in-1 Four Bedroom Maisonett at Gbagada IIA Housing Scheme (Block K - MIII-4) (Upward Review) | Ministry of Housing | Southdrift Inv. Limited | 93,929,317.54 | 24/04/2009 | 40% | 52 Weeks |
| 227 | Completion of a Block of 8-in-1 Four Bedroom Maisonett at Gbagada IIA Housing Scheme (Block I - MIII-5) (Upward Review) | Ministry of Housing | Leedayk Int. Nig. Limited | 155,881,024.49 | 24/04/2009 | 40% | 52 Weeks |
| 228 | Completion of a Block of 8-in-1 Four Bedroom Maisonett at Gbagada IIA Housing Scheme (Block J - MIII-6) (Upward Review) | Ministry of Housing | TSAC Limited | 76,547,083.02 | 24/04/2009 | 40% | 52 Weeks |
| 229 | Completion of a Block of 8-in-1 Four Bedroom Maisonett at Gbagada IIA Housing Scheme (Block G - MIII-7) (Upward Review) | Ministry of Housing | Strong Towers Impex Limited | 130,552,719.54 | 24/04/2009 | 40% | 52 Weeks |
| 230 | Completion of a Block of 8-in-1 Four Bedroom Maisonett at Gbagada IIA Housing Scheme (Block E - MIII-8) (Upward Review) | Ministry of Housing | Kots Integrated Services Limited | 129,519,275.40 | 24/04/2009 | 40% | 52 Weeks |
| 231 | Completion of a Block of 8-in-1 Four Bedroom Maisonett at Gbagada IIA Housing Scheme (Block A - MIII-9) (Upward Review) | Ministry of Housing | Bashcaul Civil Engr. Const. Co. Limited | 143,258,877.20 | 24/04/2009 | 40% | 52 Weeks |
| 232 | Completion of a Block of 8-in-1 Four Bedroom Maisonett at Gbagada IIA Housing Scheme (Block B - MIII-10) (Upward Review) | Ministry of Housing | Ados Nig. Limited | 143,258,877.20 | 24/04/2009 | 40% | 52 Weeks |
| 233 | Completion of a Block of 8-in-1 Four Bedroom Maisonett at Gbagada IIA Housing Scheme (Block D - MIII-11) (Upward Review) | Ministry of Housing | David Soga nig. Ent. Limited | 143,258,877.20 | 24/04/2009 | 40% | 52 Weeks |
| 234 | Provision of Landscaping and Horticulture at Gbagada II A Housing Scheme (Upward Review) | Ministry of Housing | Omar-Gardens Flora Co. | 35,193,826.52 | 24/04/2009 | 40% | 52 Weeks |
| 235 | Provision of Roads,Drains and Carpark (Using Interlocking Pavings) at Gbagada II A Housing Scheme (Upward Review) | Ministry of Housing | Josadeg Nig. Limited | 199,182,549.30 | 24/04/2009 | 40% | 52 Weeks |
| 236 | Provision of Water Supply, Treatment Plant and Reticulation at Gbagada II A Housing Scheme (Upward Review) | Ministry of Housing | TSAC Limited | 135,706,975.54 | 24/04/2009 | 40% | 52 Weeks |
| 237 | Provision of External Electrification at Gbagada II A Housing Scheme (Upward Review) | Ministry of Housing | Biswal Tech. Co. Limited | 81,536,385.00 | 24/04/2009 | 40% | 52 Weeks |
| 238 | Redevelopment of No. 13, Remi Olowude Crescent, Park View Estate, Ikoyi | Ministry of Housing | Sageto Limited | 672,712,301.26 | 24/04/2009 | 60% | 18 Months |
| 239 | Redevelopment of Eric Moore Schools, Surulere, Lagos | Ministry of Housing | Moreno - Marinas Lagoon Plc. | 2,223,646,813.07 | 24/04/2009 | 60% | 34 Weeks |
| 240 | Construction of a Block of 8 in 1, 4 Bedroom Maisonnette at Ikeja GRA Scheme I | Ministry of Housing | Bolf Nigeria Limited | 107,339,308.92 | 22-23/05/2009 | 50% | 9 Months |
| 241 | Demolition of Existing Blocks of 8 - in - 1 Maisonnette at Abraham Adesanya Housing Estate, Ajah (Blocks 1, 2, 3, 4, 5, 6, 7, 8, 9, 11 and 12) | Ministry of Housing | Flory Struct - Tech Limited | 52,266,868.21 | 22-23/05/2009 | 60% | 24 Weeks |
| 242 | Demolition of Existing Blocks of 12 - in - 1 Maisonnette at Abraham Adesanya Housing Estate, Ajah (Blocks 1, 2, 3, 6, 10, 11,12, 13, 14 and 15) | Ministry of Housing | Oats Construction Nigeria Limited | 60,970,350.77 | 22-23/05/2009 | 60% | 24 Weeks |
| 243 | Demolition of Existing Blocks of 8 - in - 1 Flats at Abraham Adesanya Housing Estate, Ajah (Blocks 27, 28, 29, 30, 37, 40, 46, 47, 57, 63, 69, 77, 82, 85, 89, 90, 91 and One Unnumbered) | Ministry of Housing | Moreno - Marinas Lagoon Plc | 152,519,192.88 | 22-23/05/2009 | 60% | 24 Weeks |
| 244 | Demolition of Existing Blocks of 8 - in - 1 Flats at Abraham Adesanya Housing Estate, Ajah (Blocks 31, 35, 42, 56, 57, 58, 59, 60, 61, 62, 64, 65, 66, 67, 68, 70 and 73) | Ministry of Housing | Eko Akete Engineering Construction Limited | 63,721,041.56 | 22-23/05/2009 | 60% | 24 Weeks |
| 245 | Demolition of Existing Blocks of 8 - in - 1 Flats at Abraham Adesanya Housing Estate, Ajah (Blocks 36, 38, 39, 43, 71, 74, 75, 76, 79, 80, 86 and 87) | Ministry of Housing | Pier - Point W. A Limited | 66,770,209.19 | 22-23/05/2009 | 60% | 24 Weeks |
| 246 | Provision of Water Supply, Treatment Plant and Reticulation at Odoragunshin Housing Scheme, Epe - (Reduction in Scope of Works/ Contract sum) | Ministry of Housing | Rekele Limited | 24/06/2009 | |||
| 247 | Renovation of the Office Block of the Ministry of Housing | Ministry of Housing | Bid Resources Nigeria Limited | 61,337,010.70 | 01/08/2009 | 60% | 10 Weeks |
| 248 | Renovation of Block of 32 - in - 1 Room and Parlour with External Works (Block 46) and Block of 16 - in - 1 Two Bedroom Flats with External Works (Blocks 57 and 60) at Amuwo Odofin Housing Estate | Ministry of Housing | Catco Nigeria Company | 11,101,722.70 | 01/08/2009 | 60% | 10 Weeks |
| 249 | Renovation of Block of 16 - in - 1 Two Bedroom Flats Main Building only (Blocks 57 and 60) and Block of 8 - in - 1 Three Bedroom Flats Main Building only (Blocks 4 and 5) at Amuwo Odofin Housing Estate | Ministry of Housing | B. Kola Abanikanda & Sons | 14,817,854.13 | 01/08/2009 | 60% | 10 Weeks |
| 250 | Renovation of Block of 8 - in - 1 Three Bedroom Flats Main Building Only (Block 6) and Block of 8 - in - 1 Three Bedroom Flats Main Building (Blocks 4, 5 and 6) at Amuwo Odofin Housing Estate | Ministry of Housing | Herizon Nigeria Limited | 12,998,018.43 | 01/08/2009 | 60% | 10 Weeks |
| 251 | Renovation of the Main Building of 32 - in - 1 Room and Parlour (Blocks 45, 48, 49 and 51) at Amuwo Odofin Housing Estate | Ministry of Housing | Bofewa Ventures | 14,301,212.15 | 01/08/2009 | 60% | 10 Weeks |
| 252 | Renovation of the Main Building of 32 - in - 1 Room and Parlour (Blocks 52, 54, 56 and 58) at Amuwo Odofin Housing Estate | Ministry of Housing | Hamdalat Enterprises Limited | 14,301,212.15 | 01/08/2009 | 60% | 10 Weeks |
| 253 | Renovation of the Main Building of 32 - in - 1 Room and Parlour (Blocks 59 and 61) and the Main Building for 32 - in - 1 Room and Parlour (Block 43) at Amuwo Odofin Housing Estate | Ministry of Housing | Golden Times Ventures Nigeria Limited | 11,021,646.47 | 01/08/2009 | 60% | 10 Weeks |
| 254 | Renovation of the Main Building of 16 - in - 1 Two Bedroom Flats (Blocks 23, 24, 25, 26, 27 and 28) at Amuwo Odofin Housing Estate | Ministry of Housing | De - Hartz Limited | 16,821,262.83 | 01/08/2009 | 60% | 10 Weeks |
| 255 | Renovation of the Main Building of 16 - in - 1 Two Bedroom Flats (Blocks 29, 30, 31, 32, 33 and 34) at Amuwo Odofin Housing Estate | Ministry of Housing | Lob Engineering & Construction Company Limited | 16,821,262.83 | 01/08/2009 | 60% | 10 Weeks |
| 256 | Renovation of the Main Building of 16 - in - 1 Two Bedroom Flats (Blocks 35, 36, 37, 38, 39 and 40) at Amuwo Odofin Housing Estate | Ministry of Housing | Samflor Ventures Nigeria Limited | 16,821,262.83 | 01/08/2009 | 60% | 10 Weeks |
| 257 | Renovation of the Main Building of 16 - in - 1 Two Bedroom Flats (Blocks 41, 42, 43, 44, 50, 53 and 55) at Amuwo Odofin Housing Estate | Ministry of Housing | Rajaf Construction Nigeria Limited | 16,821,262.83 | 01/08/2009 | 60% | 10 Weeks |
| 258 | Renovation of the Main Building of 8 - in - 1 Three Bedroom Flats (Blocks 1, 2, 3 and 7) at Amuwo Odofin Housing Estate | Ministry of Housing | Arem Global Ventures | 18,421,533.03 | 01/08/2009 | 60% | 10 Weeks |
| 259 | Renovation of the Main Building of 8 - in - 1 Three Bedroom Flats (Blocks 8, 9, 10 and 11) at Amuwo Odofin Housing Estate | Ministry of Housing | Gafundo Ventures Limited | 18,421,533.03 | 01/08/2009 | 60% | 10 Weeks |
| 260 | Renovation of the Main Building of 8 - in - 1 Three Bedroom Flats (Blocks 12, 13, 14 and 15) at Amuwo Odofin Housing Estate | Ministry of Housing | Kormayo Enterprises | 18,421,533.03 | 01/08/2009 | 60% | 10 Weeks |
| 261 | Renovation of the Main Building of 8 - in - 1 Three Bedroom Flats (Blocks 16, 17, 18 and 19) at Amuwo Odofin Housing Estate | Ministry of Housing | Kemadson Ventures | 18,421,533.03 | 01/08/2009 | 60% | 10 Weeks |
| 262 | Renovation of the Main Building of 8 - in - 1 Three Bedroom Flats (Blocks 20, 21, and 22) at Amuwo Odofin Housing Estate | Ministry of Housing | Dexson Nigeria Limited | 13,816,149.78 | 01/08/2009 | 60% | 10 Weeks |
| 263 | Sandfilling of Iba New Town, Iba | Ministry of Housing | Van Oord Nig Ltd | 6,370,000,000.00 | 04/9/2009 | 30% | 55 weeks |
| 264 | Construction of three (3) Blocks of 2-in-1 two Bedroom Bungalow at Odoragunshi Housing, Scheme, Epe | Ministry of Housing | Extreme Intergrated Ventures | 28,895,804.49 | 04/9/2009 | 60% | 24 Weeks |
| 265 | Construction of 2-in-1, Two Bedroom Bungalow and Estate Office at Odoragunshin Housing Scheme(substitution of contractor) | Ministry of Housing | Dabeeb Estate Limited | 15,590,587.02 | 30/10/2009 | 60% | 24 Weeks |
| 266 | Construction of Permanent Site of the Lagos State Records and Archives Bureau at PSSDC, Magodo Additional Works | Ministry of Information | Bat-Richy Nig. Limited | 95,495,619.45 | 22-23/05/2009 | 50% | 2 Months |
| 267 | Supply of Outside Broadcasting Van for Radio Lagos / Eko FM | Ministry of Information | ETC Corporate and Media Concepts | 127,081,500.00 | 31/07/2009 | 50% | 6 Months |
| 268 | (a) Procurement of Stenographic Court Equipment and Training of Verbatim Court Reporters Phase II | Ministry of Justice | Equality Foundation | 299,291,685.00 | 7/05/2009 | 70% | 12 Months |
| 269 | Replacement of Woodwork and Courtroom Furniture at Ikeja High Court | Ministry of Justice | Integrated Projects | 450,000,000.00 | 04/06/2009 | 50% | 5 Months |
| 270 | Establishment of Crime Data Bureau and Register (Year 1) | Ministry of Justice | Data Express Limited | 295,494,500.00 | 24/06/2009 | 70% | 12 Months |
| 271 | Construction of New Magistrate Court Building at Igando, Alimosho Local Government | Ministry of Justice | Newport Development Limited | 950,000,000.00 | 24/06/2009 | 50% | 12 Months |
| 272 | Construction of Prototype Magistrate Court, Ogba (Additional Works) | Ministry of Justice | Cubic Homes Limited | 115,000,000.00 | 31/07/2009 | 50% | 5 Months |
| 273 | Construction of New Magistrate Court at Igbosere (Additional Works) | Ministry of Justice | Ershaw Nig. Limited | 93,581,210.70 | 31/07/2009 | 50% | 3 Months |
| 274 | Construction of Federal High Court/Office Complex, Ikeja | Ministry of Justice | Brick Form Nigeria Limited | 61,790,924.21 | 01/08/2009 | 70% | 30 days |
| 275 | Provision of Court Furniture for the Igbosere Magistrate Court Complex, Lagos | Ministry of Justice | The Chair Centre Ltd | 123,642,973.57 | 04/9/2009 | 70% | 10 Weeks |
| 276 | Rehabilitation of the Lagos and Ikeja Chambers of the Honourable Chief Judge of Lagos State | Ministry of Justice | Numbers Limited | 90,000,000.00 | 30/10/2009 | 60% | 2 Months |
| 277 | Construction of Combined High/ Magistrate Court at Ikorodu (Additional Works) | Ministry of Justice/ Office of Works | Barrows Construction Limited | 34,815,541.79 | 24/11/2009 | ||
| 278 | Construction of a 4 - Bedroom Detached Building at Badagry (Block A) | Ministry of Justice/ Office of Works | Rak Kunle Nigeria Limited | 92,000,000.00 | 24/11/2009 | 40% | 6 Months |
| 279 | Construction of a 4 - Bedroom Detached Building at Badagry (Block B) | Ministry of Justice/ Office of Works | Numbers Limited | 92,000,000.00 | 24/11/2009 | 40% | 6 Months |
| 280 | Rehabilitation of existing Micro Water Works at Ilasan in Eti-Osa LGA | Ministry of Rural Development | Tolubash Ent. (Nig) Ltd | 19,990,000.00 | 31/3/2009 | 60% | 9 weeks |
| 281 | Rehabilitation of existing Micro Water Works at Baiyeku in Ikorodu LGA | Ministry of Rural Development | Royal Maneda Productions Ltd | 19,040,000.00 | 31/3/2009 | 60% | 8 weeks |
| 282 | Rehabilitation of existing Micro Water Works at Ilogbo Eremi LGA | Ministry of Rural Development | Laibola Link Intl. Ltd | 18,090,000.00 | 31/3/2009 | 60% | 8 weeks |
| 283 | Rehabilitation of existing Micro Water Works at Itoikin in Epe LGA | Ministry of Rural Development | Ibrao Companies Ltd | 21,670,000.00 | 31/3/2009 | 60% | 8 weeks |
| 284 | Rehabilitation of existing Micro Water Works at Sekungba in Epe LGA | Ministry of Rural Development | Reprotrain Nig. Ltd | 21,670,000.00 | 31/3/2009 | 60% | 8 weeks |
| 285 | Rehabilitation of existing Micro Water Works at Seme in Badagry LGA | Ministry of Rural Development | Reprotrain Nig. Ltd | 18,590,000.00 | 31/3/2009 | 60% | 8 weeks |
| 286 | Construction of Shamsi Jaiyesimi Street in Ikorodu LGA | Ministry of Rural Development | Frank Comet | 226,625,239.31 | 31/3/2009 | 60% | 6 Months |
| 287 | Construction of reinforced concrete drains on Irewunmi Adebanjo str. to discharge Shamsi Jaiyesinmi Str. & Erogbogbo Str in Ikorodu LGA | Ministry of Rural Development | Reprotrain Nig. Ltd | 35,185,432.80 | 31/3/2009 | 60% | 3 Months |
| 288 | Construction of Igbodu Road, Epe LGA | Ministry of Rural Development | Reprotrain Nig. Ltd | 36,846,628.89 | 31/3/2009 | 60% | 3 Months |
| 289 | Construction of reinforced concrete water jetty at Igbologun in Ojo LGA | Ministry of Rural Development | Frank Comet | 55,112,106.25 | 31/3/2009 | 60% | 4 Months |
| 290 | Rural Electrification of Ogungbayi Community in Alimosho LGA | Ministry of Rural Development | Benchmark Enterprises | 11,193,177.65 | 31/3/2009 | 60% | 12 Weeks |
| 291 | Rural Electrification of Iyesi Gumajayi CDA, Olorunda, Badagry LGA | Ministry of Rural Development | Frank Comet | 18,773,413.65 | 31/3/2009 | 60% | 12 Weeks |
| 292 | Rural Electrification of Iledu CDA, Olorunda, Badagry LGA | Ministry of Rural Development | Frank Comet | 16,085,468.05 | 31/3/2009 | 60% | 12 Weeks |
| 293 | Rural Electrification of Povita CDA, Topo, Badagry LGA | Ministry of Rural Development | Kajoson Nigeria Company | 11,766,585.55 | 31/3/2009 | 60% | 12 Weeks |
| 294 | Rural Electrification of Promiseland CDA, Ayobo Ipaja, Alimosho LGA | Ministry of Rural Development | Biseta Nig. Ltd. | 12,413,344.67 | 31/3/2009 | 60% | 12 Weeks |
| 295 | Rural Electrification of Ibowon CDA, Eredo, Epe LGA | Ministry of Rural Development | Andre Ventures Ltd | 12,230,780.04 | 31/3/2009 | 60% | 12 Weeks |
| 296 | Rural Electrification of Ikorodu GRA Odo-Nla, Ikorodu LGA | Ministry of Rural Development | Iyasuna Power Engineers /nig. Ltd | 17,114,425.38 | 31/3/2009 | 60% | 12 Weeks |
| 297 | Rural Electrification of Mosafejo CDA, Agbowa Ikosi, Epe LGA | Ministry of Rural Development | Folaba Enterprises | 11,389,134.14 | 31/3/2009 | 60% | 12 Weeks |
| 298 | Rural Electrification of Ifedapo CDA, Ibeshe, Ikorodu LGA | Ministry of Rural Development | Tunjobi Enterprises | 10,146,444.85 | 31/3/2009 | 60% | 12 Weeks |
| 299 | Construction of Electric Tower from Iyagbe to Okolundu town in Ojo LGA | Ministry of Rural Development | Frank Comet | 75,000,000.00 | 31/3/2009 | 60% | 12 Weeks |
| 300 | Provision/ Construction of 1 Nos. Power Transformer at 242 Military Ibereko, Badagry LGA | Ministry of Rural Development | Frank Comet | 37,500,000.00 | 31/3/2009 | 60% | 12 Weeks |
| 301 | Television documentary on Rural Development and Community Development Association (CDA's) in Lagos State. | Ministry of Rural Development | Digitrack Nig. Ltd | 23,831,500.00 | 31/3/2009 | 60% | 3 Months |
| 302 | Construction of Reinforced Concrete Water Jetties (Off - Shore) in Emina - Saga, Epe Local Government Area | Ministry of Rural Development | Bosa Nigeria Limited | 62,649,320.67 | 22-23/05/2009 | 50% | 6 Months |
| 303 | Construction of Reinforced Concrete Water Jetties (Off - Shore) in Abomiti - Nla, Epe Local Government Area | Ministry of Rural Development | Pee - Dee Nigeria Company | 62,649,320.67 | 22-23/05/2009 | 50% | 6 Months |
| 304 | Construction of Reinforced Concrete Water Jetties (Off - Shore) in Ejinrin Town, Agbowa/ Ikosi LCDA | Ministry of Rural Development | Conswealth Nigeria Limited | 62,995,380.00 | 22-23/05/2009 | 50% | 6 Months |
| 305 | Construction of Reinforced Concrete Water Jetties (Off - Shore) in Oju - Agemo, Imota LCDA | Ministry of Rural Development | MGFL Nigeria Limited | 62,995,380.00 | 22-23/05/2009 | 50% | 6 Months |
| 306 | Construction of Reinforced Concrete Water Jetties (Off - Shore) in Saghokoji, Amuwo - Odofin Local Government Area | Ministry of Rural Development | Global Trading Nigeria Limited | 62,649,320.67 | 22-23/05/2009 | 50% | 6 Months |
| 307 | Construction of Reinforced Concrete Water Jetties (Off - Shore) in Oke - Agbo, Oto - Awori LCDA | Ministry of Rural Development | Reva International Limited | 62,995,380.00 | 22-23/05/2009 | 50% | 6 Months |
| 308 | Construction of Reinforced Concrete Water Jetties (Off - Shore) in Okun - Kobo, Ojo Local Government Area | Ministry of Rural Development | Labi Enterprises | 62,649,320.67 | 22-23/05/2009 | 50% | 6 Months |
| 309 | Construction of Reinforced Concrete Water Jetties (Off - Shore) in Itogbosa, Ojo Local Government Area | Ministry of Rural Development | Rehob Consult | 62,649,320.67 | 22-23/05/2009 | 50% | 6 Months |
| 310 | Construction of Reinforced Concrete Water Jetties (Off - Shore) in Ibeshe Beach, Ori - Ade LCDA | Ministry of Rural Development | Adbaaf Nigeria Limited | 62,649,320.67 | 22-23/05/2009 | 50% | 6 Months |
| 311 | Construction of Reinforced Concrete Water Jetties (Off - Shore) in Igbogbele, Badagry West LCDA | Ministry of Rural Development | Mesot Ventures | 62,995,380.00 | 22-23/05/2009 | 50% | 6 Months |
| 312 | Construction of Reinforced Concrete Water Jetties (Off - Shore) in Pashi, Badagry West LCDA | Ministry of Rural Development | Encon International Limited | 62,995,380.00 | 22-23/05/2009 | 50% | 6 Months |
| 313 | Construction of Reinforced Concrete Water Jetties (Off - Shore) in Ijede Town, Ijede LCDA | Ministry of Rural Development | Deolat Enterprises | 62,995,380.00 | 22-23/05/2009 | 50% | 6 Months |
| 314 | Provision of Solar Powered Traffic Lights | Ministry of Science & Technology | Rubitec Nigeria Limited | 44,202,375.00 | 22-23/05/2009 | 70% | 8 Weeks |
| 315 | Provision of Equipment, Furnishing and Operation of the Lagos State Central command Centre | Ministry of Science & Technology | Contact Solutions Ltd | 328,362,417.00 | 10/06/2009 | 70% | 3 Months |
| 316 | Provision of Technical Support and Management of the Lagos State Central command Centre | Ministry of Science & Technology | Contact Solutions Ltd | 161,833,818.00 | 10/06/2009 | 6 Months | |
| 317 | Development of Tourism in Badagry (Phase I) | Ministry of Tourism & Inter - Governmental Relations | Sageto Limited | 1,071,222,699.86 | 30/10/2009 | 50% | 32 Weeks |
| 318 | Maintenance of Road Infrastructure at Okunde Bluewater Scheme, Lekki | Ministry of Waterfront Infrastructure Development | Arab Contractor O.A.O Nigeria Limited | 100,000,000.00 | 16/04/2009 | 50% | 4 Weeks |
| 319 | Electrification of Okunde Bluewater Scheme, Lekki | Ministry of Waterfront Infrastructure Development | Mercilia Electromech Limited | 151,213,564.00 | 7/05/2009 | 70% | 6 Weeks |
| 320 | Removal of two Abandoned Vessels at Okunde Blue Water Scheme, Lekki | Ministry of Waterfront Infrastructure Development | AMS BP Joint Venture | 235,000,000.00 | 04/9/2009 | 60% | 10 Weeks |
| 321 | Provision of Complimentary Infrastructure (Sewage/ Water) at Okunde Blue Water Scheme, Lekki | Ministry of Waterfront Infrastructure Development | Mamub Limited | 393,000,000.00 | 30/10/2009 | 60% | 6 Months |
| 322 | Construction of Lagos State International Arbitration Centre at Okunde Blue Water Scheme, Lekki (Phase IIA) | Ministry of Waterfront Infrastructure Development | Moreno Marinas Lagoon Plc. | 599,552,580.35 | 30/10/2009 | 60% | 4 Months |
| 323 | Provision of Infrastructure at the Waterfront of Oyinkan Abayomi Drive, Ikoyi (Phase I | Ministry of Waterfront Infrastructure Development | Kahrrl Tech. Engineering and Associates Limited | 750,000,000.00 | 3/11/2009 | 60% | 12 Months |
| 324 | Remodeling and Upgrading of Isheri Rehabilitation and Vocational Training Centre | Ministry of Women Affairs & Poverty Alleviation | Deux Projects Limited | 1,018,594,719.86 | 31/07/2009 | 50% | 9 Months |
| 325 | Remodeling and Upgrading of Isheri Rehabilitation and Vocational Training Centre (Phase IIB) | Ministry of Women Affairs and Poverty Alleviation | Deux Project Limited | 543,061,124.10 | 30/10/2009 | 50% | 9 Months |
| 326 | Renovation of Boys Remand Homes, Oregun | Ministry of Youth, Sports & Social Development | Buena Fortuna Nigeria Limited | 21,052,313.10 | 6-7/03/2009 | 50% | 4 Months |
| 327 | Reconstruction of Amuto Playground, Lagos Island | Ministry of Youth, Sports & Social Development | Double R International Enterprises Group Limited | 60,000,000.00 | 6-7/03/2009 | 50% | 4 Months |
| 328 | Construction of Youth Centres at Ipakan Ijede | Ministry of Youth, Sports & Social Development | Labiba Nigeria Enterprises | 93,000,000.00 | 22-23/05/2009 | 40% | 18 Weeks |
| 329 | Construction of Youth Centres and Provision of Recreational Vocational and Sporting Facilities in Apapa Iganmu | Ministry of Youth, Sports & Social Development | Jonika Nigeria Limited | 93,000,000.00 | 22-23/05/2009 | 50% | 18 Weeks |
| 330 | Construction of Family Court and Social Welfare Office, Yaba | Ministry of Youth, Sports & Social Development | Bistito International Services Limited | 80,000,000.00 | 22-23/05/2009 | 50% | 20 Weeks |
| 331 | Construction of Perimeter Fence, Painting, Security Post, Gate House etc. at Ilupeju Play Ground | Ministry of Youth, Sports & Social Development | Bistito International Services Limited | 17,000,000.00 | 01/08/2009 | 40% | 12 Weeks |
| 332 | Construction of Additional Building and Renovation of Existing Buildings at the Boys Approved School, Birrel, Yaba - Phase I and II | Ministry of Youth, Sports & Social Development | Double R. International Enterprises Group Limited | 201,500,000.00 | 01/08/2009 | 30% | 6 Months |
| 333 | Upgrading of Teslim Balogun Stadium, Surulere (Additional Works) Phases II, III and IV | Ministry of Youth, Sports & Social Development | Deux Projects Limited | 1,910,990,000.00 | 15/10/2009 | 100% | |
| 334 | Renovation of Teslim Balogun Stadium Hostel, Surulere | Ministry of Youth, Sports and Social Development | Jidsma Nigeria Limited | 60,000,000.00 | 15/10/2009 | 40% | 8 Weeks |
| 335 | Renovation of Girls Remand Home, Idi - Araba | Ministry of Youth, Sports and Social Development | Heighest Ventures Limited | 35,000,000.00 | 30/10/2009 | 50% | 12 Weeks |
| 336 | Construction/ Renovation of Vocational Rehabilitation Centre for the Disabled, Owutu, Ikorodu | Ministry of Youth, Sports and Social Development | Distinct Concept Investment Limited | 136,000,000.00 | 30/10/2009 | 50% | 16 Weeks |
| 337 | Purchase of Consumables for the Production of Riders Card | Motor Vehicle Administration Agency | Kobel Limited | 20,002,000.00 | 30/10/2009 | 70% | 6 Weeks |
| 338 | Construction of Road Nos. 9E, 9F and 9J at Lekki Peninsula Scheme I | NTDA | Edgecube Integrated Services Ltd. | 261,620,361.46 | 30/10/2009 | 30% | 16 Weeks |
| 339 | Construction of Road No. 9K at Lekki Peninsula Scheme I | NTDA | Weyland Intergrated Services Limited | 64,547,093.28 | 30/10/2009 | 30% | 16 Weeks |
| 340 | Construction of Road No. 15B at Lekki Peninsula Scheme I | NTDA | Tolgbam Limited | 64,547,093.28 | 30/10/2009 | 30% | 16 Weeks |
| 341 | Construction of Road No. 22B at Lekki Peninsula Scheme I | NTDA | Tranards Nigeria Ltd. | 49,433,764.14 | 30/10/2009 | 30% | 16 Weeks |
| 342 | Construction of Road No. 28B at Lekki Peninsula Scheme I | NTDA | Bobfot Limited | 104,093,714.02 | 30/10/2009 | 30% | 16 Weeks |
| 343 | Construction of Road No. 35 (Part of ) at Lekki Peninsula Scheme I | NTDA | Kyle Next Limited | 83,331,496.68 | 30/10/2009 | 30% | 16 Weeks |
| 344 | Construction of Road No. 44B at Lekki Peninsula Scheme I | NTDA | Height Heritage | 39,812,156.75 | 30/10/2009 | 30% | 16 Weeks |
| 345 | Construction of Road No. 61A at Lekki Peninsula Scheme I | NTDA | Segadel Integrated Services Limited | 71,313,595.22 | 30/10/2009 | 30% | 16 Weeks |
| 346 | Construction of Road No. 82 at Lekki Peninsula Scheme I | NTDA | Samfadeen Enterprises | 39,812,156.75 | 30/10/2009 | 30% | 16 Weeks |
| 347 | Construction of Road No. 82B at Lekki Peninsula Scheme I | NTDA | Photo Identification Nigeria Limited | 24,605,097.80 | 30/10/2009 | 30% | 16 Weeks |
| 348 | Construction of Road No. 78D at Lekki Peninsula Scheme I | NTDA | Weyland Intergrated Services Limited | 75,123,936.37 | 30/10/2009 | 30% | 16 Weeks |
| 349 | Construction of Road No.4 at Lekki Peninsula Scheme II | NTDA | CCECC Nigeria Limited | 168,763,054.52 | 6-7/03/2009 | 30% | 16 Weeks |
| 350 | Construction of Road No.41 at Lekki Peninsula Scheme II | NTDA | CCECC Nigeria Limited | 103,202,570.24 | 6-7/03/2009 | 30% | 16 Weeks |
| 351 | Construction of Road No.42 at Lekki Peninsula Scheme II | NTDA | CCECC Nigeria Limited | 124,993,781.55 | 6-7/03/2009 | 30% | 16 Weeks |
| 352 | Construction of Road No.100 at Lekki Peninsula Scheme II | NTDA | CCECC Nigeria Limited | 230,142,026.29 | 6-7/03/2009 | 30% | 20 Weeks |
| 353 | Construction of Road No.101 at Lekki Peninsula Scheme II | NTDA | CCECC Nigeria Limited | 359,604,167.34 | 6-7/03/2009 | 30% | 28 Weeks |
| 354 | Construction of Road No.102 at Lekki Peninsula Scheme II | NTDA | CCECC Nigeria Limited | 222,888,861.64 | 6-7/03/2009 | 30% | 20 Weeks |
| 355 | Construction of Road No.103 at Lekki Peninsula Scheme II | NTDA | CCECC Nigeria Limited | 282,113,861.76 | 6-7/03/2009 | 30% | 24 Weeks |
| 356 | Construction of Road No.105 at Lekki Peninsula Scheme II | NTDA | CCECC Nigeria Limited | 87,032,490.93 | 6-7/03/2009 | 30% | 20 Weeks |
| 357 | Construction of Road No.106 at Lekki Peninsula Scheme II | NTDA | CCECC Nigeria Limited | 176,926,930.60 | 6-7/03/2009 | 30% | 16 Weeks |
| 358 | Construction of Road No.120 at Lekki Peninsula Scheme II | NTDA | Yob Nigeria Limited | 101,138,120.35 | 6-7/03/2009 | 30% | 20 Weeks |
| 359 | Construction of Road No.121 at Lekki Peninsula Scheme II | NTDA | Ayeola Construction Company | 63,496,829.83 | 6-7/03/2009 | 30% | 20 Weeks |
| 360 | Construction of Road No.122 at Lekki Peninsula Scheme II | NTDA | Alybak Commercial Enterprises | 62,231,314.48 | 6-7/03/2009 | 30% | 20 Weeks |
| 361 | Construction of Road No.12 at Abijo G.R.A. Scheme | NTDA | Wetland Construction Nigeria Limited | 103,376,648.71 | 6-7/03/2009 | 30% | 17 Weeks |
| 362 | Construction of Road No.33 (Part of) at Abijo G.R.A. Scheme | NTDA | Olawale Bakare Commercial Enterprises | 72,819,024.80 | 6-7/03/2009 | 30% | 32 Weeks |
| 363 | Construction of Road No.34 at Abijo G.R.A. Scheme | NTDA | Labus & Sons Enterprises | 77,017,390.40 | 6-7/03/2009 | 30% | 32 Weeks |
| 364 | Construction of Road No.35 at Abijo G.R.A. Scheme | NTDA | Oakstel Global Limited | 49,806,912.82 | 6-7/03/2009 | 30% | 12 Weeks |
| 365 | Construction of Road No.36 at Abijo G.R.A. Scheme | NTDA | Fowus Nigeria Limited | 89,091,166.40 | 6-7/03/2009 | 30% | 16 Weeks |
| 366 | Construction of Road No.39 at Abijo G.R.A. Scheme | NTDA | Blesswyde Ventures Limited | 50,414,651.38 | 6-7/03/2009 | 30% | 16 Weeks |
| 367 | Construction of Road No.51 at Abijo G.R.A. Scheme | NTDA | Kudwin Investment Limited | 100,250,086.75 | 6-7/03/2009 | 30% | 16 Weeks |
| 368 | Construction of Roads Nos. 3 (Part of) and 4 (Part of) at Ipaja New Town Scheme (Variation) | NTDA | Alpha & Gold International Limited | 26,636,960.00 | 6-7/03/2009 | 30% | 4 Months |
| 369 | Construction of Road No.9A at Lekki Peninsula Scheme I | NTDA | H.A. Funlayo & Sons Limited | 82,373,400.00 | 6-7/03/2009 | 30% | 16 Weeks |
| 370 | Construction of Road No.10A at Lekki Peninsula Scheme I | NTDA | Jaseal Construction Limited | 84,506,795.00 | 6-7/03/2009 | 30% | 16 Weeks |
| 371 | Construction of Road No.11 at Lekki Peninsula Scheme I (Wole Ariyo) | NTDA | H.A. Funlayo & Sons Limited | 38,655,996.17 | 6-7/03/2009 | 30% | 16 Weeks |
| 372 | Construction of Road No.11A at Lekki Peninsula Scheme I | NTDA | Jaseal Construction Limited | 28,194,433.47 | 6-7/03/2009 | 30% | 16 Weeks |
| 373 | Construction of Road No.15A at Lekki Peninsula Scheme I | NTDA | Kudwin Investment Limited | 89,392,137.40 | 6-7/03/2009 | 30% | 16 Weeks |
| 374 | Construction of Road No.15C at Lekki Peninsula Scheme I | NTDA | Blesswyde Ventures Limited | 64,428,768.09 | 6-7/03/2009 | 30% | 16 Weeks |
| 375 | Construction of Road No.19 at Lekki Peninsula Scheme I | NTDA | Wetland Construction Nigeria Limited | 95,194,033.55 | 6-7/03/2009 | 30% | 16 Weeks |
| 376 | Construction of Road No.19A at Lekki Peninsula Scheme I | NTDA | Blesswyde Ventures Limited | 36,113,576.62 | 6-7/03/2009 | 30% | 16 Weeks |
| 377 | Construction of Road No.19B at Lekki Peninsula Scheme I | NTDA | Elizabeth Mita & Sons Enterprises | 60,023,851.09 | 6-7/03/2009 | 30% | 16 Weeks |
| 378 | Construction of Road No.21 at Lekki Peninsula Scheme I | NTDA | Alybak Commercial Enterprises | 51,574,133.93 | 6-7/03/2009 | 30% | 16 Weeks |
| 379 | Construction of Road No.26A/53A at Lekki Peninsula Scheme I | NTDA | Molake Enterprises Limited | 85,315,206.24 | 6-7/03/2009 | 30% | 16 Weeks |
| 380 | Construction of Road No.26B at Lekki Peninsula Scheme I | NTDA | Molake Enterprises Limited | 103,703,919.55 | 6-7/03/2009 | 30% | 16 Weeks |
| 381 | Construction of Road No.26D at Lekki Peninsula Scheme I | NTDA | Bal Builders Nig. Ltd. | 29,982,263.47 | 6-7/03/2009 | 30% | 16 Weeks |
| 382 | Construction of Road No.27 at Lekki Peninsula Scheme I(Theophilus Orji) | NTDA | Bal Builders Nig. Ltd. | 62,515,010.09 | 6-7/03/2009 | 30% | 16 Weeks |
| 383 | Construction of Road No.28 at Lekki Peninsula Scheme I(Abike Sulaiman) | NTDA | M3 Intercontinental Limited | 113,455,855.21 | 6-7/03/2009 | 30% | 16 Weeks |
| 384 | Construction of Road No.31 at Lekki Peninsula Scheme I(Abayomi Shonuga) | NTDA | M3 Intercontinental Limited | 160,570,089.63 | 6-7/03/2009 | 30% | 16 Weeks |
| 385 | Construction of Road No.41 at Lekki Peninsula Scheme I | NTDA | Yob Nigeria Limited | 75,503,734.24 | 6-7/03/2009 | 30% | 16 Weeks |
| 386 | Construction of Road No.53/54 at Lekki Peninsula Scheme I | NTDA | Consteng Limited | 117,881,843.86 | 6-7/03/2009 | 30% | 16 Weeks |
| 387 | Construction of Road No.55 at Lekki Peninsula Scheme I | NTDA | Consteng Limited | 225,851,321.41 | 6-7/03/2009 | 30% | 16 Weeks |
| 388 | Construction of Road No.65 at Lekki Peninsula Scheme I | NTDA | Manal Nigeria Limited | 81,513,596.40 | 6-7/03/2009 | 30% | 16 Weeks |
| 389 | Construction of Road No.67 at Lekki Peninsula Scheme I | NTDA | Jisaco Nigeria Limited | 149,082,137.33 | 6-7/03/2009 | 30% | 16 Weeks |
| 390 | Construction of Road No.68 at Lekki Peninsula Scheme I | NTDA | Alpha Mega Nigeria Limited | 37,214,677.78 | 6-7/03/2009 | 30% | 16 Weeks |
| 391 | Construction of Road No.70B at Lekki Peninsula Scheme I(Aare Adedeji) | NTDA | Rehoboth Construction Nigeria Limited | 51,391,115.93 | 6-7/03/2009 | 30% | 16 Weeks |
| 392 | Construction of Road No.71A at Lekki Peninsula Scheme I | NTDA | Shengli Land Global Nigeria Limited | 30,364,151.62 | 6-7/03/2009 | 30% | 16 Weeks |
| 393 | Construction of Road No.72 at Lekki Peninsula Scheme I | NTDA | Plycon Nigeria Limited | 121,912,836.71 | 6-7/03/2009 | 30% | 16 Weeks |
| 394 | Construction of Road No.74 at Lekki Peninsula Scheme I | NTDA | Plycon Nigeria Limited | 118,224,591.71 | 6-7/03/2009 | 30% | 16 Weeks |
| 395 | Construction of Road No.76A at Lekki Peninsula Scheme I | NTDA | Plycon Nigeria Limited | 129,636,533.02 | 6-7/03/2009 | 30% | 16 Weeks |
| 396 | Construction of Road No.78 at Lekki Peninsula Scheme I | NTDA | Plycon Nigeria Limited | 137,661,182.34 | 6-7/03/2009 | 30% | 16 Weeks |
| 397 | Construction of Road No.78A at Lekki Peninsula Scheme I | NTDA | Salfatex Company | 64,420,056.09 | 6-7/03/2009 | 30% | 16 Weeks |
| 398 | Construction of Road No.78B at Lekki Peninsula Scheme I | NTDA | Building Construction International Nigeria Limited | 65,028,184.49 | 6-7/03/2009 | 30% | 16 Weeks |
| 399 | Construction of Road No.78C at Lekki Peninsula Scheme I | NTDA | Salfatex Company | 47,913,282.40 | 6-7/03/2009 | 30% | 16 Weeks |
| 400 | Construction of Road No.78E at Lekki Peninsula Scheme I | NTDA | Shengli Land Global Nigeria Limited | 76,008,271.24 | 6-7/03/2009 | 30% | 16 Weeks |
| 401 | Construction of Road No.79 at Lekki Peninsula Scheme I | NTDA | Bal Builders Nig. Ltd. | 88,001,110.40 | 6-7/03/2009 | 30% | 16 Weeks |
| 402 | Construction of Road No.80 at Lekki Peninsula Scheme I | NTDA | Trade Quest Nigeria Limited | 88,001,110.40 | 6-7/03/2009 | 30% | 16 Weeks |
| 403 | Construction of Road No.95A at Lekki Peninsula Scheme I | NTDA | Rover Investment Nig. Limited | 49,205,887.78 | 6-7/03/2009 | 30% | 16 Weeks |
| 404 | Construction of Road No.23 Extension at Lekki Peninsula Scheme II | NTDA | Plycon Nigeria Limited | 188,291,081.63 | 22-23/05/2009 | 50% | 4 Months |
| 405 | Construction of Road No.107 at Lekki Peninsula Scheme II | NTDA | Plycon Nigeria Limited | 165,243,775.97 | 22-23/05/2009 | 50% | 4 Months |
| 406 | Construction of Road No.108 at Lekki Peninsula Scheme II | NTDA | Plycon Nigeria Limited | 99,650,921.14 | 22-23/05/2009 | 50% | 4 Months |
| 407 | Construction of Road No.109 at Lekki Peninsula Scheme II | NTDA | Plycon Nigeria Limited | 184,881,513.32 | 22-23/05/2009 | 50% | 4 Months |
| 408 | Construction of Road No.110 at Lekki Peninsula Scheme II | NTDA | Plycon Nigeria Limited | 72,989,026.92 | 22-23/05/2009 | 50% | 4 Months |
| 409 | Construction of Road No.110A at Lekki Peninsula Scheme II | NTDA | Plycon Nigeria Limited | 54,448,259.83 | 22-23/05/2009 | 50% | 4 Months |
| 410 | Construction of Road No.231 at Lekki Peninsula Scheme II | NTDA | Newport Development Limited | 195,886,534.88 | 22-23/05/2009 | 50% | 4 Months |
| 411 | Construction of Road No.281 at Lekki Peninsula Scheme II | NTDA | Weyland International Services Ltd. | 313,247,443.74 | 22-23/05/2009 | 50% | 4 Months |
| 412 | Construction of Road No.282 at Lekki Peninsula Scheme II | NTDA | Weyland International Services Ltd. | 71,234,395.85 | 22-23/05/2009 | 50% | 4 Months |
| 413 | Construction of Road No.291 at Lekki Peninsula Scheme II | NTDA | Newport Development Limited | 76,162,376.60 | 22-23/05/2009 | 50% | 4 Months |
| 414 | Construction of Road No.19 at Omole Residential Scheme Phase II | NTDA | Lad - Chrislord Limited | 215,000,000.00 | 22-23/05/2009 | 40% | 8 Months |
| 415 | Construction of Road No.54 at Magodo Residential Scheme (Shangisa Sector) | NTDA | Stabic Construction Limited | 220,000,000.00 | 22-23/05/2009 | 40% | 12 Weeks |
| 416 | Construction of Road No.17 (Part of) at Magodo Residential Scheme (Shangisa Sector) | NTDA | Stabic Construction Limited | 40,000,000.00 | 22-23/05/2009 | 40% | 12 Weeks |
| 417 | Construction of Road No.17A at Magodo Residential Scheme (Shangisa Sector) | NTDA | Stabic Construction Limited | 59,000,000.00 | 22-23/05/2009 | 40% | 12 Weeks |
| 418 | Construction of Road No.69 at Lekki Peninsula Scheme I | NTDA | Neesarm Ventures | 120,000,000.00 | 22-23/05/2009 | 30% | 6 Months |
| 419 | Construction of Road No.69A at Lekki Peninsula Scheme I | NTDA | Neesarm Ventures | 204,000,000.00 | 22-23/05/2009 | 30% | 6 Months |
| 420 | Rehabilitation of Admiralty Way and Portion of Adebayo Doherty at Lekki Peninsula Scheme I (Additional Works) | NTDA | Zainab Construction Nigeria Limited | 51,612,800.00 | 01/08/2009 | 4 Months | |
| 421 | Construction of Road Nos. 37 (Part of ) 39A, 43, 44, 44A, 46, 47, 48, 48A, 49, 51 and 52 at Lekki Peninsula Scheme II (Additional Works) | NTDA | Wetipp Nigeria Limited | 75,005,206.80 | 01/08/2009 | ||
| 422 | Construction of Road No. 1A at Lekki Peninsula Scheme I | NTDA | Neesarm Ventures Limited | 141,870,247.77 | 01/08/2009 | 30% | 12 Weeks |
| 423 | Construction of Road No. 49A at Lekki Peninsula Scheme I | NTDA | Saaiko Nigeria Limited | 116,346,220.56 | 01/08/2009 | 30% | 20 Weeks |
| 424 | Construction of Road No. 49B at Lekki Peninsula Scheme I | NTDA | Prime Metro Prop. Limited | 65,570,642.51 | 01/08/2009 | 30% | 20 Weeks |
| 425 | Construction of Road No. 49D at Lekki Peninsula Scheme I | NTDA | SKS Construction Limited | 114,077,196.88 | 01/08/2009 | 30% | 20 Weeks |
| 426 | Construction of Road No. 60D at Lekki Peninsula Scheme I | NTDA | Intercon Limited | 100,876,904.88 | 01/08/2009 | 30% | 20 Weeks |
| 427 | Construction of Road No. 61B at Lekki Peninsula Scheme I | NTDA | Al - Raufu Nigeria Limited | 46,460,141.87 | 01/08/2009 | 30% | 12 Weeks |
| 428 | Construction of Road No. 61C at Lekki Peninsula Scheme I | NTDA | Al - Raufu Nigeria Limited | 81,720,194.72 | 01/08/2009 | 30% | 20 Weeks |
| 429 | Construction of Network of Roads including Electrical and Mechanical Services at Foreshore Scheme, Lekki Phase I | NTDA | Plycon Nigeria Limited | 2,999,999,999.00 | 05/08/2009 | 40% | 24 Months |
| 430 | Construction of 24,000 Gallons Capacity Water Tank at the VIP Chalets, Badagry. | Office of Chief of Staff | CFAO Structec | 16,146,927.15 | 15/10/2008 | 70% | 8 Weeks |
| 431 | Supply of One (1) Unit of E-3500 Portable Explosive Detector and Three (3) Units of Sweep Master Surveillance System | Office of Chief of Staff | Full Security Nigeria Limited | 12,183,750.00 | 31/07/2009 | 70% | 5 Weeks |
| 432 | Upgrading and Improvement of Surulere/ Port Novo Creek Stormwater Drainage Channel Phase II (System 5 Drainage Channel Network from Alhaji Masha to Babs Animashaun to Badagry Expressway/ Onilewura to Baale to Tin - Can Island/ Port Novo Creek) | Office of Drainage Services | Bam - Darley Nigeria Limited | 2,300,000,000.00 | 16/04/2009 | 50% | 26 Weeks |
| 433 | Upgrading and Improvement of Shomolu Stormwater Drainage Channel Phase II (System 2 Drainage Channel Network from Apata to Fola Agoro to Unilag Road to Iwaya to Lagos Lagoon) | Office of Drainage Services | Zapex Construction Limited | 700,000,000.00 | 16/04/2009 | 50% | 9 Months |
| 434 | Dredging of Ajanaku Channel, Badagry | Office of Drainage Services | Ospal Global Resources Limited | 34,000,000.00 | 16/04/2009 | 50% | 10 weeks |
| 435 | Dredging of Agbovipe Channel, Badagry | Office of Drainage Services | Sherbourne Ventures Limited | 63,000,000.00 | 16/04/2009 | 50% | 16 Weeks |
| 436 | Dredging of Main Itoun Channel, Badagry | Office of Drainage Services | Gtoj Construction & Plants Limited | 64,000,000.00 | 16/04/2009 | 50% | 3 Months |
| 437 | Dredging of Afowo Channel, Badagry | Office of Drainage Services | Gtoj Construction & Plants Limited | 47,000,000.00 | 16/04/2009 | 50% | 2 Months |
| 438 | Dredging of Ajara/ Aganmade Channel, Badagry | Office of Drainage Services | Joysol Enterprises | 34,000,000.00 | 16/04/2009 | 50% | 10 weeks |
| 439 | Dredging of Igbogbele Channels, Badagry | Office of Drainage Services | Kolad Concept Limited | 34,000,000.00 | 16/04/2009 | 50% | 12 Weeks |
| 440 | Dredging of Ajara/ Agelaso Channels, Badagry | Office of Drainage Services | Swan Dredging & Marine Limited | 36,000,000.00 | 16/04/2009 | 50% | 12 Weeks |
| 441 | Construction of Karimu Kotun/ Akin Adesola/ Sanusi Fafunwa Collector Drain, Victoria Island | Office of Drainage Services | Rabjhob Project Nigeria Limited | 40,000,000.00 | 16/04/2009 | 50% | 16 Weeks |
| 442 | Construction of Samuel Manuwa/ Festival Road/ Adetokunbo Ademola Collector Drain, Victoria Island | Office of Drainage Services | RJ Construction Limited | 15,000,000.00 | 16/04/2009 | 50% | 10 Weeks |
| 443 | Construction of Akin Adesola Collector Drain, Victoria Island | Office of Drainage Services | Sultas Building & Civil Engineering Limited | 29,000,000.00 | 16/04/2009 | 50% | 14 Weeks |
| 444 | Construction of Ligali Ayorinde Collector Drain, Victoria island | Office of Drainage Services | Charvet Building, Civil & Water Engineering | 105,000,000.00 | 16/04/2009 | 50% | 20 Weeks |
| 445 | Construction of Igboefon Ologolo Aro Collector Drain, Eti-Osa | Office of Drainage Services | Teekem Global Ventures | 215,000,000.00 | 31/07/2009 | 50% | 18 Weeks |
| 446 | Construction of Aro Maiyegun Collector Drain, Eti-Osa | Office of Drainage Services | Mafinco Nigeria Limited | 155,000,000.00 | 31/07/2009 | 50% | 24 Weeks |
| 447 | Construction of Maiyegun Osapa Trapezodial Channel, Eti Osa | Office of Drainage Services | Gtoj Construction & Plants Limited | 135,000,000.00 | 31/07/2009 | 50% | 18 Weeks |
| 448 | Construction of Osapa Lagoon Trapezodial Channel, Eti Osa | Office of Drainage Services | Bullrun Resources Limited | 900,000,000.00 | 31/07/2009 | 50% | 24 Weeks |
| 449 | Rehabilitation and Modification of Abesan Sewage Treatment Plant, Abesan Low Cost Housing Estate | Office of Drainage Services | Sheffield Nigeria Limited | 27,000,000.00 | 31/07/2009 | 50% | 12 Weeks |
| 450 | Rehabilitation and Modification of Oke Afa Sewage Treatment Plant, Oke Afa Low Cost Housing Estate | Office of Drainage Services | Lukade Construction Nigeria Limited | 39,300,000.00 | 31/07/2009 | 50% | 14 Weeks |
| 451 | Rehabilitation and Modification of Iponri Sewage Treatment Plant, Iponri Low Cost Housing Estate | Office of Drainage Services | Mellos Global Manor Limited | 32,000,000.00 | 31/07/2009 | 50% | 12 Weeks |
| 452 | Landscaping and Beautification of Onipanu Triangular Lay - By Opposite Shipeolu Junction and Between Obanikoro and Anthony. | Office of Environmental Services | Shodex Beautification Landmark | 100,000,000.00 | 15/10/2 | ||